Sign in

You're signed outSign in or to get full access.

Sigma Lithium - Q1 2024

May 16, 2024

Transcript

Ana Cabral Gardner (CEO)

Hi, good morning.

Matthew DeYoe (EVP)

Hi, Ana. Yeah. We'll have, Dennis is gonna lead with some comments.

Ana Cabral Gardner (CEO)

Okay, thank you.

Operator (participant)

Good morning, everyone. My name is Dennis, and I will be your operator today.

Matthew DeYoe (EVP)

I'll read this-

Operator (participant)

Welcome to the Sigma Lithium First Quarter 2024 Earnings Conference Call. Today's call is being recorded and is broadcast live on Sigma's website. On the call today is Company CEO, Ana Cabral Gardner, and Company Executive Vice President, Matthew DeYoe. We will now turn the call over to Matthew DeYoe.

Matthew DeYoe (EVP)

Thank you, Dennis. Good morning, everyone. Thank you for joining us on our first quarter 2024 earnings conference call. On the call with me today is Company CEO, Ana Cabral. This morning, before market open, we published our 1Q earnings release and posted our financial results, which would be available through SEDAR and SEC. Before we begin, I'd like to cover two items. First, during the presentation, you'll hear certain forward-looking statements concerning our plans and expectations. We note that actual events or results could differ materially from changes in market conditions and our operations. Additionally, earnings referenced in this presentation may exclude certain non-core and non-recurring items. Reconciliations to the most comparable IFRS financial measures and other associated disclosures, including descriptions of adjustments, can be found in the back of the release. With that, I'll pass it over to Ana. Ana?

Ana Cabral Gardner (CEO)

Hi. Thank you, Matt. Good morning, everyone. We're delighted to present you with our first quarter 2024 results. Without further ado, I encourage you to go to the following page. We are extremely enthusiastic about our prospect as we have been advancing towards key catalysts of our pro- plan to double production capacity by 2025. The four key deliveries of this quarter were, first, the delivery of an increased premium pricing, where we achieved a fixed floating formula of 9% of the London Metals Exchange lithium equivalent, basically reaching a $1,290 pricing. That represents an 11% increase to the April 24 realized pricing, the numbers we released for the first quarter of 2024.

So that clearly demonstrate that the pricing trend is upwards, an 11% increase from previous month and an overall almost 30% increase from the average pricing of the previous quarter. The second catalyst is that we have been reaching our marks on achieving a low cost of production. We became the world's second lowest cost lithium concentrate producer this quarter, reporting the cost of $397 per ton. So more importantly, we have also managed to increase the operating life of the company to 25 years. We increased mineral reserves by 40%, auditing 77 million tons, 43-101. We also made a final investment decision on a fully funded expansion to double production to 520,000 tons annually, equivalent to 70,000 tons LCE.

On the next page, we demonstrate that we've been delivering our vision to combine this large-scale production with low cost and highest standards of environmental and social sustainability in lithium. These three elements are rarely achieved together. More often than not, scale and cost are achieved at the expense of traceability and environmental high standards. Alternatively, scale and traceability and environmental and social high standards are achieved at the expense of delivering a resilient business, maintaining lowest production costs. Here we are delivering on all the three, rather paradoxically, fronts. The next slide illustrates one of our key deliveries for the quarter, demonstrating how we became the fourth largest producing lithium industrial mineral complex globally. Sigma now is the first non-Australian in the top five. We're trailing behind Greenbushes, Pilbara, and Wodgina.

Grota do Cirilo is now at 4.8 million tons of LCE equivalent, with a very high-grade average at 1.4%, and that's the result of a very well-concatenated exploration, development, and feasibility deliveries achieved over the last 12 months. In this quarter, we delivered feasibility, and therefore we declared mineral reserves of 77 million tons, which were increased in 40%. It's a significant milestone. Why is that? Because it lengthens the life of the project to 25 years, and therefore, as we expand to double capacity, we now have an operation that is sustained for 25 years. That is a moving target. In other words, as we move forward with our expansion plans, we will continue to unlock and transform the mineral resources we have into mineral reserves, backing up a similar duration in operational life.

Therefore, with this Mineral resource work executed, we demonstrate that Sigma Lithium is not at all constrained by the scale, the sheer scale of the mineral resources available on its properties. Here, we just are demonstrating the mineral resources in one of our four properties. With that, I move forward to the following page, to page 7, where we again deliver on the mathematics of our numbers. We love mathematics because numbers don't really bring an opinion with them. In 2024, as we, you know, discussed, we are delivering on every operational target we set out for ourselves. Some of those were quite ambitious. And again, the numbers demonstrate the resilience and the longevity of our project, essentially combining scale, costs, and the highest global standards of environmental and social sustainability.

We are sustaining nameplate capacity. We have been sustaining nameplate capacity since December 2023. In the first 10 months of production, we already reached 178,000 tons, which delights us all, given our pioneering dry stacking circuit of the dense media separation industrial plant, the Greentech plant. In parallel, the highest premium and the highest quality that our product exhibits is translated into premium pricing, and we have been able to do that consistently. The economics for our ninth shipment is again reaching our mark of capturing a 9% share of the value of the lithium hydroxide posted at the London Metals Exchange, which is now it's equivalent to $1,290 per ton.

That number is a fixed floating formula, and it will be adjusted by that lithium metals exchange price, one month after the delivery. We were able to achieve that and in parallel, to deliver on our very low marks, on our very ambitious marks of a low cash cost at the plant. So we got to $397 per ton at industrial plant gate, which basically places as the lowest cost producer amongst all lithium concentrate hard rock producers, all of our peers in Australia. So we're demonstrating that despite not yet getting to that scale, we have the cost discipline to be at the second, position, which makes us incredibly resilient to, lithium cycles. So we're here to stay.

In the meantime, we've also maintained our liquidity, so our cash position on March 31, at the end of the quarter, was $108 million. So phase 2, the second Greentech plant construction that will deliver double capabilities, is fully funded with cash at hand in the balance sheet, and we will continue to work on improving the capital structure to fund that construction. But regardless, the funding is in the bank as we speak, so we'll keep going with the construction project to meet our delivery timetables of around this time next year. We've been initiating the construction with earthworks engineering, design, the teams. We have our second construction team in place, so we bifurcated our teams so that we ensure reliable, timely, and on-budget delivery of the second GreenTech plant.

And again, it will lead us to double capacity to approximately 70,000 tons of LCE equivalent or 520,000 tons of lithium concentrate. And lastly, we already talked about this: we delivered the longevity that will back up the operational life for 25 years with a 77 million ton proven and probable mineral reserve. And again, it's always very-- it makes us very proud to remind everyone that we're the only global producer that has achieved the zero carbon very sought-after objective, so that we're delivering lithium products aligned with the ethos of the electric car industry that we service. So on the next page, I'll initiate this section, and then I'll hand over to my partner, Matthew DeYoe.

We wanna again reiterate how resilient and how reliable and how consistent our business has been since we made our first shipment. We have reached scale during 2023, and we have been shipping, like clockwork, 22,000 tons, approximately, of lithium concentrate materials every 35 days. More importantly, at the trough of the market, we actually initiated a premiumization drive that have been delivering these premium prices through auction/price discovery conversations with our customers. That demonstrates that we've been increasingly gaining commercial leverage as our clients try, and experience the savings they can achieve with our product, which reached 20%-30% over competing products in the marketplace. And that translates in commercial leverage.

Mathematically, we demonstrate that with a 25% increase from the realized prices in the first quarter, in this May ship. So, the page illustrates also in the two colors, in yellow color, what we believe to be the market benchmark, and in the blue color, what we believe to be our own pricing benchmark. So as you can see in the arrows from the February, which is Lunar New Year, at troughs of the industry onward, we've been able to premiumize 25% our prices. From last month alone, we were able to achieve an 11% price increase.

So that's again, a mathematical numeric demonstration of increased commercial leverage. And it results in a partnership, in a win-win partnership with our clients, given that our product does bring the clients, a measurable chemical savings, if compared to, other available competing products in the marketplace. So by no means is a win-lose game.

It's just the flourishing of commercial partnerships with our clients. And at the chart, we also illustrate the translation of our prices into value capture of the lithium hydroxide as priced in the London Metals Exchange, where we've gone from 8.75% of it to 9% of the index. So, an increased value capture over the lithium hydroxide chemical, and again, in a mathematical demonstration of this, partnership with the clients that win as they acquire our product. Typically, the average premiumization we've been achieved hovers around 10% over the similar competing products, which again, given that we bring 20%-30% of cost savings to our clients, it clearly demonstrates that the clients are still achieving a 20%-10% savings. So clearly a win-win relationship with our esteemed customers.

On the next page, it's interesting when we place cost in perspective. We're demonstrating that Sigma is one of the lowest cost producers in the world. We clearly secured our position in the global supply chain. We have a low-cost and traceable, sustainable product. And more interestingly, we show that this market hinges on a, let's say, fine balance, given that the trinity we discussed earlier, is not always easily achieved by lithium producers. In other words, to combine low cost, sustainability, and a scale is actually the only thing that's rare in the lithium industry. In other words, exceptional execution. So that's what we've been able to deliver. And here in green, you can see Sigma as this, you know, the second lowest cost producer.

This is actually a benchmark minerals standard cost curve, and we're also highlighting in brown the producers that sit on the traceability zone of producing countries. So when you add up those players, this is a hard rock cost curve with the other brine source material from the traceability zone, you actually end up with just 900,000 tons of LCE equivalent projected for 2025. If you add up everyone in the low-cost traceability quartile all the way up to the midpoint of the cost curve, you end up with 1,000,000 tons of LCE. Why am I making this point?

If you please turn over to the next page, page 11, you can clearly see that the lithium demand being robust and the supply of medium to low-cost sources being what it is in the previous page, and again, that's a Benchmark Minerals cost curve. If you look at 2024, this year, we're hinging on a fine balance. I mean, these are demand estimates, again, from Benchmark Minerals. And when you look at 2025, unless something miraculous happens, we're gonna be reaching a slight tension point. What does that mean? It means something very similar, simple. Prices will have to move again, upwards, inching towards the higher production cost zone, so that it brings forth the product from the higher cost producers to meet the supply/demand equilibrium.

So the numbers on this page have to be observed in tandem with the numbers on a previous page, so that when we look at the gap, we can mathematically see why the gap, it has been covered or will be covered increasingly with high cost product, unless another Sigma pops up. And on that, it's important to note that if the 2030 projections or 2027 projections are correct, and we do believe they are based on sheer EV them, EV growth in China alone, as you can see on the charts on the right, the world will need between 30 and 50 new segments that will have to pop up between now and 2030.

Which again demonstrates that on the low cost, traceable, and large scale, there's clearly a shortage of operational companies. So prices will eventually have to move to make feasible the high cost, you know, traceability challenge of products on the right end of the cost curve that we saw on the previous page. With that, I will move to the next section, and I'll pass over to Matteo, my partner here, so that he can discuss some of our financial first quarter 2024 earnings highlights.

Matthew DeYoe (EVP)

Thank you, Ana. So in the first quarter, the company sold 52,857 tons of lithium concentrate, which composed of two full shipments and a partial sale of warehoused inventory to Glencore towards the end of the quarter. Production totaled just over 54,000 tons. Reported revenue on the quarter totaled $37.2 million, which included a $12 million impact from provisional adjustments associated with prior shipments, particularly our November shipment. This reduction, or this is a reduction versus the $30 million we experienced in 4Q. The company assesses revenue for business conducted during the first quarter at $49 million, and against our volumes, that would imply a realized price for business, again, conducted in the first quarter of $930 a ton.

Operating cash costs per ton at plant gate of $462 a ton, down about 16% sequentially and delivers a 50% FOB margin against that $930 per ton price. Reported adjusted EBITDA of $6 million drives a margin of nearly 16%, though again, we assess EBITDA for business conducted in 1Q, and thus excluding the provisional implications at about $17 million, which reflects an EBITDA margin closer to 35%. Importantly, as we want to note, as prices rallied during the first quarter, the implications of these provisional adjustments subsided. And given our fixed shipment in April and the material correction we've seen in market prices, these adjustments should be immaterial going forward. I want to move, I guess, to our cost bridge. We believe our guided targets are very much in reach.

Importantly, as well as we're moving past much of the noise associated with commissioning activity, it's really helping us deliver a much cleaner quarter and a much cleaner look into the company's advantaged cost structure. Cash cost per ton, as Ana had mentioned earlier, was $397 for the first quarter, which drives an FOB cost at Vitória of $462. Differential here to COGS represents only royalties, non-cash D&A, and a small stocking effect associated with production of concentrate in 1Q that will sell in the second quarter. As we said, though, guidance is clearly within reach. Recall from our earlier conversations, the company expects to hit $370 a ton plant gate and $420 FOB Vitória during the second quarter for the 3Q. Absolute dollar costs are already there.

As you can see, the main hindrance for achieving these numbers in 1Q was production, as a normalization for cost base for 4Q production would leave plant gate costs at $359 in the first quarter. Production improved through the course of the first quarter, leaving us confident again that we can hit these targets, which would put us comfortably, although we already are, at the second-lowest cost hard rock project in the world, at least that we know of. Next, I'll move to our cash balance. So as Ana had mentioned, we ended 1Q at $108 million, which primarily reflects the cash gained from trade finance or trade facilities, partially offset by an annual interest payment and a modest build in working capital.

Operations proved to be neutral to our earnings formula as revenues were offset by a partial adjustment in operating costs. Going forward, as we had mentioned, as prices improve, we should move past provisional headwinds, and we should begin to accrue substantial amounts of free cash. The next slide points to what we believe to be the cash flow potential on the recurring basis. The model or the column at current price or $11.60 reflects broadly the current market, while the costs to our targets, though, as stated above, within reach. This isn't an explicit cash flow guidance for this year, as the numbers just portray at capacity and don't reflect perhaps the realities of 1Q, but it gives a good idea of the potential of the company on a go-forward basis.

As you can see, we're comfortably above the $100 million required to fund our expansions. With that, I'll pass it back to Ana.

Ana Cabral Gardner (CEO)

So going straight to the point where Matt left off of doubling production capacity, again, we show the drone aerial picture of the simplicity of that project, and you can clearly see in the back the expansion area highlighted in red, where we already have the truck maintenance patio installed. It's an area without vegetation. It's pretty--it's basically former pasture areas, so very straightforward, perpendicular to the elevation of the terrain, perfect for the installation of a ROM pad that will feed a second Greentech production plant.

That second line train will be equivalent to the one out, highlighted in yellow, and it will be sustained by the existing infrastructure in green, which also could sustain a third Greentech line expansion, which we do plan to execute the moment we commission the second Greentech plant. Infrastructure, which costs us almost $40 million-$45 million, is no longer necessary because it sustains two additional Greentech plant expansions. So with that, we again would like to reiterate that the cash to build it is at hand. We've been able to secure robust and resilient trade lines as a result of our consistent, resilient performance of production, shipping, delivery, and customer acceptance of our product throughout the first 10 months of operation. So that reliability gives us access to trade line mandatory funding.

It's called ACEs in Brazil, Advancements on Export Contracts, which are the main source of funding for this construction at the moment. It's cash sitting in our treasury right now. We will continue to work to improve the capital structure for the construction of the project. We have a very interesting plans to tap debt capital markets, debt loan markets throughout the course of the next few months. But without it, or irrespectively of it, or irrespectively of any additional source of financing, we are confident that we can carry on and execute our doubling of production capacity plans. Again, the commercial uptake is there. We could be selling far more boats if we had the material to deliver. Ultimately, we're sitting in a very comfortable position in the industry now.

So our objective is to continue to bank on the, you know, comfort of our business position in the global lithium industry at the moment. So here, the following page just shows again the only thing that's rare in the lithium industry, which is exceptional execution. So we're gonna do it again. We've already done the licensing of the industrial plant. We've achieved the initial financing through securing of the trade lines. We completed the engineering, FEL3 CapEx quoting, throughout the course of the last year, essentially. We've been working at this for actually more than 12 months, as of now. We actually are comfortable with the capital structure we have.

We're gonna work to improve it and finesse it, but again, at average, 9.3% cost for trade lines, that's a pretty reasonable cost, considering the returns we will achieve out of volumes and production on a cash generation basis. And so with that confidence, and with the confidence in the execution ability and execution prowess of our team, our board of directors cleared and gave us the final approval and final investment decision for the construction of phase two in the quarter. With that, I go on to the next page. So Matt, passing on to Matt.

Matthew DeYoe (EVP)

Yeah, I mean, again, from the perspective of the company, right? We have a unique track record of being able to build on time and on budget, and we're going to do that again. So as Ana had mentioned, April first, Sigma's board of directors issued the phase two FID. As we said, the CapEx budget is only about $100 million to add 250,000 metric tons, which is enough lithium equivalent for about 850,000 EVs. EPCM teams are finishing earthworks engineering and mobilization is ongoing, and phase 2 flow sheet importantly follows phase one. The goal is to reduce risks as much as possible as we go through this process. The local EPCM team is the same. The parts design team is the same.

We're going through phase 2 with the knowledge and experiences gained through phase one, which should mean a faster ramp and a faster path to free cash flow as we move forward. This is just in a, you know, higher level path to where we're going, and as Ana had mentioned, there's a third phase coming on the back end, which is already supported through the infrastructure.

Ana Cabral Gardner (CEO)

Yeah. So here is kind of the whole picture, right? This is the industrial plan we submitted to our development bank and to our investors earlier in the year, and that kinda shows graphically where we are and where we have it, and how disciplined we have been in adding production capacity, based essentially on the one element in short supply, our ability to execute on time and on budget, and comfortably. Because we're maintaining our operations at the highest standards of performance we set out for ourselves. So we got here in 2023, what we've delivered, over the last 12 months. So, 2023 today actually is 175,000 tons produced, so that goes over to now. Then we have that cash flow to propel us and to give us a base. That's our safety net, let's put it that way.

And then, if you annualize 24 from now, we would have 270,000 tons of production, and again, furthering that safety net of cash generation. So we're building double capacity, approximately double capacity, another Greentech line at 250,000 tons. So we're in construction of, you know, what equates to 35,000 tons LCE. And then again, we're gonna do the third line, as I've shown you earlier with the drone pictures, that's supported by the existing infrastructure, that will get us to another 250,000 tons. So you get us to 770,000 tons, so of annual capacity. So approximately, what we call the magic number of 100,000 tons of LCE a year.

Gentlemen and ladies, there are very few companies that can actually deliver and operate at these levels, and they're called the super majors. With our conservative and disciplined execution, we plan to get there, most likely at the beginning of 2026, with three Greentech production lines. We are already on the way with the ongoing earthworks construction for the second one. One point that's important, if warranted, and again, it will be a function of the premiumization, we do have plans to, in 2026, potentially building an integrated intermediate chemicals line connected to the third line. Again, that is already in the works. We've been scouting locations for a potential setting of this industrial plant.

Given that, as we like to say in our industry, 2026 is literally around the corner in the metals industrial industry time. 18 months away. So with that, I go on to the closing remarks. I mean, essentially, the future has arrived. I mean, Sigma is the sixth largest producer globally. We are on the way to become the fourth, as soon as we conclude the construction of the second, Greentech plant. We have the same team, the same execution, the same engineers, even the same suppliers. That's how conservative we have been. So, the one unfortunate thing that hasn't happened is that we have not repriced from developer to producer, but we believe that with our resilience and with the cadence and the continued successful execution, that shall happen in due course.

And clearly, you can see on this slide an illustration of the disconnect between Sigma and its peer producers. The following page illustrates that further using fractions, which is a very clear way of pro-rating valuation to production. So if we were to do that exercise comparing to an Americas player or an Australian player, we would end up a similar disconnect, asymmetrical results. So this is an exercise that just shows why are we so steady steadfast on delivering a cadence execution, consistent execution throughout the year, because we do plan to close that gap with mathematical deliveries. And again, it's just a fractional pro-rating of our current market cap with the market cap of players in the Americas or players in Australia, vis-a-vis the production they actually deliver currently today.

Our production, for instance, if compared to a player in the Americas, is essentially a fifth. However, our market cap isn't a fifth of theirs. If you were over to the west, to the east, to Australia, our production is half of a very large player in Australia, but our market cap is a lot less than half. It's almost a fourth of their market cap, which again, demonstrates such disconnect. And with that, I'll close. And again, with the key valuation, with the key valuation benchmarks that we have already delivered, and again, outlining the targets that we set out for ourselves, which are actually quite ambitious. I mean, first, we are planning to achieve the cost guidance we set out for ourselves.

We are already the industry's second-lowest cost player, and we do plan to stay that way. However, we have a few more dollars of costs to shave from our C1 plant, plant cash costs. And we're planning to march towards that further cost savings as we reach an operational cadence, reaching a year of operations. I mean, again, it's actually important to remind everyone that this is to our first year. So technically, we should have given ourselves some margin for commissioning, but we haven't, because the lithium pricing environment didn't allow us to have any margin of errors. So we set out to meet the ambitious low-cost targets almost out of the gate, and here we are.

The next milestone will be to commission the second Greentech production line, and we're already up with earthworks construction engineering underway. So we do believe that we're gonna meet the same exact construction milestones as last time. We have the same team, similar leadership, engineers the same. Everyone's basically the same as I said earlier, not even suppliers we're risking to change. That's how conservative we are. So it's basically a repeat of what we've done before, one line at a time. So this is on the left, how much we delivered, and you can see for yourselves, I mean, we deliver zero carbon.

We expanded the resource to estimated resource to 150 million tons, and we're drawing from that resource into proven and probable 2P reserves, which we just increased on feasibility to 77 million tons, expanding 40%. We've been delivering consistent monthly shipments of around 22,000 tons every 35 days. We mobilized phase two, delivered the final investment decision of phase 2, began construction. So again, we set up a target, we focus execution and we deliver, which, as I will reiterate again to close, is the one thing that's scarce in this industry: superb execution, superb resilience, as it has been demonstrated by our team, which faced market headwinds in our first year of operations and came out the industry second lowest cost producer and, sixth largest-- second lowest cost, sixth largest producer.

Thank you everyone for your trust, thank you everyone for your confidence in us. With that, I close our first quarter 2024 earnings presentation, and we'll take questions.

Matthew DeYoe (EVP)

Yes, thank you. Dennis, if you can move now to Q&A, that would be great.

Operator (participant)

If you would like to ask a question, simply press star, then the number one on your telephone keypad. Once again, to ask a question, please press star one on your telephone keypad. Your first question is from the line of Rock Hoffman with Bank of America. Please go ahead.

Rock Hoffman (Equity Research Associate)

Just so wondering, can you provide the latest regarding the strategic review, and is that currently on pause?

Ana Cabral Gardner (CEO)

Yes, it is. We've been publicly reiterated that's on pause, and again, the reasons are quite clear. I mean, there's an asymmetrical disconnect between what we believe our fair value should be, and we decided to given the strength and resilience of our operation, that we'll just continue to deliver. We have a fantastic business, and there's absolutely no pressure to conduct any review from our end. So we will deliver on the targets we set out for ourselves and probably emerge two years from now and decide what we were gonna do for the next phase of growth.

Rock Hoffman (Equity Research Associate)

Understood. Just to follow up, in regards to the LG press release regarding our arbitration, just wondering what the timeline is on that and any updates in that process?

Ana Cabral Gardner (CEO)

Well, we have a very friendly relationship with the LG Group and with South Korea. And there are gonna be more positive news on that end that we're gonna publicize in due course. But what I can say as of now is that the commercial relationship actually couldn't be better with the LG Group as a whole, and that includes their trading arms, which was actually visiting our plant facilities at the time. Another subsidiary of the group initiated arbitration, and kind of made everyone rather dumbfounded. But again, that's been mended, and we just want to reiterate how we have a fantastic relationship with both the government of South Korea and with LG Group as a whole. And we don't see any reasons to worry about it.

Rock Hoffman (Equity Research Associate)

Okay, thanks.

Matthew DeYoe (EVP)

Dennis, if you want to move on to the next question.

Operator (participant)

Of course. Your next question is from the line of Mac Whale with Cormark Securities. Please go ahead.

Mac Whale (Managing Director, Institutional Equity Research)

Hi, good morning, guys. Congratulations on bringing the cost down quite handily. I was wondering, can you speak a little bit to-- I saw two big items in there versus Q4 in mining services and consumables. What- Why such a big decrease in those two items in particular?

Matthew DeYoe (EVP)

So, hey, Mac. On the consumable side, we got pretty effective in using our ferrosilicon and recycling that through the process. If you'd recall as well, we installed the magnetic separator in November, and part of that was on the tailing side of the equation and being able to improve our recyclability of ferrosilicon through our process. Also, some of these purchases may be a little bit lumpy, but we are getting better at optimizing and running the plant. So, that's going to explain a good portion of the consumable side. The decrease in the shared services, I'll have to double-check, but look, as part of what we've said, we're removing a lot of on-site contractors and replacing them with domestic and local labor.

So as the roll-off happens, you're gonna see perhaps an overall reduction in costs, but also a little bit of left pocket, right pocket, as some of that stuff gets allocated and reallocated through our cost lines, if that makes any sense.

Mac Whale (Managing Director, Institutional Equity Research)

Yeah, that's helpful. And then on the G&A, your various sort of underneath the operations line on the, in some of your costs for G&A, in particular, was lower. Is that a good run rate now when we should look at those line items going forward?

Matthew DeYoe (EVP)

Yeah, look, G&A is. Obviously, as we tried to portray on our four-Q call, right? There's a ton of noise and clutter in the annual SG&A number, and we had a lot of confidence that would come down. To the extent the strategic review is paused, obviously, some more of costs will come out of the business, but it's at a pretty good level, considerably lower than where we were. And again, some of these productivity initiatives that we've been taking take a little bit of time to move through the system. You know, you can't shut off all costs at the end of the year, some of that stuff bleeds. But, you know, the goal is to keep a very draconian approach on all costs.

If you talked to me recently, what I say is I really love $1,200 a ton spodumene because, you know, we can generate cash, and we can grow in this market, but it also keeps everybody honest on costs. And so, you should expect the same level of, I can't use the word draconian, but, you know, intensive cost control internally at Sigma to continue to deliver on these numbers to the best we can.

Mac Whale (Managing Director, Institutional Equity Research)

Do you think this is the--as the environment for pricing improves, are we gonna see, like, how will these provisional pricing situations change as we move through the year?

Ana Cabral Gardner (CEO)

I'll take that. Hey, Matt, it's Ana. The provisional pricing is, we believe, a commercial element of the past, and in our case, it doesn't really connect with, as much with the market environment, but it's 100% connected to us, basically, beginning in the marketplace. A lot of what our clients' experience of our product had been to what we call bulk samples, 100-ton, 200-ton samples. But this last 12 months was the first time they actually got to try full tonnages, and as it happened, the clients experienced a 20%-30% cost savings that our product brought to them, by themselves. So they actually measured in their own refineries, the cost savings.

So that actually moved our commercial conversations to a completely different level, because as we like to say, lithium prices globally are still in its infancy. It is as if copper concentrate and iron ore got married, and lithium prices for concentrate would borrow from each. Like, you would borrow purity from copper concentrate, and you would borrow lump size from iron ore, and we weren't seeing any of it in our high-purity, coarse, lumpy product. So we believe that as the clients experience the product and saw for themselves the cost savings we brought to their refineries, they will be more amenable to a non-provisional and final price conversations. We demonstrated that first with the fixed pricing that we delivered last month. It was fixed and final, just like the great players in the industry, like ALB and others.

And then we now, this month, we moved to what we call the best place, the holy grail of pricing, which is the fixed floating formula, where we work with our clients. That's why we say it's a partnership. We're not fixing at their expense. We're floating to their quote, which is hydroxide LME, but we're fixing our value capture to their quote. So we're being friendly with the industry because it floats with them, so we're not squeezing anyone's margins, but we're capturing what we believe to be our premiumization in those prices. And that's how we would like to stay throughout the year.

Matthew DeYoe (EVP)

I'd say, Mac, I think the last thing, right, it's a little switch, right? We did April was locked in firm price. May, we have the firm 9% lock, but on the floating--look, we're fairly confident we're towards the bottom end of the cycle here on price, so we wanna retain some of the optionality of that as the cycle improves over time.

Ana Cabral Gardner (CEO)

Yeah.

Matthew DeYoe (EVP)

And so locking the commitment on the 9%, but keeping some optionality on the cycle, and that's, you know, we're a low-cost producer, and, and you're investing in a lithium company. We wanna give everybody, and everybody should have the economics on the upside, so that's all.

Ana Cabral Gardner (CEO)

Exactly. This is essentially the core building, the customer partnership, which again, you look at the copper concentrate industry, the iron ore industry, that's how these industries evolved into the premium pricing. And so we believe in partnership with our customers, and this is exactly what we're doing.

Matthew DeYoe (EVP)

Thank you. Yeah, Dennis, if you wanna reprompt, but otherwise, we can close down.

Operator (participant)

Once again, if you would like to ask a question, simply press star one on your telephone keypad. At this time, you may continue with closing remarks.

Matthew DeYoe (EVP)

I'll just leave it there. Thank you, everyone, for joining our call. We look forward to updating you as shipments and the company progresses through our 2Q build, and we'll look forward to re-engaging on 2Q earnings. Enjoy the rest of your day. Thank you.

Ana Cabral Gardner (CEO)

Thank you. Thank you, everyone.