Sign in

You're signed outSign in or to get full access.

Onto Innovation - Q3 2023

November 9, 2023

Transcript

Operator (participant)

Good day, and welcome to the Onto Innovation third quarter earnings release conference call. Today's conference is being recorded. At this time, I would like to turn the conference over to Mike Sheaffer, Investor Relations. Please go ahead.

Mike Sheaffer (Senior Director of Investor Relations)

Thank you, Rachel, and good afternoon, everyone. Onto Innovation issued its third quarter financial results this afternoon, shortly after the market closed. If you did not receive a copy of the release, please refer to the company's website, where a copy of the release is posted. Joining us on the call today are Michael Plisinski, Chief Executive Officer, and Mark Slicer, Chief Financial Officer. I would like to remind you that the statements made by management on this call will contain forward-looking statements within the meaning of federal securities laws. Those statements are subject to a range of changes, risks, and uncertainties that can cause actual results to vary materially. For more information regarding the risk factors that may impact Onto Innovation's results, I would encourage you to review our earnings release and our SEC filings.

Onto Innovation does not undertake the obligation to update these forward-looking statements in light of new information or future events. Today's discussion of our financial results will be presented on a non-GAAP financial basis, unless otherwise specified. As a reminder, a detailed reconciliation between GAAP and non-GAAP results can be found on today's earnings release. I will now go ahead and turn the call over to our CEO, Mike Plisinski. Mike?

Michael Plisinski (CEO)

Thank you, Mike. Good afternoon, and thank you for joining the call today. We finished the third quarter just above the midpoint of guidance for operating income and earnings, despite top-line revenue near the low end of guidance. This financial performance is just beginning to reflect the improvements from the initiatives we outlined in July. Shortly, Mark will outline how we expect to accelerate additional improvements through the next several quarters. Now I'll share what we see as a new wave of opportunities for Onto Innovation, following recent visits with several customers in Asia, including those leading the innovations in memory and packaging that are enabling this new era of artificial intelligence. Gartner estimates that today, semiconductors supporting artificial intelligence are estimated to represent less than 10% of the approximated $500 billion semiconductor market.

By 2030, the overall market for semiconductors is expected to double, reaching $1 trillion in revenue. However, semiconductors supporting AI are expected to increase six to eight times, reaching $300 billion-$500 billion in sales, as applications and hardware migrate from data centers to edge computing. Just as advanced packaging was critical to ushering in the mobility era, we believe it will be critical to this new era of artificial intelligence. By using the latest 3D and 2.5D packaging technologies, companies like NVIDIA are able to deliver the performance required by end markets while delaying the higher costs of migrating to more advanced nodes. Controlling the formation of these 3D and 2.5D interconnects is critical to yields and creating a surge in demand for the Dragonfly platform's comprehensive inspection and metrology capabilities.

In the last 2.5 months, we added over $110 million in new orders, in addition to the $120 million in orders announced last August. These new orders include all three suppliers of high-bandwidth memory, process control for 2.5D packaging, and emerging applications for our unique Echo acoustic metrology. We'll now turn to another secular driver for Onto Innovation, the market demand for power semiconductors, to support the electrification of everything from automobiles to gas-powered garden tools. Revenue from power customers remained near record levels in the third quarter and included inspection, metrology, and software products. In the quarter, we delivered our new Element S systems to five silicon carbide customers to more effectively control the thickness of the epitaxial layer, which is critical for high voltage breakdown resistance of the device.

Our software also gained a new customer in the compound semiconductor market, with a significant order from a leader in wireless communications devices. By demonstrating the power of integrating our Discover Enterprise process analytics with our equipment control solutions, we're able to help the customer achieve better process targets where their previously installed systems had struggled. Based on the results, we expect this customer will place additional orders in the future and roll this out to factories across the globe. In the Advanced nodes, customer spending reflects the broader weakness in demand for data center and mobile devices. As anticipated, we saw large drops in DRAM and logic revenue, resulting in a 30% decline in the third quarter. However, we are making steady progress with our films metrology and delivered several systems to support gate-all-around pilot production in the quarter.

The transition to gate-all-around transistors will be an important inflection for Onto Innovation, as we believe our positions in OCD integrated and films metrology will result in an estimated 30% increase in opportunity over our position in leading-edge FinFET nodes. And now, I'll turn over the call to Mark to provide financial highlights for the quarter.

Mark Slicer (CFO)

Thanks, Mike, and good afternoon, everyone. We closed the third quarter with revenue of $207 million, down 19% over the same period last year, and up 10% versus the second quarter. Despite revenue below the midpoint of guidance, we did exceed the midpoint of our EPS guidance range, achieving $0.96 for the third quarter. The revenue decline from the same period last year is primarily due to the decline in our advanced nodes business, which had revenue of $26 million and represents 13% of revenue. Specialty device and advanced packaging, with record revenue of $135 million, increased 20% over Q2, and represents 65% of revenue. For software and services, we achieved revenue of $46 million, increasing 13% over Q2, and representing 22% of revenue.

We achieved 52% gross margin for the third quarter, exceeding our guidance range of 50%-51%, driven by favorable mix and our cost optimization efforts. Third quarter operating expenses were $57 million, at the low end of our guidance range of $57 million-$59 million. We are realizing the benefits of our cost reduction initiatives put in place earlier in the year, driving our OpEx run rate well below our 2022 levels, while still maintaining investments in technologies to help enable advances in manufacturing of AI and power devices. Our operating income of $50 million was 24% of revenue for the third quarter, compared to 21% for the second quarter. Our net income in the third quarter was $48 million, 23% of revenue versus 20% for the second quarter.

Both our operating income and net income performance versus the second quarter highlight our improving operating leverage. Now moving to the balance sheet. We ended the third quarter with cash and short-term investments of $630 million, an increase of $82 million from the beginning of the year, with operating cash flow of $29 million within the quarter, representing 14% of revenue for Q3. Inventory ended the quarter at $346 million, a decrease of $6 million from Q2, as we actively managed down our inventory levels across the network. We are projecting further reduction in Q4. However, we are now targeting to be between $300 million and $320 million by the end of the year.

This is a shift in our previous projection and is primarily due to the ramp in our Dragonfly G3 orders, which is requiring us to procure long lead time components. We are pleased that our focus is now paying off within the, with a quarter-over-quarter reduction, but we are certainly not satisfied with the current inventory levels, and this will remain a critical working capital focus area until we can get back to consistent cash flow performance levels of over 20%. Accounts receivable increased $22 million to $210 million in the quarter, and our day sales outstanding increased 2 days to 92 days. During the quarter, we did not execute any share repurchases, and we have $32 million remaining under our existing $100 million authorization. Now turning to our outlook for Q4.

We currently expect revenue for the third quarter to be between $200 million and $216 million. We expect gross margins will be between 51%-53%. We are expanding our gross margin range, partially reflecting the work on supply chain and operational efficiencies we have previously outlined as part of our 2023 cost reduction programs. We expect to see continued improvement in each of the next two quarters. For operating expenses, we expect to be between $56 million and $58 million. For the full year 2023, we expect our effective tax rate to be between 13%-14%. We expect our diluted share count for Q4 to be approximately 49.5 million shares. Based upon these assumptions, we anticipate our non-GAAP earnings to be between $0.90 per share and $1.10 per share.

As outlined during our June 1st Analyst Day, the programs we have in place are on track to deliver approximately $25 million of gross margin cost reductions over the next two years, starting in 2024 and into 2025. We have already negotiated greater than 50% of the $25 million in savings, and we'll start to see a portion of these savings realized in our gross margins, starting in Q1, as we target 54% as a baseline goal. And with that, I will turn it back to Mike for additional insights into Q4. Mike?

Michael Plisinski (CEO)

Thank you, Mark. As Mark mentioned, we expect fourth quarter revenue to be essentially flat with the third quarter, but with improvement in both gross and operating margins, despite the unfavorable product mix of lower advanced node metrology systems. In the fourth quarter, we see additional pushouts in the advanced node market, reflecting recent public announcements from leading memory manufacturers, indicating a decrease in their production utilization for the second half of 2023. In addition, the tool move-in dates at new U.S. fabs are pushed out as a result of construction delays. This weakness is being offset by the surge in demand we see for the Dragonfly G3, which we expect to grow another 50% in the fourth quarter, almost exclusively in support of customers ramping high-bandwidth memory into fan-out packaging.

Based on current visibility and customer engagements, we expect the demand will continue to build into next year, resulting in overall growth for Onto Innovation in the first half of 2024. As the era of artificial intelligence progresses, we believe the market will increasingly turn to panel-level packaging, where we expect our JetStep lithography tool play an important role in enabling the next generation of chiplet architectures. Supporting this belief, recently we received an order from a new JetStep lithography customer to support their development of advanced packaging on a glass substrate. Though not without challenges, the glass substrate has inherently better stability than existing substrates, and as a result, can take full advantage of our leading resolution and overlay capabilities. The advantage will be the ability to print smaller and denser interconnects to support the needs of next-generation chiplet architectures.

This new tool will ship in the middle of 2024, and if the customer is successful, we expect many additional orders for glass substrates in 2025. Given the current slowdown in high-performance server markets and our lithography production not yet achieving full capacity, we've worked with customers to realign tool shipments. This means for the year, roughly $30 million of planned lithography shipments in 2023 will move into 2024. Though the impacts to 2023 revenue is disappointing, this allows our team to further optimize the manufacturing process and be prepared for the next market ramp, which we expect in 2025. In conclusion, we believe the AI era that is just beginning will drive many new opportunities for all of our lines of business, including inspection, metrology, lithography, and software.

Of course, everyone knows the impact that NVIDIA had on the market over the last few months in terms of unit volumes and revenue. Already, we see new products being announced by AMD and Intel to respond to this growing demand. Just this week, Samsung introduced their new generative AI model that is designed for AI applications on their devices for edge computing. We believe this expansion of offerings and new applications is an early indication of the broader growth of the industry. Given our established positions with the market leaders, we see this as a long-term driver for Onto Innovation as well. As I mentioned, AI device volumes are expected to drive our revenue growth in the first half of 2024 over the second half of 2023, independent of a recovery in advanced nodes.

If the advanced node spending resumes in the second half of 2024, then that will only further increase the revenue opportunities we see in the coming year. With that, I will turn the call over to Rachel for questions from our covering analysts.

Operator (participant)

Thank you. If you would like to ask a question, please signal by pressing star one on your telephone keypad. If you are using a speakerphone, please make sure your mute function is turned off to allow your signal to reach our equipment. Again, please press star one to ask a question. Our first question comes from the line of Craig Ellis with B. Riley Securities. Please go ahead.

Craig Ellis (Director of Research)

Yeah, thanks for taking the question, and nice to see all the Dragonfly momentum in the business. Mike, I wanted to start just by clarifying a comment that you made about expectations for panel litho shipments this year. You said that $30 million of expected revenue would rip from this year to next. So does that mean that in addition to the $10 million that we saw in 3Q, there's $20 million from 4Q that shifts into next year, or am I misinterpreting what you're saying?

Michael Plisinski (CEO)

From the total year, I think we had some slips also prior, earlier, so it's just we haven't been able to drive enough increased production capacity to cover the currently booked quarter and make up for the slips from prior quarters. So as a result, we're not catching up. We're skipping steps, and we need to stop that. So in total, $30 million is moving from 2023 to 2024, and that's in the numbers that, you know, that we've been guiding to.

Craig Ellis (Director of Research)

Got it. And then really like to hear the 54% gross margin in the first quarter. And I know you don't give a full income statement guide two quarters out, but can you just provide some color on some of the things you're seeing that support that 54%? For example, is advanced nodes now at a trough and just bouncing along the bottom? And I expect there's incremental momentum out of specialty, but would appreciate any color.

Mark Slicer (CFO)

Yeah. Hi, Craig, it's Mark. Yes. So I think certainly for advanced nodes, I mean, that continues, you know, that won't be the ramp in Q1 driving that margin improvement. Certainly with Dragonfly in our inspection business, you know, we're implementing second shift, third shifts. We're driving supply chain efficiencies through that process, so certainly gonna continue to see gross margin improvement in our inspection business with those tools and that ramp up. But we've also been able to, you know, take cost out, as I've alluded to in the, you know, throughout 2023. And those are. That's fixed. I mean, that is not, that's not variable stuff. So that will continue to drive the benefit. So we'll continue to see that leverage.

As I've said, you know, our goal is certainly, you know, 54% is our, you know, baseline goal. You know, driving towards that, you know, goal of exiting, you know, 55% plus, getting us back on model.

Craig Ellis (Director of Research)

Yep. And, and then lastly, if I could, Mike, historically, I always thought that specialty had a decent GaN component, but it sounds like you're really getting good traction with silicon carbide. Any more color on, what's going on with your customers there?

Michael Plisinski (CEO)

You're correct. So historically, we've had a much stronger position in the GaN, but recently we've seen a lot of increased order uptick for our—from silicon carbide customers, and I think that just reflects a lot of what the market is focused on right now. So, it's including several different types of metrology systems, as well as inspection, all driving into those new silicon carbide customers and it's also geographically dispersed. We're seeing Europe, U.S., Japan, Korea, China, all taking systems.

Craig Ellis (Director of Research)

Got it. Thanks, guys.

Operator (participant)

Our next question comes from the line of Brian Chin with Stifel. Please go ahead.

Brian Chin (Senior Equity Research Analyst)

Hi there. I appreciate it. Thanks for letting us ask a few questions. Yeah, Mike, maybe just clarification on remarks you made, and then maybe sort of the follow-up question on that. But I think previously you'd referenced a couple of months ago, $100 million plus in Dragonfly orders into sort of mid-next year. It sounds like you made a reference to maybe an additional follow-on, similar size, maybe a little bit larger slug of orders. Is that right? And can you kind of talk more about that and sort of what the timeframe against those orders in terms of deliveries are into next year?

Michael Plisinski (CEO)

Yep. So we did not not more, but we got another $110 million in orders. We actually got more than $110 million, but the bulk of it, let's say $110 million or so, will be delivered through the first half of next year, so Q2 of 2024. There is some additional orders that extend beyond that, but the vast majority is all, you know, Q4, Q1, Q2.

Brian Chin (Senior Equity Research Analyst)

Got it. Got it. And obviously, that's part of feeding some of your outlook for the first half revenue for next year to be above second half of this year, I think. I guess also in terms of. Do you have the visibility? Do you kind of anticipate that order rates will sort of level off second half from packaging and maybe advanced node starts to pick up the pace at some point next year?

Michael Plisinski (CEO)

I think advanced nodes will, at some point, pick up the pace. That's, you know, that we're hoping for. The leveling off, it's unclear. I'm surprised how rapidly we're seeing the expansions and how broad. So originally, we were seeing a lot of demand for the Dragonfly, for inspection and some of the metrology capabilities in Dragonfly. But as customers are ramping so aggressively, we're finding new challenges that some of our other metrology systems are solving, and we're seeing orders for them. I mentioned the Echo on the call. There's some others as well.So I think as the ramp happens and productivity up, I think we're gonna find that there's more opportunities for process control, maybe even through the second half, that keeps that pace of revenue for us up.

Brian Chin (Senior Equity Research Analyst)

Yeah. Maybe one last quick one. I think you've shipped some Atlas OCD tools for gate-all-around applications in recent quarters, but what's your latest thinking in terms of the timeframe when you'll start to receive volume-based orders and then start to ship against that backlog?

Michael Plisinski (CEO)

Yeah, that's the million-dollar question. You know, I think customers, our customers are getting pretty ready, and it's really the visibility they have into customer- their customers adopting those lines. So of course, you know, we have some construction delays here in the United States, but there's other pilot lines and low-volume production lines around the globe that I think are more ready for volume as soon as customers decide to take that plunge. From a timing standpoint, you know, what we hear is sort of end of 2024, we should see orders preparing for a more aggressive ramp in 2025.

Brian Chin (Senior Equity Research Analyst)

Okay, great. Thank you.

Operator (participant)

We will take our next question from the line of Charles Shi with Needham. Please go ahead.

Charles Shi (Research Analyst)

Hey, good afternoon. Hey, Mike, Mark, I wanna have a follow-up on the question related to the high-bandwidth memory plus 2.5D. If what I hear you correctly, looks like, you're- you've got enough orders as much as $210 million+ to deliver between second half 2023 and the first half 2024. Is that correct? Because you, you kind of mentioned about $100 million+. That's your prior announcement, but you got another $110 million, and that's, all of that is gonna deliver through the first half of 2024. So I want to make sure I heard that correct.

Michael Plisinski (CEO)

Yes, that's correct.

Charles Shi (Research Analyst)

Thanks. So looks like there's a good amount of growth from second half 2023 into first half 2024, because I think that what you guided for, I mean, this quarter's Q-on-Q growth of that part of the AI packaging-related revenue and the next quarter's growth kind of suggests it's something about $70 million-$80 million, but that means next year is gonna get to something like the first half next year, $130 million-$140 million. So that looks like a very good incremental revenue out there, but I'm just kind of curious, what about the other part of your business? Advanced node, it doesn't sound like you're expecting a recovery, but the third piece, I think, you don't really break it down, but the specialty devices.

It has been strong second half, but what about first half next year? Is it flat or up or down from the second half 2023 level? Thanks.

Michael Plisinski (CEO)

Yeah. So I think two things. So going back to the HBM and the packaging, a couple of really significant events happened in the last few months that helped drive that business. One is, you know, we had talked about having some evaluations out at the third HBM memory manufacturer. We had two, not the third. Very quickly, the demo and eval tools demonstrated our value, and we quickly saw some aggressive ramps. In addition, we saw new metrology opportunities. So that's contributing to the stronger growth we see in the first half of next year.

Going back to power semi, which is one of the big areas of growth in, in, the specialty area, we do see a bit, and it's hard to say right now because we're not getting the same kind of lead times and not having the same kind of pressure to ramp as the, as the AI guys right now. But we do see a little bit of a, of a slowing, slower pace in the first half, but not significantly, and I'm guessing that that will start to pick up as the, as the rest of this year progresses.

Charles Shi (Research Analyst)

Thanks. Lastly, can you kind of give us a breakdown, I mean, that incremental 110 follow-on orders, how much of that is HBM? How much of that is the 2.5D?

Michael Plisinski (CEO)

I knew you'd ask that. Right now, it's more heavily towards HBM, but let's see now. Yeah, it's actually still pretty well balanced, as I'm looking at the data. Yeah, it's still pretty well balanced between the two groups.

Charles Shi (Research Analyst)

Yeah. Okay. Thanks much.

Operator (participant)

Our next question comes from the line of Vedvati Shrotre with Jefferies. Please go ahead.

Vedvati Shrotre (Senior Equity Research Associate)

Hi, thanks for taking my question. So I wanted to double-click on the litho panel opportunity. So I know we started the year with about $80 million that you were expecting, and then in the second quarter, there were some pushouts, so it came down to $60 million. And so now, could you give me a sense of how much, you know, litho panel turns out to be in 2023? And, you know, you said $30 million gets pushed out. So is it if you could help me understand what happens in the second half of 2023 or fourth quarter.

Michael Plisinski (CEO)

Yeah. So, so you're right. We did have the, the plan and the expectation to be able to deliver $80 million this year in the bookings. Because of the $30 million moving out, that means we'll deliver $50 million this year and, and not the full $80 million. Those, those other tools are going to move into deliveries for next year.

Vedvati Shrotre (Senior Equity Research Associate)

Oh, and that wouldn't impact your gross margins, right? Because I understand those tools carry lower gross margins, so they'll be offsetting the cost-saving initiatives would offset that. Is that fair?

Michael Plisinski (CEO)

Well, we're still shipping litho tools now. So built into the gross margin profiles where we're delivering now, the last couple quarters, last several quarters, is, you know, 2-3-4 litho tools a quarter. And so that's going to continue. But at the same time, we've talked a lot about how aggressively we're driving the litho margins north, and I think each of the quarters next year, we're going to see improving gross margins from litho to the point where it's not going to be the big issue that it's been for sure all of this year, if that makes sense.

Vedvati Shrotre (Senior Equity Research Associate)

Yeah, got it. And then the other question I wanted to ask is, so a lot of your peers are benefiting from China being a stronger, you know, territory. Is that, is that playing out for you in any sense? Like, if you could elaborate on that.

Michael Plisinski (CEO)

Now, China, China is definitely, you know, definitely not as strong for us as it is for our peers. I've seen, you know, 40% and 50% of our peers' revenues coming from China. For us, it's, it's more like 15%.

Mark Slicer (CFO)

Yeah. So, you know, in Q3, we're about 15%, and, you know, year to date, we're at 18%-19%. Yeah.

Michael Plisinski (CEO)

So it's a lot of specialty devices, you know, a lot, a lot of the new markets where we have some, you know, generally unique metrology that then brings in some of our other products. But yeah, it's definitely not the 50% we see from some of our others.

Vedvati Shrotre (Senior Equity Research Associate)

Got it. Thank you. I have one more, but I get back in the queue.

Operator (participant)

We will take our next question from the line of David Dooley with Steelhead. Please go ahead.

David Dooley (Senior Research Analyst)

Yeah, thanks for letting me ask a question. If we could just kind of dig in on this lithography issue. You know, you've had systems push out for two quarters in a row, I guess, if my recollection is correct. And is this more of... you know, just kind of go into, you mentioned it's your internal production issue, is it, or is the tool's performance, or is the customer's not ready for it? Could you just elaborate in greater detail about why we're seeing these pushes?

Michael Plisinski (CEO)

Yeah, that's a good, it's a good question. So it's been a mix. As you know, in Q2, the issue was tied more towards the customers making some changes that we had to adapt to and weren't able to complete all of the work required. But as we moved those tools into the next quarter, we were unable, which would be this quarter, we were unable to deliver what we had already committed for the quarter, plus pick up some of this extra work. You know, these tools are large. They take up bays in the factory. Delays actually have a pretty big impact.

The other, I think the other thing to understand is, in these systems, we have about 3,200 out of 17,000 parts, you know, major parts, not screws and nuts and bolts, but 17,000 major parts to make a litho tool. Out of that, around 3,200 are custom-engineered parts by, by the team here. And to give you an idea, in our most advanced metrology system, there's only about 100 custom-engineered parts. So the level of complexity of these systems and the manufacturing flows and the calibration times, the integration times, it's just taking more, more effort to drive the discipline and the processes to make these systems more predictable, given their complexity. That said, because we do do a lot of the custom engineering ourselves, we've been able to drive improvements in the system fairly significantly.

So in the first four systems, since the first four systems we delivered, we've improved cycle times by 40%. We've, you know, doubled the capability of our overlay, and I think we've improved throughput something like 30% or 20%. So there's definitely trade-offs. You know, there's a benefit of having the highly engineered system, but the cost is the complexity in manufacturing.

David Dooley (Senior Research Analyst)

And how, you know, so essentially, you know, you can't basically take the systems that slipped last quarter into this quarter and build the, you know, basically have to build twice as many. How do you fix this problem? When will that problem be fixed? Obviously, you need more internal capacity. So is that why-

Michael Plisinski (CEO)

Yeah.

David Dooley (Senior Research Analyst)

It doesn't get better till the middle of the year or whenever? Go ahead.

Michael Plisinski (CEO)

Yeah, exactly. It's, we need to finish some of these processes. We need to get our supply chains to be more responsive. We've had a lot of issues with incoming quality that, that also require then rework and take too much time and, and too much base space, so we can't move these systems. So as we work through all this, and again, we're making steady progress, it's just not fast enough. It's no fun for me to keep guiding and then updating the guidance or missing the guidance. So we're, we're resetting, giving the time team to get more predictable, and I expect, you know, middle of next year, so by the second quarter, we'll be able to reach our full capacity, which is, you know, significantly more than $80 million.

David Dooley (Senior Research Analyst)

So let's just boil that down to, so you're gonna go from three tools a quarter to be able to produce six tools a quarter, because that seems like what your problem is now.

Michael Plisinski (CEO)

Yeah, that's, that's fair. Yep.

David Dooley (Senior Research Analyst)

Okay. All right, one final one for me, and thank you very much for that clarification. That was appreciated. You mentioned, you know, the TAM for your films tool would grow by 30% as we move to Gate-All-Around, and I'm seeing backside powers in that calculation, too. Could you just help us understand what, what, what the TAM is, and, you know, also help us understand what you're kind of, what that means or what, how much revenue that would be for Onto?

Michael Plisinski (CEO)

So the SAM, I don't have actually that well broken down. I'm trying to think what our publicly stated SAM is for the FinFETs at 10,000 wafer starts, and it would be obviously 30% above that. But the comment was really around our growing position within Gate-all-around, and then how that will increase our opportunity given the same amount of wallet shares, given the same amount of expansion. So if they both expanded, a FinFET node, a Gate-all-around node, expanded by 10,000 wafer starts, we'd see 30% more revenue, estimated 30% more revenue, in that Gate-all-around expansion than the positions we have in FinFET.

This is driven by more layers going to us on the OCD, insertion opportunities in integrated, and then as well as the films layers that we've been able to start to win and qualify for tool of record positions. But I don't have the exact dollar number for you.

David Dooley (Senior Research Analyst)

Okay. We'll get that base number another time. Thanks for answering my questions. Thanks.

Michael Plisinski (CEO)

You're welcome.

Operator (participant)

We will take our next question from the line of Mark Miller with Benchmark. Please go ahead.

Mark Miller (Equity Research Analyst)

Thank you for the question. I just want to clarify something. The litho tools that were delayed last quarter were due to customer-specified mods, but the reason these tools were further pushed out is a component availability, fab availability? Why the further push out in those two tools?

Michael Plisinski (CEO)

Yeah, it's a good question. It's different tools. So those tools from Q2 were delivered. They shipped shortly after the quarter or within the early part of this quarter. The additional slip outs were sort of the knock-on effect. So we had a little bit of delay in the other ones. We couldn't start the additional tools, the tools that were already planned for Q3. And with some other manufacturing production issues, so these were mostly internal issues, we ended up not delivering on time. So the first Q2 was tied to, I'd say, you know, customer change requests. Q3 was tied to our own execution.

Mark Miller (Equity Research Analyst)

Okay, thank you. Just wondering, too, what are you seeing in China? And is the power semi slow, the little slowing in the power segment, in China or somewhere else?

Michael Plisinski (CEO)

Oh, I don't think so. I don't think we see a slowdown in China, per se, overall, just not. I think we're doing a nice job of rebuilding and recovering from some of the customers, the good customers we had that were put on the entity list. So I think that's a growing part of the business. I think more of the... And again, it's still early because, you know, our bookings in that part of the market are not generally out super far. But I think that's more in the more established markets, so some of that pause or delay or lower visibility right now is more in the established Europe and U.S. markets.

Mark Miller (Equity Research Analyst)

Your largest area in terms of geographic sales in the September quarter was?

Michael Plisinski (CEO)

In the September quarter was?

Mike Sheaffer (Senior Director of Investor Relations)

Korea.

Michael Plisinski (CEO)

Yep, Korea.

Mike Sheaffer (Senior Director of Investor Relations)

Korea.

Mark Slicer (CFO)

Korea. Thank you.

Michael Plisinski (CEO)

Almost 19, 19%.

Operator (participant)

Once again, if you would like to ask a question, please signal by pressing star one on your telephone keypad. It appears there are no further questions at this time. Mr. Sheaffer, I'd like to turn the conference back to you for any additional or closing remarks.

Mike Sheaffer (Senior Director of Investor Relations)

Thank you. Just a quick reminder for everybody about some upcoming events. First, Onto Management will be participating in the Morgan Stanley TMT Conference in Barcelona next week, and we will be participating in the Wolfe Research Small and Mid-Cap Conference in New York on December sixth. Thanks again for joining us today. A replay of the call is going to be available on our website at approximately 7:30 P.M. Eastern Time this evening. We'd like to thank you for your continued interest in Onto Innovation. Rachel, please conclude the call.

Operator (participant)

This concludes today's call. Thank you for your participation, and you may now disconnect.