Good afternoon, ladies and gentlemen, and welcome to the Permafix Third Quarter twenty twenty one Conference Call. At this time, all participants have been placed on a listen only mode, and we will open the floor for your questions and comments after the presentation. Is now my pleasure to turn the floor over to your host, David Waldman, Investor Relations. Sir, the floor is yours.

Speaker 1

Thank you. Good afternoon, everyone, and welcome to Perma Fix Environmental Services Third Quarter twenty twenty one Conference Call. On the call with us this afternoon are Mark Duff, President and CEO Doctor. Lou Senefani, Executive Vice President of Strategic Initiatives and Ben Naccaratto, Chief Financial Officer. The company issued a press release this morning containing third quarter twenty twenty one financial results which is also posted on the company's website.

If you have any questions after the call or would like any additional information about the company, please contact Crescendo Communications at (212) 671-1020. I'd also like to remind everyone that certain statements contained within this conference call may be deemed forward looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 and include certain non GAAP financial measures. All statements on this conference call other than a statement of historical fact are forward looking statements that are subject to known and unknown risks, uncertainties and other factors which could cause actual results and performance of the company to differ materially from such statements. These risks and uncertainties are detailed in the company's filings with the U. S.

Securities and Exchange Commission as well as this morning's press release. The company makes no commitment to disclose any revisions to forward looking statements or any facts, events or circumstances after the date hereof that bear upon forward looking statements. In addition, today's discussion will include references to non GAAP measures. PharmFix believes that such information provides an additional measurement and consistent historical comparison of its performance. A reconciliation of the non GAAP measures to the most directly comparable GAAP measures is available in today's news release on our website.

I'd now like to turn the call over to Mark Duff. Please go ahead,

Speaker 2

All right. Thanks, David, and good afternoon. Despite the prolonged impact of the COVID-nineteen pandemic, I believe we're finally beginning to realize the momentum and stability that we saw in 2019 before the pandemic. As discussed previously, the federal government has been much slower than the commercial sector to resume normal operations, and this was not unique to us, but also has been experienced across our industry by most of our peers as well. Nevertheless, we've started to see an improvement in the business.

During the past quarter, we saw a slight increase in our Treatment Segment revenues, which has continued to build heading into the fourth quarter. We've seen increasing waste treatment activity both in the commercial and the government clients. Importantly, we are realizing receipts from Hanford and utilities that resemble levels prior to COVID and bidding activity is also getting to levels also seen in 2019. It's clear to us there's a significant pent up demand on waste treatment and we hope to capitalize on heading into the New Year with that pent up demand. We felt the impact more heavily on our Services segment this quarter, which has realized an extended hiatus in new contract awards.

However, the government has begun to issue these awards and we're starting to see increases in Services revenue backlog to support the next eighteen months. Specifically, we won a number of service contracts adding to approximately $50,000,000 in project backlog since the start of the third quarter alone. And these projects will begin to realize revenues starting in Q4 when fuel operations begin to mobilize and we should see that growth really begin to pick up in Q1 once mobilizations are complete through this quarter. We're encouraged by the subcontracting goals that the Department of Energy has mandated for some of the larger procurements throughout the complex, including small business subcontracting requirements, which plays into our strengths. These goals include meaningful work with metrics that include over 20% of total revenue to be subcontracted, and these are great opportunities for us and will align with our core competencies.

In addition to our growing pipeline, we've also secured numerous what we call IDIQ contracts or multi award task order contracts, which is also termed as MATOX. Generally, there are a limited number of companies that are selected for these contracts, and each one provides an opportunity to bid on task orders over the next five years. Don't typically announce these awards due to the fact that there is uncertain funding levels associated with them and there's no way to predict backlog. However, the limited competition and the scope of works provide us a good sense of potential opportunity once the clients get back into the field, we'll begin to understand them better then. These are beginning to mount up now with nearly a dozen IDIQ awards that we've received in the past year.

And some of these are fairly large, positioning Permafix for future opportunities beginning in 2022. For example, we recently were awarded four separate MATOCs, multi award task order contracts with the U. S. Army Corps of Engineers. Each one of those MATOCs has a ceiling of $95,000,000 and will support facility reduction programs at military bases in four separate regions of North America.

So just an example of the types of MATOCs that we've been able to win over the past year, year and a half. At the same time, we continue to define and position ourselves for new procurements and market expansion opportunities within the U. S. Navy, with DoD and DOE. These opportunities include work scopes directly within our core competencies and will support the opportunity to provide new solutions and the potential for long term sustainable revenue within both treatment and services segments.

We continue to maintain a solid balance sheet with cash on hand of more than $7,200,000 as of 09/30/2021. On October 4, we announced a registered direct offering for gross proceeds of 6,200,000.0 As of 09/30/2021, we received approximately $5,500,000 of the gross proceeds from the offering and the remaining $700,000 coming in after the close of the quarter. We had approximately $10,800,000 of borrowing capacity on our revolving credit facility with PNC as of 09/30/2021. As I mentioned, we believe we've weathered the worst of the storm due to the COVID-nineteen pandemic and we're now coming out the other side. That said, I'd like to address why we decided to raise capital when we did.

We didn't enter into this offering lightly and both management and the Board are very sensitive to dilution. We kept the offering small with a closed group of funds we believe are fundamental long term investors, many of whom are current investors, and we believe the terms of the transaction were quite favorable for the company. We have no desire and no need to raise additional capital for the foreseeable future. In terms of use of proceeds, we see a number of very significant opportunities ahead, especially within the treatment segment that would require some upgrades to our current facilities. This recent funding will allow us to accelerate these facility upgrades in support of potential new revenue streams from Hanford and other government sites that could be meaningful to our treatment segment program.

The funding will also support deployment of new technologies and add the capacity of current technologies to support revenue increases as well. In particular, we're very excited about potential opportunities related to the Testbed Initiative, what we call TBI, also known as the Low Level Waste Off-site Disposal Program or project. DOE has prepared and submitted their draft waste incidental to reprocessing evaluation, what they call the WEAR, for the TBI demonstration, which provides the regulatory coverage to ship the waste off-site off the Hanford Reservation for processing. The evaluation demonstrates that the pretreated and solidified waste will be incidental to reprocessing of spent nuclear fuel and therefore can be managed as low level waste by DOE. The DOE has invited comments on the draft of report during the ninety day comment period that's ongoing right now, and that will wrap up again in ninety days from November 5.

The second phase of the demonstration will include extraction, shipment and transportation of 2,000 gallons of tank waste to our Perma Fix Northwest facility in Richland, Washington, right next to the Hanford site. DOE officials have stated shipment of this waste to our facilities should occur by next summer if all continues in the current path in regards to the regulatory process. PermaVix is confident that this demonstration will underscore the effectiveness of grouting as a supplement to DOE's current vitrification strategy, while at the same time demonstrating the opportunity for substantial cost savings, increase an immediate capacity to treat large volumes of waste, and dramatically reduce the carbon emissions footprint over the current approach. And this is important for DOE's core mission. So to wrap up, COVID has begun to loosen its grip on nuclear services projects.

As the federal government begins to mobilize back to the offices in both the DOE and the DoD, we expect to see increased spending on waste disposition through pent up demand. While we would likely have seen better numbers in Q3, we do believe we are positioned for growth with a solid balance sheet. We continue to invest in our capabilities and our facilities and have built a highly scalable infrastructure to support that growth. As a result, we're very encouraged by the outlook of 2022. On that, I'll turn it over to Ben Nachrado, who will discuss the financial results in more detail.

Ben?

Speaker 3

Thank you, Mark. Our total revenue from continuing operations for the third quarter was $15,800,000 compared to last year's third quarter of $30,200,000 This is a decrease of $14,400,000 or 47.6%. The decrease in revenue was due to the drop in revenue in our Services segment, which totaled 16,200,000 while our Treatment segment revenue actually increased over prior year by 1,800,000.0 Though volume continued to lag behind prior year, the Treatment Segment increase was the result of higher average pricing for the waste process and from a Request for Equitable Adjustment or an REA, which increased revenue. Our drop in revenue in the Service segment was a result of the completion of most of our larger projects. And while new contracts have been awarded in the third quarter, they did not start up in time to generate enough revenue to replace those completed projects.

On a year to date basis, as of September 30, our revenue was down $22,000,000 or 28.5%. This drop again comes from revenues in the Service segment due to the completion of these larger projects without the revenue from the new projects to replace them. Treatment Segment revenue was effectively flat with a drop of less than 2% compared to last year, and we did see improved pricing, which offset the drop in lower the drop from lower volume. Our gross profit for the quarter was $2,200,000 compared to $4,800,000 in the 2020. The drop in gross profit was entirely from service segment, where the reduced project revenue impacted gross profit from both a volume standpoint and margin standpoint.

In the Treatment Segment, gross profit was up CAD 1,400,000.0 due to higher revenue, which offset the impact of a little bit lower margins on the waste we treated. Our fixed costs in both segments were effectively in line with prior year. For the nine months ended September 30, gross profit was $5,500,000 compared to $12,700,000 in the prior year. This gross profit again was impacted by lower revenue and reduced margins in the Service segment as well as to a lesser extent in the Treatment segment. Our G and A costs for the quarter were $3,300,000 which was in line with $3,300,000 in the third quarter last year as lower marketing and business B and P expenses were offset by higher wages and public company costs.

For the nine months ended September 30, our G and A expenses were $9,600,000 compared to $8,900,000 in the prior year. Marketing and BNP expenses related to new business opportunities were up compared to last year as were salaries and public company costs. Our net income attributable to common shareholders for the quarter was $1,400,000 compared to last year's net income, which was also $1400000.0.20 21 income was driven primarily by the reversal of the company's valuation allowance related to the net operating loss deferred asset, which improved the bottom line by 2,400,000.0 I'll take a minute to further explain the tax adjustment in more detail. The company carries a net deferred tax asset made up primarily of net operating losses, which totaled $8,600,000 as of December 31. Due to uncertainty of realizing the value of this asset, we've always fully reserved it.

We call this full valuation allowance. In 2021, we determined that it was more likely than not that a certain amount of this deferred tax asset will be realized. As such, we reduced the valuation allowance by CAD2.4 million, which contributed to a total tax benefit of CAD2.8 million. Basic income per share was CAD0.11 compared to CAD0.12 last year. Our year to date basic income per share was $0.27 compared to $0.24 in 2020.

Our adjusted EBITDA from continuing operations for the quarter as we defined in this morning's press release was a loss of $798,000 compared to income of $2,000,000 last year, reflective of the significant revenue drop in the Service segment and the continued delays in contract awards impacted by COVID. Turning to the balance sheet. When comparing with year end, cash on the balance sheet was CAD7.2 million, down a little bit from $7,900,000 at the 2020. Our cumulative accounts receivable and unbilled receivables were down $6,600,000 reflecting the reduction in revenue when compared with twenty twenty's Q4 in the Service segment. Our current liabilities were down $10,700,000 as a result of timing of our payments, the reduction of activity in the Service segment and the PPP loan forgiveness in the second quarter.

Our backlog at the September 2021 was $7,100,000 down slightly from $7,600,000 at year end and down from $7,500,000 in September 2020. Total bank debt at the end of the quarter was $1,200,000 which is owed to our credit facility P and C Bank. Finally, I'll summarize cash flow activity for the year. Our cash used by continuing operations was $4,000,000 Cash used by discontinued operation was $296,000 Cash used for investing in continuing ops was 1,100,000 and this is primarily capital spending. And cash provided by financing was $4,800,000 which represented by $5,400,000 received as part of our share offering.

Our monthly payments to the term loan of $330,000 and payments to finance lease and other debt of $321,000 With that, operator, I'll now turn the question over to you.

Speaker 0

Certainly. Ladies and gentlemen, the floor is now open for questions. Once again, if you have any questions or comments, please press 1 on your phone. Your first question is coming from Howard Bros from Wellington Shields. Your line is live.

Speaker 4

Thank you. Mark, Lou, Ben, David, first of all, I hope that everyone is well and we're continuing to avoid COVID and anything else that comes along.

Speaker 2

Thanks Howard.

Speaker 5

You're very

Speaker 4

welcome. For full disclosure, Wellington Shields was the sole manager of the 1,000,000 share common stock equity offering at $6.2 and I was the investment banker responsible for the deal. In addition, for full disclosure, members of my immediate family own shares in Perma Fix. So let me start with a couple of questions. You remediated one nuclear powered ship.

How many more ships are in the process of deconditioning and what kind of market are we talking about say over the next three to five years?

Speaker 2

Yeah, Howard. We have been able to secure one of the first ships that the Navy has actually outsourced. They decommissioned their own ships. I should say the Navy actually did it internally up until a few years ago. And then the Navy realized in a formal way that they'd be better off using their talents in building ships and avoid using those same resources for doing decommissioning because the skill set is so much different and it's such a limited skill set overall.

So they started outsourcing that. And they've done two or three shifts now in the last several years. The Sturgis was the first one and there's another one being done in Alabama and then the one that we were able to win called the X McKee that we're doing it in Norfolk Naval Shipyard right now. That's the big win we had a couple months ago. That's off and running very well.

To answer your question, if you go to a GAO report, don't have it right in front of me, but GAO reports that there's about 48 ships destined to be decommissioned over the next five years. They're various sizes. They're not all nuclear. I want to say probably 25, I want to say 12 of them were nuclear. So they're on a rapid pace to do those.

Some will be done up at Puget Sound, specifically the subs, and the ships will be done at various other places. So it kind of gives you a sense. There's also two very large ships that are about two to three years out from funding, which means they'll start planning here on them pretty soon. That's the Nimitz and the Enterprise aircraft carriers. Those are obviously billion dollar plus projects.

And we're excited about the fact that being one or two companies that have done this type of work so far, that we have our foot in the door very well, we'll perform well on this shift that we've got and be in a position to bid and win on some of those 48 that I mentioned as well as perhaps a team on the aircraft carriers that are coming up as well. So a very big opportunity overall for this type of market. Our skill set, which is waste management and radiological protection as it relates to demolition lines up very, very well with this. With the right teaming partners that have experience with ships, we feel like we have a really good future on market.

Speaker 4

Could you give us a sense of what a ship for your purposes would be in terms of potential revenue?

Speaker 2

It ranges pretty widely, Howard. As I said, our ship that we've got is a tender. It did not have a reactor on it. It took care of about a dozen nuclear subs over about a forty year period, I believe. The ship is about a third of its contaminated.

In other words, about 150 rooms are contaminated. They have to be deconned. That's about a $40,000,000 job. Some of the other ships that had reactors on them will have more contamination. Most of those reactors will have been removed by the Navy and will just be scrapping and cleaning up the rest of it so they can be released.

So anywhere to answer your question, I think we're probably one of the smallest ones that have come out. The first one was about $40,000,000 as well. Ours is 40,000,000 and there's another one that's around $100,000,000 But to answer your question, probably somewhere between 40 and 150 is going to be the general range that these things will come in at.

Speaker 4

You're basically talking over five years an opportunity of more than $2,000,000,000 to cut to the chase.

Speaker 2

Roughly, yeah. Yeah. It's hard to say how contaminated some of them are, Howard, but that's probably not really far off. And the GAO report has some numbers like that as well. It's pretty well documented what the Navy is going to spend on this initiative in refurbishing their fleet.

And frankly, to refurbish it, there's always so much space for these ships to be stored. The ones that are out of commission or being decommissioned, they don't have any place to put them. They got to get rid of them to make room for the new ones.

Speaker 4

Alright. Thank you. Let me continue. There was a contract let out. Let me back up.

The EPA had a settlement with the Navajo Nation. We've talked about this on prior calls. That settlement, I believe, is certainly in excess of a billion dollars. There was a contract that was let out several months ago for $220,000,000. Are you involved in that contract?

And can you comment?

Speaker 2

We are, Howard. We were successful in securing one of those contracts. That's one of the MATOCs I referred to in the script. They made three awards. We were one of those awardees in a formal team with a company called Arrowhead.

It's a Native American firm out of the Navajo region along with Jacobs, which is obviously a large engineering company. The bottom line is not much has happened through that Maytok and we were patiently waiting. The situation is I did do a little research on this just in the last week and was kind of surprised, but the EPA has been running money through the A and E contractor, which is Tetra Tech. A and E contractors basically got the scope of work to characterize and, so to speak, tee up properties or mines, I should say, to run through the cleanup initiative. So they'll characterize them, develop the scope, do a government estimate, and put together the task order for EPA to bid out.

And they've been spending about $7,000,000 a year over the last three and a half years on those initiatives. So it appears that there's a good backlog of properties in mind. My understanding is probably around the 20 to 25 properties. And that will likely start to see task orders in 2022.

Speaker 4

One additional thing that I want to get to the TBI. The ThermoFix, what's the market opportunity there? You talked about it in the last conference call and implied sometime in 2022 to begin working on it.

Speaker 2

The vacuum thermal Thermal Thermal desorption. Yeah. That's the VTD unit we're putting in Florida. Yeah. Did fail to mention that.

I've talked about it probably the last three of calls. That's going pretty well. That is one of the only real initiatives that we're seeing at this point in time impacted by the supply chain issues. So we have several parts associated with that BTD that have been delayed. We had scheduled to have it up and running before Christmas.

It looks like it's going to be more like early to mid March and we'll have it up and running to start in January but running hot in March. So it's going to get probably an eight to ten week delay, but we should start to generate initially some revenue in Q1 if all goes well. Do have high confidence that the parts will be provided, but like I said, just a little bit late.

Speaker 4

All right. Last but not least, TBI. You referred to the direct feed low activity waste and the, WEAR. That's you're talking about the 2,000 gallons. In a letter dated August 27 from the Department of Ecology, State of Washington to the DOE, they talked about two tests.

One certainly for 2,000 gallons and then analyzed it. And the second test, which is and they mentioned Permafix in both instances for 500,000 gallons of tank waste, which would be included. And this is, of course, once I believe that there will be some public comment periods on both of these things, but you're mentioning both of these. Is that correct?

Speaker 2

That is correct, Howard. And this is a complicated process that we're going through that has lots of room for movement. So where we are right now is there's a number of things that have to happen to get to 2,000 gallons. And then some decisions that have to be made after 2,000 before you get to the 300,000. So right now, just as a checklist, to get to $2,000 they need to have the TISCER work.

And the TISCER is the tank side seizing removal system that's going to pull the waste out. So construction is supposed to be completed in January and it's going to be capable of doing about five gallons a minute. So it should run very well and be very sufficient in providing that waste and there's high confidence that it will be running. The second thing is the weir you mentioned, the waste incidental reprocessing. Mentioned it in my script as well.

It's out for public comment right now for ninety days. And what they've demonstrated in that report was that once the cesium iodine is removed, in other words it's filtered treated, then DOE should be able to handle that waste as low level waste and support the 2,000 gallon initiative. The third thing is the environmental assessment that goes through what they call the NEPA process. That's also, I believe, public comment. Not sure if it's open or closed at this point, but it should be a few months ahead of the weir.

And that basically looks at the alternatives to make sure that when DOE makes a decision or the government makes a decision that the alternatives are considered. They look at seven or eight alternatives and they're looking at making sure the alternative for off-site treatment, which is what we're proposing, is viable and doesn't impact the environment. So that's also going to be done. And then the last thing is the RD and D permit. Once the EA is done and once the weir is done, they apply for an RD and D permit and they're scheduled to do that after the weir closes, which is in the spring.

They should have it by summer and then ship in the summer. So to answer your question specifically, the difference between the 2,000 gallons and the 300,000 gallons, it's going to depend on public comment. It's going to depend on what the results of the 2,000 gallon demonstration is, which in my mind should be quite simple. It's going to go very well. And then DOE can make a decision on whether they think the WEAR and the EA are sufficient or anything should be modified and amended or something like that to jump from $2,000 to $300,000 So it's largely subjective.

From And what I understand, Howard, I talked to some regulatory experts about this and they said that too, that if DOE wants to accelerate and send 300,000 gallons, they can with some minor modifications to some permits or the WEAR and the EA and keep this ball rolling. But that's all predicated on support of the regulator as well. So in other words, to answer your question specifically, do we and the regulator have the ability to keep that system rolling or they may decide to do some other evaluations between the two tests? We're hoping that nothing's going to really change between the WEAR and the EA. I mean, there's not going to be any new information to really consider overall.

So the worst case scenario will be some type of modification of those permits or permits processed and have a limited period of time and perhaps be able to start treating at full capacity in the 2023 timeframe.

Speaker 4

It's 500,000 gallons in the documents, not 300,000, by the way.

Speaker 2

Yeah. The 300,000 they've mentioned in the documents, Greg. That's phase three. I may have said 500,000. I think once they get rolling at the operational level, it's going be more of a monthly burn.

So right now, our capacity and our permits without any modifications will take 30,000 gallons a month. With minor modifications, we can jump that up to $1,000,000 So it just depends on how much they want to ship to us.

Speaker 4

So is there a good probability that you get the 304,000, 500,000 gallons after the 2,000 in your opinion?

Speaker 2

You know, there's a lot of politics involved here, Howard, as we talked about on So every I hate to speculate on that. I'm optimistic that DOE will see the value in this as a supplement to DF Law. As I've said before, Perma Fix will get some of the effluent waste from DF Law as well. So a perfect world, if DF Law comes up and gets rolling in December '3 and DOE sees the value in the supplement work that we can do at the same time, So that in 2023, they're both running and they're emptying tanks at a rapid pace. So I remain optimistic that there will be limited number of hurdles between Phase II and Phase III.

Speaker 4

That's all I have. Thank you. Good luck.

Speaker 2

Thanks Howard.

Speaker 0

Thank you. Your next question is coming from Anthony Harpel. Your line is live.

Speaker 6

Hi gentlemen. Hope you all are well. Mark, hope you're well.

Speaker 2

Hey, Anthony.

Speaker 6

Can you please explain what difference it makes to Perma Fix to be named a prime contractor on the Hanford tank disposition contract versus a subcontractor? And can you please clarify whether Perma Fix can be named as a subcontractor on that contract even if Perma Fix ends up being part of the losing consortium that is bid for that contract?

Speaker 2

Sure, Anthony. First of all, can't talk anything about the procurement and where we stand on it because it's an open procurement and it's obviously very significant. Lots of NDAs have been signed. So I'm not going to talk specifically about our role in it. But in the general sense, named with the prime or on the procurement or the proposal itself locks a company in for a specific scope.

So you know that when you win, you're going to get the scope. The government requires you to define each company's role and the commitment from the prime to use that company for that role and evaluate you on that basis and you build your team around that strategy. So being named on any DOE bid guarantees you certain scope or at least gives you a significant probability for certain scope when it's awarded. So it's a lock in for sustainable long term revenue and in most cases, Anthony, it includes commitment for a significant number of FTEs or employees that you would have in your company. So that's the value.

This is a different type of deal with us in the tank closure contract, ITDC is referred to, because the scope of work doesn't specifically say doesn't ask you, doesn't define the scope in this bid for supplemental treatment of the tank waste. Because this literally is an IDIQ, that task order will come after the award. So the only thing you're really bidding on and having to define how you're going to do it is transition. So you define, hey, this is how we're going transition, and during that period, DOE is going to hand you a handful of task orders and say, okay, here's all the things you've to do. You've to maintain compliance at the tank farm.

You've got to serve the law. You've got to run these facilities to deal with these wastes. And at 1.1 could speculate that there will be a task order that includes supplemental treatment of tank waste. And again, I'm just painting a picture here so none of this is written anywhere. We would be in a position if we were on the losing team or the winning team, we would be in a position to support that task order as a subcontractor or on the team.

And so again, there's not a lot of options for treatment of that waste outside of DFLaw, so one could speculate, hey, if we're on the losing team, the winner would call us and say, give us a quote for treating this waste off-site or supplement as a supplement to DF Law and we would provide that service. The reason we're so confident because we're the only ones that have a facility right next to Hanford that could take the waste without transporting the raw waste down the highway. We're permitted and we've demonstrated we can do it and we've demonstrated performance. So with all that in mind, if we're not on the winning team and if we're just a subcontractor, then we still are very confident that we would provide that supplemental treatment.

Speaker 6

So I mean it just sounds like it really doesn't at the end of the day given the niche that you serve and given the fact that there really is no one else to go to to do what you do. It sounds like it really doesn't matter whether you're a prime contractor or a subprime on the Hanford Tank closure. I mean, is that the bottom line?

Speaker 2

That's the bottom. The bottom line is exactly that, Anthony. There are two different initiatives with two different revenue streams. The first, if we're on the winning bid, that's a nuclear services job, there's their bodies off-site and they're working on the plant, just like anybody else. The second opportunity is treating the waste off-site at our facility, and that's a separate initiative independent of each other.

Speaker 6

Those are independent of one another. So you could be named that you could be part of the winning consortium and do both services and treatment. And you could be a subprime subpriming to the other party that wins this contract and do both treatment and services revenues?

Speaker 2

Correct. Those are both correct statements.

Speaker 6

Okay. Got it. And you had mentioned being a small business. And I know you I think you had mentioned that 20% of revenues of a of a contract award could be or over 20% could be subcontracted. Maybe you could just elaborate on that.

And first, could you help explain under what circumstances are prime contractors of the DOE and DOD subject to small business subcontracting requirements? And are those subcontracting requirements always the same across all projects awarded by a given agency? Or do they vary? And if you could just help give us a sense of to what degree they vary.

Speaker 2

Sure. DOE is really the largest civilian contracting agency. They are very sensitive and understand the value that small businesses bring to our industry and to make sure that they're growing and there's opportunities for them. Some of these contracts are so gigantic and are so difficult to manage, the department looks at it and says, Look, we can't really manage ourselves as a department hundreds of small business contracts. So what we're going to do is we're going to go to the big boys, these multibillion dollar contracts, and give them goals, and they have to do it, which works out just fine.

On the tank closure contract, the goal is about 20% of revenue, which is about $180,000,000 every year. And what DOE will do is they'll make that prime contractor demonstrate each year they've subbed out $180,000,000 to small businesses in work. And they'll tie a fee to it and tell the prime, Hey, you guys, you met your goal, you didn't meet it, and if you don't meet it, then we're going dock you some fee make sure you know there's an incentive. You've got to meet this goal if you want all your fee. And sometimes that number is as high as 40%, and we've seen those several times, where total revenue, 40% of it has to go to small businesses of all various different types of small businesses too.

This isn't just us. It's everything from IT companies to vendors that provide on-site services or even equipment and materials. So when you're a prime, and I've been in those shoes a couple of times where as a site manager I have to look at it and say, hey, we've to send these things out to small business for subcontracts and make sure they're participating. And what it does, it limits the competition, so there's only usually a couple of companies that are in a position to bid on them. And it keeps the small businesses growing and makes sure there's opportunities for this business to do well.

So it's really important that they take it seriously. DOE has improved their small business program dramatically over the last ten years overall. And some sites are better at than others. And every small business out there could tell you who the best ones were and who's the worst. But they're all getting better all the time and it's important for DOE to have that approach.

Speaker 6

Do these subcontracting requirements though apply to every contract they award or is there certain minimum thresholds and size?

Speaker 2

They all have small business plans. Everyone that's not a small business set aside, which is not many, but everyone that's not has a small business plan that's required to be written by the prime, the winner, that defines how they're going to meet the goals in the RFP. So yeah, they all have some goal, but they do vary in percentages depending on reasonableness.

Speaker 6

And is this the same with DoD?

Speaker 2

Yes, to a large degree. Mean, I don't know. I know on the environmental side, yes. If you're building F-thirty five fighter jets, I don't know if it has the same approach. But certainly usually on on construction and on environmental contracts, yes, they have goals like that.

Speaker 6

Okay. Last question. How you mentioned that you currently have capacity to do 30,000 gallons of treatment per month. To ramp that up, from 360,000 gallons a year to 500,000 gallons a year and then to 1,000,000 gallons per year, how much CapEx would be required?

Speaker 2

To go from $300,000 to $1,000,000 we're estimating and we haven't really done all the calculations on this, Anthony, but it's going to be under $1,000,000 to do that. It's the kind of thing you can do it gradually. In other words, there's a series of mixers that are required. We have the space fortunately, which makes this a lot simpler. We have the space now designated for it, but we'd have to buy some mixers and buy some infrastructure and address some power issues and that type of thing.

But it's not dramatic. And so we can get the million pretty easy. When we get to 3,000,000, which I hope that we're talking about in the next five years, then we're going to have to add some space and some additional buildings, which we'll gladly do. And we looked at that and said three to five years if that happens, that'll be probably a 3,000,000 or $4,000,000 capital need.

Speaker 6

Yes. Thank you. Appreciate it. Thank

Speaker 4

you.

Speaker 0

Your next question is coming from Ryan Hamilton from Morgan Dempsey Capital Management. Your line is live.

Speaker 5

Good afternoon. Thanks for taking my calls.

Speaker 2

Sure, Ryan.

Speaker 5

I may have jumped in a little late, so I apologize if some of this might have been touched already. But are you on the Navy side, are you putting that all that business in services?

Speaker 2

Yes, that's all in services.

Speaker 5

Okay, sounds good. On bidding activity, could you maybe touch on the size of the projects that you're seeing and maybe the number of bidders that are submitting bids and maybe how that compares historically?

Speaker 2

Yes. It really ranges, Ryan, across the board on these things like some of these MATOCs we've just won. There's one region that has 10 awards and one region has three awards. Typically, there'll be on those MATOCs more than a dozen people bidding it. So you really don't have a sense of who is really bidding against you.

Sometimes it's really hard to find out. On the DOE side of the house, most of the bids we've been putting in, there'll be three or five bidders, generally. For example, the Princeton job that we just won, which is a decommissioning of some equipment up in Princeton University, Princeton Plaza Physics Lab, it's about a $14,000,000 job. There was eight bidders, including some large businesses. So it really ranges depending on it.

We've had a couple of jobs we bid where there's no other competition. And so it just ranges from zero to five to eight at most on a task order.

Speaker 5

All right, sounds good. One more on the Navy side. Is there any opportunity for business on the treatment side?

Speaker 2

That's a good question. We only talked about the we do a lot of waste treatment for the Navy. We do the nuclear Propulsion Group. We do several million dollars a year. We get all their mixed waste.

But as far as the waste generated from these initiatives, most of it the contamination is low enough that you'll simply cut up the scrap metal into smaller pieces and put them in a specialized container and it can go out direct for disposal. So there's very little waste that needs treatment. Again, rate of activity on it is low enough that it can go directly into disposal and treatment is necessary. That's what we found for most of the ships that we've seen so far.

Speaker 5

Is there any opportunity on the sub side, the submarine side?

Speaker 2

You know, the submarine side are amazing engineering feats. The way the submarines work is there's three pieces to a submarine generally. Know, you have the all the nuclear components are in the center sleeve, they call it, and then both ends of them can be removed. And they maintain all of the radiological contamination in that centerpiece where the reactor is, and it comes out almost like a ring. And they're able to ship that whole ring for the most part off to Hanford for disposal.

So there's not a lot of waste generated. They actually built those things and designed them for or with decommissioning in mind to keep it simple. Ships are not like that. They're usually integrated and all the contamination is through the ship. So again, they haven't done a lot of them, I don't know.

What I'm talking about is what a very distinguished admiral told me and how it works. I haven't seen it firsthand. I don't know if they're all like that. Ones I'm familiar with, there's not that much waste generated from it that's coming to us.

Speaker 5

That's really fascinating. Last one for me, I believe it was either last call or maybe a call before that. You had touched about some business coming in from overseas on the treatment side. Maybe could you just touch on that, maybe what you're seeing in that market and maybe where you see it going forward?

Speaker 2

Well, I'm glad you asked that, Ryan. It's one the more exciting things that we're doing, and I didn't talk about it all today. We are seeing a real increase in international waste interest. At this point in time there's not a treatment facility in Europe like the facility we have in Richland that can incinerate radiological waste and significantly reduce the volume. So we're starting to see a big influx of interest and we've received some waste from Germany as well as UK.

We have waste from Italy coming in next quarter. And we have some big bids in the $20,000,000 range ongoing right now all over Europe. And we're excited about what that's going mean to us in 2022 and really get rolling in 'twenty three. So we figured out the logistics for shipping which was the big hurdle, how to get the permits you need to go through ports and basically we incinerate or burn it, which size reduces it well below 90%, ship it back to them and they rock it up or actually grout it up and put it in the long term storage or they can put it in some disposal facility as well. So that's really starting to get a lot of traction.

It will open up a lot of markets for us once we get some clients that are used to shipping to us. And I see that as a real incremental opportunity for growth.

Speaker 5

What do the margins look like on that compared to domestic?

Speaker 2

They're about the same. We keep them about the same. It's obviously very expensive to ship it. There's no real competition for some of the ways that we're talking about, they're covering that. It's a lot cheaper for them to do that than to build a facility over that, that's for sure.

Speaker 5

And is it safe to say that European governments are suffering from the same delays as the U. S. Government as far as awarding contracts and a lot of movement of this stuff?

Speaker 2

That's absolutely right. They're starting to just come out of it. England, we're working with them right now. They're a little bit ahead of everybody as far as procurement and those types of things goes, but the rest of Europe is still a couple months behind us. But we're meeting with them all the time and talking to them all the time.

And they have regulatory goals, just like we do, to move waste out and get rid of them. And so I do expect it to really pick up in Q2.

Speaker 5

Awesome. Thanks for the time. I really appreciate it. Good luck going Thank you.

Speaker 0

Thank you. There are no further questions in the queue. I will now hand the conference back to management for closing remarks. Please go ahead.

Speaker 2

Okay. My notes are all over my desk here. I will conclude by saying that wraps up our Q3 quarterly conference call. Again, we remain very confident in the outlook for our business going into Q4 as well as the New Year. We appreciate the continued support of all of our shareholders and we look forward to providing further updates as they unfold along the way through press releases and our website.

So thank you all for calling in.

Speaker 0

Thank you, ladies and gentlemen. This concludes today's event. You may disconnect at this time and have a wonderful day. Thank you for your participation.