Thank you for standing by, and welcome to the ReNew second quarter fiscal year 2026 earnings report. All participants are in a listen-only mode. There will be a presentation followed by a question-and-answer session. If you wish to ask a question, you will need to press the star key followed by the number one on your telephone keypad. I would now like to hand the conference over to Anunay Shahi, Head of IR. Please go ahead.

Anunay Shahi (Head of Investor Relations)

Thank you. Thank you. Good morning, everyone, and thank you for joining us today. We have put out a press release announcing results for fiscal 2026 second quarter, and the half year ended September 30, 2025. A copy of the press release and the earnings presentation is available in the investor relations section on ReNew's website at www.renew.com. With me today again are Sumant Sinha, our Founder, Chairman, and CEO; Kailash Vaswani, the CFO; and Vaishali Nigam Sinha, Co-founder of ReNew and Chairperson of Sustainability. After the prepared remarks, which we expect will take close to half an hour, we will open the call for questions. As per usual, please note that our safe harbor statements are contained within our press release, presentation materials, and materials available on our website. These statements are important and integral to all our remarks.

There are risks and uncertainties that could cause our results to differ materially from those expressed or implied by such forward-looking statements. We encourage you to review the press release we furnish in our Form 6K and the presentation on our website for a more complete description. Also contained in our press release, presentation materials, and annual report are certain non-IFRS measures that we reconcile to the most comparable IFRS measures, and these reconciliations are also available on our website in the press release, presentation materials, and our annual report. With that being said, it's now my pleasure to hand it over to our CEO, Sumant Sinha.

Sumant Sinha (CEO)

Yeah, hi. Thank you, Anunay. Good morning, good evening to everybody. I'm glad to have you all on our earnings call for the second quarter and for the first half of fiscal 2026. While we continue to see global macroeconomic and trade-related volatility, the situation in India remains relatively benign. S&P has upgraded India's long-term credit rating, and the inflation remains low, providing scope for further rate cuts by the Reserve Bank of India. There is also expectation of an Indo-US trade deal being concluded and announced in the near future. Coming to the energy sector, we also have seen an unusual trend in climatic conditions this year in India. There has been an extended spell of the monsoons, resulting in more muted power demand growth, as well as lower solar PLFs compared to last year.

On the policy front, in a welcome move, the Government of India took a significant step and reduced the goods and services tax on most items in the renewable energy sector from 12% to 5%. This should further increase the affordability of clean energy, which was anyway the cheapest source of electricity in India. As a company, we continue to deliver profitable growth, deliver on project execution, as well as demonstrate capital discipline in delivering returns significantly above our cost of capital. Turning to our highlights for the quarter, since October of last year, we have commissioned over 2.1 GW of renewable energy capacity, marking a 22% growth in our portfolio after adjusting for the asset sales over the period.

We continue to expand our committed portfolio and have signed PPAs for 3.8 GW of installed renewable energy capacity over the past four quarters for projects that should provide returns towards the higher end of our targeted IRR range, if not better. We therefore reiterate our FY 2026 MW guidance and are on track to complete construction of 1.6-2.4 GW of capacity in fiscal 2026. Turning to our financial highlights, we continue to demonstrate strong financial performance, delivering adjusted EBITDA of INR 53.5 billion, which is a 24% growth year on year for the first half of the fiscal year ended March 31, 2026. We have also meaningfully improved our leverage metrics for operational projects, and we reaffirm our fiscal year 2026 adjusted EBITDA guidance of INR 87 billion-93 billion.

Our manufacturing business, comprising of an operational capacity of 6.4 GW of modules and 2.5 GW of cells, is fully stabilized and produced over 2 GW of modules and over 900 MW of cells in H1 FY 2026. Manufacturing also made a meaningful contribution of INR 3.3 billion towards adjusted EBITDA for the quarter, which adds up to INR 8.6 billion for the first six months of fiscal year 2026. As a result, we are revising our FY 2026 adjusted EBITDA guidance for manufacturing upwards to INR 10 billion-12 billion. We are also steadfast in our ESG commitments, as showcased by the rating of 83 out of 100 in the S&P Global Corporate Sustainability Assessment, which we received recently. This is the highest ever by any Indian IPP. We were also recognized in the Fortune Global Change the World List 2025 for the third time.

We have also published our inaugural climate risk and biodiversity risk reports aligned with the TCFD and TNFD frameworks, indicating our continued push towards transparency and governance. Turning to page nine, execution is our topmost priority and a key differentiator for us. We have commissioned over 2.1 GW of capacity over the last 12 months or so, and we iterate our guidance to complete the construction of 1.6-2.4 GW for fiscal year 2026. Year to date, we have commissioned more than 1.2 GW, which are split into approximately 750 MW of solar capacity and nearly 500 MW of wind. In addition, we have over 500 MW of solar capacity that has already been erected and will enable us to meet our construction targets.

While there has been some lull in the bidding environment, we believe that this is cyclical, as most IPP players have already been able to build pipelines that will be executed in the next four or five years. Turning to page 10, our solar manufacturing facilities are now operating at full tilt. They are currently producing over 12 MW of modules and 5 MW of cells on a daily basis. In the first half of this year, we produced close to 2 GW of modules operating at high utilization and efficiency levels. We currently have third-party orders to sell approximately 650 MW this fiscal, with close to 1.5 GW already delivered this year. In September 2025, we also closed the $100 million investment from British International Investments, which will primarily be used for expansion of the cell facility.

We are pleased to say that the construction of our new 4 GW TOPCon cell facility is on track, with the land acquisition, engineering, and machinery orders completed, and the civil works well underway. Our manufacturing business has started contributing meaningfully to the consolidated P&L by delivering an adjusted EBITDA of INR 3.3 billion this quarter at a margin of over 30%. The EBITDA contribution in this quarter has moderated as compared to the previous quarter due to a higher percentage of captive sales. In addition, the margins are slightly higher due to some cost savings and procurements ahead of time, which may normalize as this year progresses. Now, let me hand it over to Kailash to talk more about the financial highlights.

Kailash Vaswani (CFO)

Thank you, Sumant. Turning to page 12, we continue to deliver consistent profitable growth. Since the same time last year, we have constructed over 2.1 GW of projects, representing a 22% increase in operating capacity after adjusting for the 600 MW sold during the trailing 12 months. This year, so far, we have commissioned over 1.2 GW of renewable energy capacity. Our revenue increased by over 50% for H1 of this fiscal compared to last year due to an increase in MW and a meaningful contribution from third-party sales in our manufacturing business. Turning to page 12 and the EBITDA walk, we saw subdued PLFs this quarter due to lower irradiation from an extended spell of monsoon, resulting in a net negative impact of INR 1.7 billion for the quarter compared to last year.

The new projects that we commissioned over the last 12 months contributed INR 2.5 billion to our adjusted EBITDA, while the manufacturing business provided INR 3.3 billion. Over the past year, we have sold 600 MW of solar assets as well as a transmission project, contribution from which was also absent in the adjusted EBITDA for this quarter. Turning to leverage, the headline leverage continues to decline significantly and consistently, having reduced from 8.6% in September 2024 to 7% in September 2025. Leverage at the operating asset level also continues to be below the 6x threshold that we have set. On a trailing 12-month basis, the leverage was around 5.5x, excluding our under-construction portfolio and the contribution from our JV partners.

Do note that our trailing 12-month EBITDA is not reflective of the run rate EBITDA for these assets, as many of these assets have less than one year of operation. We continue to pursue all options that will improve our leverage ratio at the consolidated levels, such as asset recycling, cost optimization, and reduction in the corporate debt. During the quarter, there was also favorable macro news, with S&P upgrading India's long-term ratings to BBB from BBB-, which was the first upgrade in almost 18 years. There was also a reduction in GST rates by the Government of India. There are also further expectations of rate cuts by RBI, which should also get transmitted to our future borrowing costs. Let me now hand it over to Vaishali for comments on ESG.

Vaishali Nigam Sinha (Chairperson of Sustainability)

Thanks, Kailash. Turning to page 15, let's look at the advancements in ReNew Sustainability Initiatives and targets. The global landscape is shifting quickly towards mandatory regulations as climate impacts intensify. In India, recent reports highlight extreme heat challenges, while events such as the August 2025 floods in Uttarakhand and Punjab, along with severe AQI levels in Delhi, underscore the urgent need for action and resilience. At ReNew, we remain steadfast in our mission to lead with purpose and resilience. Our continued commitment to purpose-driven sustainability continues to deliver results, reflected most recently in our standout performance in the prestigious S&P Global CSA Assessment, which is one of the key highlights of this quarter. We achieved a score of 83, our highest ever, marking a 14% year-on-year improvement and more than doubling our score since our fiscal year 2022 debut.

This makes ReNew the highest-rated India-based energy company and places us among the top 10% of energy companies globally. This milestone reflects the depth and breadth of our overall climate strategy, human rights, and our continued commitment to transparency and ethical governance. In terms of awards and recognitions, as was mentioned earlier, Fortune Change the World List 2025 in that ReNew has been recognized in this prestigious list for the third time. This marks our second consecutive recognition for a community water-related initiative in Rajasthan. Forbes Sustainability Leaders, ReNew's Chairman and CEO, Sumant Sinha, was named among the top 50 climate leaders globally, reinforcing ReNew's leadership in the sustainability movement. On the reporting front, we published our inaugural climate risk report aligned with IFRS S2 and TCFD, outlining key climate-related risks and opportunities.

We also released our first nature risk report aligned with TNFD, identifying nature-related risks and opportunities critical to our long-term resilience. Now, turning to page 16 to see the progress made across our ESG targets, we remain fully committed to our sustainability roadmap and have made meaningful progress across overall sustainability goals. We have achieved an 18.2% reduction in our scope one and two emissions from the baseline, and as part of our pilot study, two of our sites have become water positive. Social responsibility remains at the heart of our work. We strongly believe that a just energy transition must empower those at the grassroots, and we continue to upskill and train women and coal mine workers in green technology. Diversity forms a core aspect of our overall sustainability strategy, and our full-time employee diversity now stands at approximately 16.2%.

Our S&P Global CSA score of 83 continues to reflect our leadership in sustainability. We are currently awaiting results from other ESG ratings and will disclose progress across all ratings in our upcoming meeting. As we move forward, we remain committed to delivering sustainable growth and driving positive change across the world. I will now turn it back to Kailash.

Kailash Vaswani (CFO)

Thank you, Vaishali. Turning to guidance for the fiscal year ended March 31, 2026, we reiterate our guidance provided earlier. We expect to be at the higher end of the adjusted EBITDA guidance range of INR 87 billion-INR 93 billion, subject to weather staying on track for the remaining of the year. We also expect to construct 1.6-2.4 GW of projects during the year and generate cash flow to equity of INR 14 billion-INR 17 billion. During the first half of this fiscal, while we saw marginally better wind PLFs versus last year on account of the extended monsoon, we saw significantly lower PLFs in solar, resulting in overall lower PLF year on year.

Our overall consolidated adjusted EBITDA has also benefited from the performance of our manufacturing business, wherein we have increased the range of EBITDA contribution by INR 2 billion, revising the guidance to INR 10 billion-12 billion for the remaining part of the year. With that, we will be happy to take questions.

Operator (participant)

Thank you. If you wish to ask a question, please press star one on your telephone and wait for your name to be announced. If you wish to cancel your request, please press star then two. If you are on a speakerphone, please pick up the handset to ask your question. Your first question comes from Justin Clare with Roth Capital Partners. Please go ahead.

Justin Clare (Managing Director and Senior Research Analyst)

Hi. Thanks for the time. I wanted to start here just on the progress that you continue to make on the contracting side. I think 3.8 GW of PPA signed over the last 12 months. Could you just comment on the contracting environment, your expectations for additional PPA signings over the next few quarters? Do you have any sense for when you might contract the entire 25-GW pipeline that you currently have secured?

Kailash Vaswani (CFO)

Sumant, would you like to take that?

Sumant Sinha (CEO)

Yeah. Okay. Hi, Justin. Yeah. Look, we've made some good progress on our PPA signings over the last 12 months, and we have approximately, as you know, about 6 GW of LOAs that we would hope a substantial chunk of that would convert into PPAs. It's hard to give you a specific visibility on it because PPAs get signed when they do based on feedback from the DISCOMs. Our expectation would be that over the next six months or so, a reasonable chunk—and it's very hard for me to hazard exactly how much—of the six would get signed. It's very hard to give a specific indication as to when all of it might get converted. I think we just have to be patient, and we have to continue to work with the DISCOMs.

A lot of that capacity is the more structured products, and that does take time for discounts to essentially convert on because we need to do a lot of diligence and work. The other thing also is that a lot of the capacity is for execution out to 2029, 2030, and so on. There, we have to work very closely with the discounts to see what the requirements are, see if we can prepone some of that capacity or not. There is a lot of conversation and dialogue going on with the discounts through the REIAs, the bidding agencies to convert this capacity. It is hard to give you a very specific timeline as to when all of that will be converted at this point.

Justin Clare (Managing Director and Senior Research Analyst)

Okay. Got it. That's helpful. I guess just thinking through your pipeline here, I was wondering if you could just update us on the transmission status for the projects in your pipeline, especially as you go out into 2029, 2030, and maybe help us understand the remaining risks in securing the transmission necessary for your assets.

Sumant Sinha (CEO)

Yeah. So we have most of the transmission in place because the moment you win a bid and you get to the letter of award, you are allowed to go and block connectivity. So we've actually blocked connectivity for the entire 25 GW. Plus, you're also allowed to block connectivity based on acquiring land, which is not linked to a specific project. So we blocked a fair amount of connectivity basis that as well, which is not linked to a specific project. Now, as I said, what is happening is that some of the DISCOMs are coming back and saying that, "Look, if the projects are to be constructed based on transmission coming up in 2029 or 2030, that may be too far away for us.

Can you give us the projects a little faster? We are seeing where we have the flexibility of converting the existing transmission connectivity that we have, which is further out, to in some ways try to replace that with some of the land-based connectivity that we have, which may be coming up sooner. That is work that we are doing to see which of those PPAs we want to actually prepone using the land-based connectivity that we have. That gives us a lot of flexibility, actually, in terms of allowing us to convert some of those LOAs into PPAs at an earlier stage. Of course, land-based connectivity at this point is a very scarce commodity, and it is very valuable, so we want to use it very carefully.

Justin Clare (Managing Director and Senior Research Analyst)

Okay. Appreciate it. Just one more on the manufacturing business, the solar manufacturing. Even on margin, it looks like it moved lower to 33% in fiscal Q2 from 40% in Q1. I think in your prepared remarks, you mentioned maybe a higher mix of captive sales, but I wanted to better understand what drove the decline. Maybe you could just expand on that a little bit. If you could provide your expectations for how even on margins might trend into the back half, that would be helpful. Thank you.

Sumant Sinha (CEO)

Yeah. So actually, one of the things I think that, hi, Justin. Yeah. Hi, Justin. Thanks. See, Justin, the captive sales do not really have an impact on the reported EBITDA margins because when we report our numbers, we only report for third-party manufacturing sales. Obviously, if Q2, Quarter One was exceptional, we had better realizations, and to that extent, the margins were high. Obviously, Quarter Two is a relatively leaner month when it comes to sales. To the extent we were producing, we were also selling at the same time. That is why there was some impact in terms of realizations, which caused the margins to be lower. Secondly, also in Quarter One, we had done some strategic procurement earlier before the prices went higher for wafers and all and some of the other key equipment to make cells and modules.

I think that we saw it play out in Quarter One. Quarter Two was obviously with the revised pricing that we got on our procurement side.

Justin Clare (Managing Director and Senior Research Analyst)

Okay. Thank you. I'll pass it on.

Sumant Sinha (CEO)

Thank you.

Operator (participant)

The next question comes from Nikhil Nigania with Bernstein. Please go ahead.

Nikhil Nigania (Director)

Hi. Thank you for taking my question. My first question, just continuing on the discussion on the solar manufacturing bit, it would be great if you could share some timelines on the expected commissioning for the cell expansion and also if there are any plans to enter ingot wafer given the guidance government has given.

Sumant Sinha (CEO)

Nikhil, on cell expansion.

Nikhil Nigania (Director)

Go ahead.

Sumant Sinha (CEO)

We are currently in advanced stages in terms of land acquisition and placing some of the key equipment orders. We expect that we'll start seeing pre-commissioning happen by the same time next year. I think the full commissioning would happen perhaps by the end of fiscal 2027. In terms of plans on wafer, the notification is relatively new. We will obviously see what the merits of that expansion would be and then accordingly decide if we want to expand into wafer ingots.

Nikhil Nigania (Director)

Understood. The second question I had on the manufacturing bit is we heard that there has been some softening in prices on the non-DCR modules, whereas DCR remains strong heading into this quarter as well. Would you agree to those points on both those points?

Sumant Sinha (CEO)

Yeah. Nikhil, again, along expected lines, I would say, as more capacity has come online, that sort of trend does tend to play out. There is also a factor of seasonality where it was a lean season in terms of construction activity. We saw some slowdown in sales. Obviously, prices also could have moved down a little bit. Let's see how the rest of the year pans out. Again, as capacity comes up, the supernormal margins that we were getting would have corrected over a period of time in any case. On the DCR side also, I would say that while right now there is no immediate concern, there is more capacity coming online on the cell side also. Again, the margins would go to normalized levels over a period of time.

Nikhil Nigania (Director)

Perfect. Very helpful on the manufacturing bit. My second question then was on the renewable assets. If I look at the committed pipeline of 7 GW, which is to be built out, there is about 2 GW of solar where I think the timeline clarity is better. The balance 5 GW seems to be the complex projects, FDRE, RTC, where the timeline given is two years from PPA, subject to transmission. I would appreciate if you could give some more color on when you expect this balanced capacity to come online, the committed pipeline in the complex FDRE, RTC part, because that's a substantial number.

Sumant Sinha (CEO)

On the committed pipeline side, we're expecting some of the transition projects are yet to be awarded. We won't have the exact sense of what the timelines on those would be. Again, given our understanding at the time currently, by FY 2029 is when most of it would get done, and some part only could overflow beyond that.

Nikhil Nigania (Director)

Understood. So then is there a possibility that if I spread this 7 GW till FY 2029, there could be a drop in capacity addition in FY 2027 or FY 2028?

Sumant Sinha (CEO)

No, we continue to build on the pipeline, Nikhil. Also, there will be within the state interstate type of projects, which we could evaluate and participate in some of those auctions or do CNI. I think as a company, we have been on this capacity addition trajectory. I do not see any reason why that should change because of connectivity not being available.

Nikhil Nigania (Director)

Got it. Directly, if you could tell me, have things got better on transmission project completion or right of way for that part, or is it similar to where it was last year?

Sumant Sinha (CEO)

Hard to tell because every project, every transmission project has its different qualities where it either gets done on time or later. The situation on the ground is that in Rajasthan, which was relatively easier in terms of execution, some ROW issues have been coming up there also.

Nikhil Nigania (Director)

Got it. That's helpful. My last question was then on the future or the ongoing bidding. We see a lot of battery energy storage tenders happening. I mean, to us, the bids seem quite aggressive, but wanted to hear your thoughts if ReNew feels similar and that's why ReNew has not been very active on that front.

Sumant Sinha (CEO)

That's absolutely correct. Our actions are reflective of what our belief is.

Nikhil Nigania (Director)

Perfect. Thank you. Those were my questions. Thanks for answering them.

Sumant Sinha (CEO)

Thanks, Nikhil.

Operator (participant)

The next question comes from Puneet Gulati with HSBC. Please go ahead.

Puneet Gulati (Analyst)

Yeah. Thank you so much. My first question is if you can talk a bit about whether you also experienced any curtailment during the last quarter and what was the extent of that?

Nikhil Nigania (Director)

Sumant, would you like to take that?

Sumant Sinha (CEO)

Yeah. Sure. No, no. We did experience some curtailment in some of our projects in Rajasthan, Puneet. The extent of that was about INR 100 crore in terms of actual routine number in the first half. These are linked to projects where we have of revenue. Yeah. Of revenue, yeah. These are linked to projects where we have GNA where the substation is ready, and we have to connect. Sometimes the backend lines are not ready to give us the full GNA. I think this will continue to some extent until some of those backend lines are done, which will probably happen in the next couple of months. At least in those areas, that curtailment will go down.

Puneet Gulati (Analyst)

Okay. That's fine. In terms of just absolute power capacity, what number would that be in terms of curtailment?

Sumant Sinha (CEO)

To assume an average tariff of maybe INR 3.50-4 rupees.

Puneet Gulati (Analyst)

Okay.

Sumant Sinha (CEO)

It will probably be whatever units work out to.

Puneet Gulati (Analyst)

Yeah. Yeah. Very good. Thank you, sir. Secondly, on the connectivity side, you have the target of 1.6 GW-2.1 GW for this year. Is connectivity ready for all these projects up to 2.1 GW, or is there still very well banking on timely commissioning of connectivity?

Sumant Sinha (CEO)

I would say most of it is ready. There is one, of course, issue that is currently going on, which is the Great Indian Bustard issue that the Supreme Court is opining on. I think that is the only externality that we are facing in these projects. Hopefully, that gets resolved, and therefore that does not end up being a constraining factor. Regardless, even if there is a delay, it will be a delay of a month or two months at max. It is not going to be substantial from the point of view of impacting financials that much.

Puneet Gulati (Analyst)

Okay. Lastly, you commissioned RTC, peak power projects. Can you also talk a bit about how those have been going in terms of how much capacity are you now selling outside, and how has the battery performance been?

Sumant Sinha (CEO)

I don't think I have exact numbers to give you or to share with you, Puneet, on this one. So Anunay or Kailash, if you guys have data then, please do go ahead.

Anunay Shahi (Head of Investor Relations)

Puneet, on peak power, it is fully commissioned. The entire 400 MW of RE capacity plus 150 MW hours of batteries are done. My experience has been pretty good. On RTC, the batteries are done as well as about 1,100, close to 1,100 MW of RE capacity, which is about 700 MW of wind and 400 MW of solar. Nothing really to complain, no concerns as such on both these projects on the operating performance.

Puneet Gulati (Analyst)

Okay. Great. That's helpful. Thank you so much and all the best.

Operator (participant)

The next question comes from Maheep Mandloi with Mizuho. Please go ahead.

Maheep Mandloi (Director)

Hey, thanks for taking my questions here. One question just on the manufacturing side, and I think Kailash talked about normalized margins or anything that in the future. Can you talk about what expectations are on normalized margins in the future for cellular modules?

Kailash Vaswani (CFO)

Maheep, it's hard to say at this point in time. When we do our projections, we don't take 35%-40% type of margins. We are more like more reasonable. It will be a function of what happens as far as the demand-supply situation is concerned. Let's see. It will be hard for me to give you an exact number.

Maheep Mandloi (Director)

Is there any thoughts on when we hit that, like maybe one or two years after the approved list of cell manufacturers would affect or when we get there?

Kailash Vaswani (CFO)

As part of ALMM for sales, also a lot of capacity is coming up. Some of it is coming up now before ALMM comes into being, which is April next year. To that extent, there would be some additional supply also, which is there in the DCR market right now. Then again, as the window for ALMM on cells starts, you'll see margins spike up briefly. I think whichever segment of the market, there is scarcity. We are seeing an initial period of, say, 12-15 months, 18 months, where we are making higher than our expected margins.

Maheep Mandloi (Director)

Got it. Got it. I would love to just ask a question on the privatization bit here. I saw the latest updates from New York press release recently. Any updates after that on the offer or any bids you're receiving from other investors? Thank you.

Kailash Vaswani (CFO)

No. If there was any other bid, then that would have had to be announced to the market. At this point in time, the special committee has only received the bid from the consortium.

Maheep Mandloi (Director)

Any thoughts on the timeline here or the consortium had a timeline of, I think, T plus one year? Is that a fair kind of timeline for the closing there?

Sumant Sinha (CEO)

I mean, that's what they have shared in their filings. Hopefully, we will be efficient about it to the extent. Some of the processes which are within the control of the company is concerned.

Maheep Mandloi (Director)

All right.

Anunay Shahi (Head of Investor Relations)

Maheep, just to clarify, I think they had, the consortium had indicated T plus seven to eight months. As Kailash said, our assessment is that hopefully it gets sooner than that. This is perhaps at the more conservative end of the range.

Maheep Mandloi (Director)

Appreciate the clarification. Thank you.

Operator (participant)

We have a follow-up from Nikhil Nigania with Bernstein. Please go ahead.

Nikhil Nigania (Director)

Hi. Thanks for taking my question again. I just had one follow-up question. On the 6 GW or so, which is where the LOA is awarded, but the PPA is not signed, there were multiple press articles recently highlighting government plans to cancel this 42 GW of renewable tenders where the tenders have been awarded, but PPAs have not been signed. Any thoughts on that? In light of that, could this 6 GW go away?

Sumant Sinha (CEO)

My view on that, Nikhil, is that there were a lot of things that came out on the press. Finally, the final word on it is what Emanuela said, which is that they are working and encouraging the REIAs to get all the PPAs signed and that they will continue to work at it. Any cancellations, if at all, will be done after a lot of effort has been put in and on a very selective and case-by-case basis. I do not see any blanket sort of decision being taken on this. I think it will carry on for some more time. People are going to continue to put in effort to get this PPA signed.

It's only after maybe another six months, nine months, or a year that we will see what happens in case some of the PPAs, even after, let's say, a couple of years of having got bid out, have not got signed, what action the government then takes. I think at this point, it's still premature.

Nikhil Nigania (Director)

Understood. Appreciate the answer. Thank you so much.

Operator (participant)

Now, I would like to pass to Anunay Shahi for online questions. Please go ahead.

Anunay Shahi (Head of Investor Relations)

Thank you. There are a couple of questions online. One is, Kailash, if you could take this, is what are the plans for refinancing the Diamond II bonds due in 2026 and the INGPH, which is a restricted group issuance, which is due in 2027? Is the plan to refinance it again with dollar bonds or locally in INR?

Kailash Vaswani (CFO)

The answer to that question is that the majority for both those bonds are in the second half of next calendar year. We are working on plans to refinance it. We will see whichever market offers the lowest cost of capital to refinance, we would pursue the refinancing in that market. Having said that, overall, the financing markets continue to remain quite strong and robust. Access to capital is there across multiple pools that we typically access, which includes not only the dollar bond market, but also the domestic financing market where the public sector undertakings, the financial institutions, the private sector banks, they are all quite active and focused on financing renewable energy projects. We do not foresee any major challenges in the refinancing whenever that becomes due.

Anunay Shahi (Head of Investor Relations)

The second question, Kailash, I think this is for you as well, is on the status of the TIC private offer. I think the question is, when do you expect the consortium to firm upon their offer? Is it likely to be in November? The second question is, are you in regular discussions with them? Do you know if they are talking directly with some of your long-term shareholders?

Kailash Vaswani (CFO)

Okay. Just let me know if I missed any answer. In terms of process from here on, I think the special committee has shown its support to the final non-binding offer received and asked the consortium to convert the same into a binding offer. The expectation is that sometime within the month of November is when we will get the final binding offer from the consortium. From there on, I think there would be process in terms of documentation. We'll sign the transaction agreement, work towards the 13D filings, then the E3 filing with the scheme for SEC review. All of that process will happen. I am in touch with the special committee whenever those meetings get held along with the General Counsel of the company.

The special committee is engaging with some of the public shareholders, the large public shareholders, and to the extent some of the public shareholders have expressed an interest to also speak to the consortium. I think they are allowing that also or facilitating that rather. Yeah, I think I've answered some of the questions. Did I miss anything? Let me know.

Anunay Shahi (Head of Investor Relations)

No, I think that was all.

Kailash Vaswani (CFO)

Okay.

Operator (participant)

As there are no further questions at this time, this concludes the question and answer session and the ReNew second quarter fiscal year 2026 earnings report for today. Thank you for participating. You may now disconnect.