Imperial Oil - Q1 2023
April 28, 2023
Transcript
Operator (participant)
Good day, welcome to the Imperial Oil First Quarter 2023 Earnings Call. Today's conference is being recorded. At this time, I would like to turn the conference over to Dave Hughes, Vice President of Investor Relations. Please go ahead.
Dave Hughes (VP of Investor Relations)
All right. Thank you very much. Good morning, everybody. Welcome to our first quarter earnings call. With me today is the management team. We have Brad Corson, Chairman, President, and CEO. Dan Lyons, Senior Vice President, Finance and Administration. Simon Younger, Senior Vice President of the Upstream. Sherri Evers, Vice President of Commercial and Corporate Development, and Jon Wetmore, Vice President of the Downstream. Starting with the cautionary statement, today's comments include reference to non-GAAP financial measures. Definitions and reconciliations of these measures can be found in attachment six of our most recent press release and are available on our website with a link to this conference call. Today's comments may also contain forward-looking information. Any forward-looking information is not a guarantee of future performance and actual future performance and operating results can vary materially depending on a number of factors and assumptions.
The forward-looking information and the risk factors and assumptions are described in further detail in our first quarter earnings release that we issued this morning, as well as our most recent Form 10-K, and all of these documents are available on SEDAR, EDGAR, and on our website. I'd ask you to please refer to those. As usual, after Brad and Dan go through our the prepared remarks, we'll be switching over to Q&A. With that, I'll hand it over to Brad.
Brad Corson (Chairman, President, and CEO)
Thanks, Dave. Good morning, everybody, welcome to our first quarter earnings call. I hope everyone is doing well and had a great start to the year. I'd also like to take a quick moment to thank everyone for attending our Investor Day last Wednesday, both in person and virtually. It was our first in-person Investor Day since 2019, it was great to get to see so many folks in person again. Your positive feedback on the event was very much welcome and appreciated, as is your ongoing support. I want to open by providing a brief update on our efforts to address the seepage issue at Kearl that we have been talking about over the last several weeks. We continue to work closely with regulatory officials from the Alberta Energy Regulator and other government officials.
We have about 200 people working to advance our mitigation efforts related to the Environmental Protection Order, we're making very good progress. Most of this work was completed by the end of April, we expect to finish by the end of May. In addition, we are continuing to engage directly with local indigenous communities to share information and are providing regular updates on progress. Throughout this incident, testing has continued to show drinking water in the region is safe, there were no impacts to fish populations in nearby river systems. I want to say again that we are deeply apologetic for this situation, we're working hard to correct it and ensure that it does not happen again. At our last earnings call in February, we reported what was the best year in Imperial's history.
This performance was underpinned by strong operating performance and reflected the robust commodity price environment. We've carried that momentum into the new year. The focus we have been consistently placing on safe, reliable operations continued to pay off in the first quarter as we delivered another strong quarter, both financially and operationally. We did see some moderation in crude prices and diesel cracks, but the overall commodity price environment remains quite supportive. On the operations side, we had a record first quarter for production at Kearl, and we delivered another very strong quarter in our Downstream with utilization of 96% based on the restated higher capacity we talked about in our year-end reporting.
Finally, after a year which saw our highest level of shareholder returns ever, we have continued to demonstrate our commitment in this area with the announcement of a $0.06 per share dividend increase today. Over the next few minutes, Dan and I will detail the results of what was another very strong quarter. Now let's review the first quarter results. Earnings for the quarter were $1.25 billion, with cash from operating activities of over $1.5 billion when excluding working capital impacts. Total upstream production in the quarter was 413,000 gross oil equivalent barrels per day, a result of strong operating performance across our entire upstream portfolio. I'll talk about each asset in more detail in a few minutes. We also had another great quarter in the Downstream.
Refining throughput averaged 417,000 bbl per day, which equates to a refinery utilization in the quarter of 96%. As we talked about throughout last year, these high utilization rates are delivering significant value in the current commodity price environment. We continue to invest for the future with our focus on the work to progress what will be Canada's largest renewable diesel manufacturing facility at our Strathcona refinery. Following the final investment decision announced earlier this year in January.
We also successfully started up the third boiler flue gas unit at Kearl as we continue to progress an initiative that, once complete, is expected to reduce greenhouse gas emissions by up to 220,000 tons per year. Finally, we continue to demonstrate our commitment to shareholder returns by announcing a second quarter dividend of $0.50 per share, which is an increase of $0.06 per share or 14% versus the last quarter. With that, I'll pass things over to Dan.
Dan Lyons (SVP of Finance and Administration)
Thanks, Brad. Starting with our financial results for the first quarter, we recorded net income of CAD 1.248 billion, an increase of CAD 75 million from the first quarter of 2022, driven by strong operating performance across all business segments. Looking sequentially, first quarter net income of CAD 1.248 billion is down CAD 479 million from the fourth quarter of 2022, mainly driven by lower upstream realizations and weaker refinery margins. Now looking at each business line, the upstream reported net income of CAD 330 million, down CAD 201 million from the fourth quarter net income of CAD 531 million, reflecting lower realizations and seasonally lower volumes.
Downstream net income was $870 million, down $318 million from fourth quarter net income of $1.188 billion, reflecting lower refinery margins and lower volumes. Finally, our chemicals business continued to demonstrate strong and reliable operational performance with net income of $53 million in the first quarter, up $12 million from the fourth quarter. Moving on to cash flow. We ended the first quarter with over $2.2 billion of cash on hand. In the quarter, we had negative cash flow from operating activities of $821 million compared to positive cash flow from operating activities of around $2.8 billion in the fourth quarter.
As previously indicated, we were planning to and have now made an income tax catch-up payment of around CAD 2.1 billion in the first quarter. When we exclude the impact of this tax payment and other working capital impacts, we had positive cash flow of CAD 1.554 billion. As I have previously mentioned, we expect to be tax-paying in 2023. Therefore, in addition to the catch-up tax payment we made in the first quarter, we expect to make regular tax installment payments throughout the year. Depending on our earnings, our installments could be on the order of around CAD 500 million per quarter. Now, discussing CapEx.
Capital expenditures totaled $429 million in the first quarter, up $133 million from the first quarter of 2022, and in line with our full year guidance of $1.7 billion. In the upstream, first quarter spending focused on smaller projects to sustain and grow production at Kearl, Cold Lake, and Syncrude, as well as progressing our in-pit tailings project at Kearl and our SA SAGD Grand Rapids project at Cold Lake. Grand Rapids remains on track to be completed on an accelerated basis by the end of this year, about one year ahead of schedule. In the downstream, fourth quarter spending focused on progressing our Renewable Diesel project at Strathcona, which is planned to start up in 2025. Shifting to shareholder distributions. In the first quarter of 2023, we paid $266 million of dividends.
We continue to demonstrate our long-standing commitment to return cash to shareholders. A reliable and growing dividend is fundamental to our cash distribution strategy. As Brad noted, we announced a CAD 0.06 increase in our quarterly dividend this morning, increasing it to CAD 0.50 per share payable in July. I'll turn it back to Brad to discuss our operational performance.
Brad Corson (Chairman, President, and CEO)
All right. Thanks, Dan. Now let's talk about our operating results for the quarter. Upstream production for the quarter averaged 413,000 oil equivalent barrels per day, which is down 28,000 bbl per day versus the fourth quarter of 2022, but up 33,000 bbl per day versus the first quarter of 2022. If you adjust for the sale of XTO and the absence of XTO volumes versus the first quarter of 2022, we are actually up 48,000 bbl per day. The drop versus the fourth quarter of 2022 is really just a seasonal factor, with the first quarter typically being a lower production quarter due to the winter weather conditions. Of note is a significant increase in production versus the first quarter of 2022 when we experienced issues from extreme cold weather.
This increase was in large part driven by improved performance at Kearl as we successfully implemented revised winter operating procedures. In the quarter, we saw crude prices come down versus the fourth quarter of 2022. Although we also saw a slight narrowing of the WTI/WCS differential, overall bitumen realizations were down quarter-over-quarter. I would also note that we continued to see an above mid-cycle refining margin environment, which helped to offset the wider crude differentials in the upstream. I think that clearly highlights the value of our integrated model. Now let's move on and talk about Kearl more specifically.
Kearl's production in the first quarter averaged 259,000 bbl per day gross, which was down 25,000 bbl per day versus the fourth quarter of 2022, but up 73,000 bbl per day from the first quarter of 2022. This represents the highest first quarter production in the asset's history, another record for us. Our previous best first quarter was 251,000 bbl per day in 2021. This best ever performance was in large part a result of many of the steps we took at Kearl after the severe weather issues we saw in the first quarter of last year. We learned from that event and developed and implemented enhanced winter operating procedures, which have certainly paid off.
This record first quarter comes on the heels of our best ever second half of the year in 2022, which demonstrates the sustainability of strong performance at Kearl and reaffirms our confidence in achieving 280,000 bbl per day in 2024. I would also point out that we have our annual planned turnaround at Kearl in the second quarter. It is scheduled to start in mid-May and run through mid-June, and have an expected annualized impact of around 11,000 bbl per day gross. Finally, turning to cash operating costs. We saw a decrease of almost $2 per barrel versus the fourth quarter to just under $25 per barrel.
This is almost $10 per barrel lower than the first quarter of 2022, reflective of the improved reliability year-over-year, as well as our continued discipline to improve our cost structure. Given a number of structural cost reduction initiatives we are working on, we continue to target sustainable unit cash operating costs at or below $20 per barrel at Kearl. A key part of our operating cost focus is our effort to convert our haul trucks to driverless technology. At Kearl, we are now the first fully autonomous oil sands mining operator, meaning we have fully converted our active mine area to autonomous. 65 out of our 77 Caterpillar 797 haul trucks have been converted to autonomous, and the remaining 12 are expected to be complete by the end of the second quarter.
Not only does this result in improvements in safety, but we also expect to see unit cash cost benefits of at least CAD 1 per barrel with this technology, and we see potential for productivity upside around 10% to 15% relative to staffed trucks. Also at Kearl, we successfully started up the third boiler flue gas unit and plan on starting up the remaining three units this year as part of our efforts to reduce Scope 1 emissions at Kearl. Once all six are up and running, they will have the potential to reduce greenhouse gas emissions by up to 220,000 tons per year by recovering waste heat from the boiler's exhaust. Cold Lake continues to perform very well also.
First quarter production of 141,000 bbl per day marks the sixth consecutive quarter at or above 140,000 bbl per day. The 141,000 bbl per day was essentially flat versus both the prior quarter as well as the first quarter of 2022. It's consistent with the guidance we provided for the year of 135,000bbl to 140,000 bbl per day. The annual guidance reflects a planned turnaround at Cold Lake's Nabiye plant, which is scheduled to take place in the third quarter and have an annualized volume impact of around 2,000 bbl per day. Finally, Grand Rapids phase I continues to progress well against the accelerated timeline we talked about last quarter.
Construction is now 65% complete, and we have finished drilling a total of 21 well pairs and are working through completions of those wells now, with start-up of steam injection expected later this year. Imperial's share of Syncrude production for the quarter averaged 76,000 bbl per day, which was roughly in line with the first quarter of 2022, but 11,000 bbl per day lower than the fourth quarter of last year due to some unplanned maintenance, as well as an earlier start to the planned coker turnaround, which started in late March. The turnaround is expected to run through the end of May and have an annualized volume impact of 8,000 bbl per day.
The interconnect pipeline continued to add value to the operation, enabling 2,000 bbl per day of export sales in the quarter and an additional 4,000 bbl per day of SSP production from imported bitumen, helping offset the volume impact of unplanned maintenance. This will also provide benefits during the current planned turnaround as well. Let's move on and talk about the downstream. In the first quarter, we refined an average of 417,000 bbl per day, which was down 16,000 bbl per day versus the fourth quarter, but up 18,000 bblper day versus the first quarter of 2022, reflecting a utilization of 96%. This strong start to the year positions us well to meet our full year guidance of 92% to 94% utilization.
The full year guidance accounts for a more typical level of planned turnaround activity this year, including a large planned turnaround at Strathcona, which started on April third and is expected to run through late May. This is expected to have an annualized impact of 6,000 bbl per day. It's also worth noting that given our high levels of utilization in 2022, especially the second half of the year, we have adjusted the stated capacity of our refining network up by 5,000 bbl per day or a little over 1%. This increase reflects the ongoing efforts at all of our refineries to continue to maximize the capabilities of these assets.
Petroleum product sales in the quarter were 455,000 bbl per day, which is down 32,000 bbl per day versus the fourth quarter of 2022 and up 8,000 bbl per day versus the first quarter of 2022. The decrease versus the fourth quarter is reflective of typical demand fluctuations. Demand for all products remains stable, with motor gasoline and diesel at around 90% to 95% of 2019 levels. Jet fuel demand continues to show a steady recovery. Imperial's jet sales have exceeded industry average demand recovery and are above 2019 levels. While we have seen some softening of downstream margins versus the latter part of 2022, first quarter margins remain strong, with diesel margins at seasonal norms and gasoline margins above seasonal norms, providing a very favorable market for our downstream business.
A final note on the downstream. In the quarter, we successfully added diesel-by-rail capability at our Dartmouth Terminal, which will allow us to back out diesel birch purchases and instead supply diesel from our own refineries. This is a good example of optimized logistics that will support increased refinery utilization and improve margin capture for our downstream business. That brings us to chemicals. Earnings in the first quarter were CAD 53 million, which is up CAD 12 million versus the fourth quarter of 2022 and down slightly from the CAD 56 million in the first quarter of 2022. This advantage business continues to deliver strong results despite being in a lower point in the business cycle, highlighting the value of having this business fully integrated with our Sarnia Refinery. Before I wrap up, I'll highlight one other item of note.
With respect to the Pathways Alliance, we, along with the other member companies, continue to prioritize our progress on this critical project. The project's proposed carbon capture and storage network has now moved to the design stage, which includes the awarding of an engineering contract to develop detailed plans for the carbon trunkline to connect more than 20 oil sands facilities to the proposed storage hub. The work being done in this stage will support a regulatory application expected to be filed later this year. In addition, two test wells have been drilled to support further evaluation of the geological characteristics of the storage formation, and the results have been positive. This progress is very encouraging and marks a major milestone in our efforts to progress our plan to help Canada meet its climate goals and ensure our country remains a preferred global supplier of responsibly produced oil.
We've also begun engagement with Indigenous communities and are committed to working together to bring economic reconciliation for long-term generational prosperity to these communities. It is certainly what they are looking for and what we're looking for as well for them. I'll wrap up by highlighting another very strong quarter. Our assets continue to perform well and at high levels of reliability, supporting a very strong start to the year. As we turn to the second quarter, we have a higher level of planned turnaround activity than we did in the second quarter of 2022. We will be focused on executing this work safely and on time and on budget. Through 2023, we will remain focused on our strategy of maximizing shareholder value by getting the most out of our existing asset base through optimization and debottlenecking opportunities and delivering superior shareholder value.
We will continue to focus on sustainability and make progress towards our carbon reduction goals in a thoughtful and pragmatic way. As we talked about at our Investor Day, we are approaching the energy transition and our role in it in a very thoughtful way that ensures we preserve the value of our existing business, while at the same time responding to the changing needs of our customers, communities, and society. We will continue to bring a disciplined focus to our capital investments as we execute key projects such as our Strathcona Renewable Diesel project and our Grand Rapids Phase 1. As always, we will look to efficiently return excess cash to our shareholders.
When I think about the quality of our assets, our focus on maximizing the benefits of our integrated nature and the competitive advantage we feel this brings, as well as our plans to deliver on select high-return growth opportunities, I have a tremendous amount of confidence in our ability to continue to drive superior shareholder value. As always, I'd like to thank you once again for your continued interest and support. Now we'll move to the Q&A session. I'll pass it back to Dave. Thank you. Thanks, Brad. We'll go to the Q&A now. I just remind everybody, please, if you could limit yourself to one question plus a follow-up, that ensures we can get in, everybody's questions. With that, operator, I'll turn it back to you to open up the Q&A line.
Operator (participant)
Thank you. If you would like to ask a question, please signal by pressing star one on your telephone keypad. If you are using a speakerphone, please make sure your mute function is turned off to allow your signal to reach our equipment. Again, please press star one to ask a question. Our first question comes from Dennis Fong with CIBC Capital Markets. Your line is open.
Dennis Fong (Equity Research Analyst)
Hi, good morning. Oh, hi. Hi, good morning, and thanks for taking my question. My first one here maybe just follows along some of your last comments there, Brad, on GHG emission focus as well as the Pathways initiative. When you think about spending on some of these projects that could capture carbon from your existing operations and given its proximity to obviously the potential Cold Lake region injection facility, how do you think about, we'll call it either triggers or key points which would allow you to feel more comfortable about starting to deploy incremental capital towards Imperial-specific capture projects? Then how do you think about the cadence of that? Obviously understanding that's more kind of a 2027 timeframe for those initiatives.
Brad Corson (Chairman, President, and CEO)
Yeah. Thanks for the question, Dennis. You're exactly right. There are some, if you will, financial advantages to the proximity of our Cold Lake operation and the planned sequestration hub also in the Cold Lake area. For that reason, we anticipate that our Cold Lake CCUS project, our very first capture project, will be in that Cold Lake area. And we think it could be one of the very first projects for the whole Pathways Alliance, again, because of that advantage proximity to the hub, which as a result does not require the completion of the trunk line. We're quite encouraged to advance that project. We are already progressing some preliminary design work to prepare for that.
Longer term, though, as we think about the massive investments that will be required for, you know, the complete Pathways project, building the major trunk line, ultimately connecting, you know, 20 different sites. You know, there still continues to be a lot of work to do to fully define all of the regulatory requirements, the fiscal support that's needed. We're making good progress on that, but we still have a ways to go both with the federal government, the provincial government. But we're still optimistic that that trunk line can be built and operational prior to 2030, as well as many projects connected to it. That obviously is a key enabler to helping the country meet its climate goals, carbon intensity goals.
You know, we're gonna continue that endeavor and continue those engagements and continue to progress the project. You know, as I mentioned, even with the trunk line, despite some of those uncertainties, we're already spending money on engineering, on field studies, engagements with indigenous communities because, you know, we're committed to seeing this project move forward and see it be a success.
Dennis Fong (Equity Research Analyst)
Great. Really appreciate that color there, Brad. My next question may be a little bit more directed towards Simon. It's really around Grand Rapids. Imperial has a lot of experience, frankly, in the region as well as the geology in the region as well. Can you highlight either some of the learnings or the work that has been done that helped increase the confidence in both the timing of the ramp-up for Grand Rapids as well as the ability to achieve the productive capacity of at least 15,000 bbl a day?
Brad Corson (Chairman, President, and CEO)
Yeah. Thanks for that question, Dennis. I will let Simon answer. First I'll just say, you know, we're super proud of the results we're delivering at Cold Lake and the projects, you know, that we're progressing like Grand Rapids, like the Leming redevelopment. You know, we just talked about carbon capture. All those projects continue to position our Cold Lake business as one of the most competitive assets in our portfolio, but also positions those assets for a lower carbon future. With those kind of broader comments, let me ask Simon to talk maybe more specifically about our confidence in delivering Grand Rapids.
Simon Younger (SVP of Upstream)
Yeah. No, no worries. Thanks. Thanks, Brad. Maybe just to quickly repeat sort of the strategic context for that investment at Cold Lake. As you've heard me say, and describe quite a bit, you know, our plan for Cold Lake is to really build and then maintain a plateau production in the 140 to 150 KBD range at Cold Lake. At the same time, maximizing value and cash flow of the asset.
Also lowering the greenhouse gas intensity of the asset. The Grand Rapids phase one project, as I outlined at the Investor Day, is a really, really key part of that overall puzzle. We also talked about the fact that we've captured some opportunity from a project execution standpoint to accelerate that and bring that forward about sort of six months versus the going in view on that. As to your specific question around our confidence, you know, I would answer that in two parts. I think from a subsurface standpoint, we have very, very high confidence. We understand this is a new part of the reservoir, a new reservoir horizon that we'll be developing.
We've drilled, you know, many, many hundreds if not thousands of wells through that Grand Rapids reservoir into the Clearwater where we're producing from today. We understand, I think the subsurface very, very well. It is new technology. This will be our first SAGD operation and we've also talked about obviously it's gonna be solvent-assisted SAGD and it's gonna be the first SA-SAGD operation in industry. We're putting a lot of effort into preparing for that operationally and understanding what we need to do to bring on our first SAGD operation in Imperial. We've put staff on that have SAGD operating experience, both technical and operating staff.
We've gathered the best expertise in industry to help us plan for and execute the completions on those wells. They're very different than what, you know, we are accustomed to and what we've developed over the past many decades. We've got, you know, the startup procedures are quite different. The way we bring that continuous process online is very different than the way we bring on CCS and LASER and the other technologies we've deployed. High confidence, but you know, high recognition as well that it's new technology for us. It'll be our first SAGD operation, and I think we've employed the right expertise and got the right operations readiness and startup plan to bring that online safely and with...
See early operational success. I hope that addresses the question.
Dennis Fong (Equity Research Analyst)
No, it definitely does. Really appreciate the color of both of you, I'll turn it back now. Thanks.
Simon Younger (SVP of Upstream)
Thanks, Denis.
Operator (participant)
Once again, if you would like to ask a question, please signal by pressing star one on your telephone keypad. Our next question comes from Menno Hulshof with TD Securities. Please go ahead.
Menno Hulshof (Managing Director of Institutional Equity Research)
Good morning, and thanks for taking my questions. I'll start with a question on your diesel-by-rail capability at Dartmouth. I'm assuming it's fairly immaterial since I was just going through the transcript, and I don't see any specific commentary from your investor day. Maybe you could just elaborate on volumes and whether there is more work to be done there?
Simon Younger (SVP of Upstream)
Yeah, I might ask Jon to comment on it. You know, it is a key logistics project for us that we feel quite excited about. Maybe Jon can share a few more details about it.
Jon Wetmore (VP of Downstream and Chemicals)
Sure, happy to. Yes, this is a new capability that we've installed at the Dartmouth terminal. You recall that's a former refining site that we had, we've been working over the last several years to try to fill out its capability as a terminal. It's always a bit challenging trying to turn an old refining site into a terminal requires a fair bit of persistence to convert the tankage over and the lines that run to and from the marine dock. We've been working our way through that for the last several years. One step we did before diesel was that we installed ethanol blending capability at the site, which is really important for our gasoline business in the area and for overall biofuel capability. The diesel piece, I won't comment exactly on the capacity that we have there. It's pretty nominal.
We're getting into the early stages of how big can it be. Moving rail cars from Ontario into Nova Scotia is a little bit challenging. There's not a lot of rail routes there. It really requires a good solid rail partner, and we're blessed to have a good partner there. We'll continue to try to build out our capability over time. It has a lot to do with the seasonality of diesel, including furnace fuel, which is a really big product that sells in the wintertime in Halifax and in the Nova Scotia area. We'll continue to build it out, but we're really pleased to have taken this first step.
Brad Corson (Chairman, President, and CEO)
Maybe I could just supplement Jon's comments just by highlighting, you know, from a geographic standpoint, during the winter months, when the seaway is closed, we don't have direct access to that region historically. You know, during other parts of the year, it's all marine access for us. Having this rail logistics allows us to serve that market directly during the winter months when the seaway is closed. Again, provides some really advantaged logistics for us.
Menno Hulshof (Managing Director of Institutional Equity Research)
Terrific. Thanks for that. I've just got a quick follow-up question on Dennis', Cold Lake CCS. The first piece, how much overlap and coordination is there on that project with Pathways Alliance, or should it be viewed as more of a standalone Imperial initiative? With the understanding that you're probably not in a position to talk about cost to date, like is there a cost share there? I suppose the, you know, the final piece of that would be when do you think you're gonna be in a position to provide more information on the bookends on cost on that specific project?
Brad Corson (Chairman, President, and CEO)
Yeah, thanks for that. I mean, you're exactly right that this is a project that we
Can advance independently of Pathways. All of the carbon capture projects as well as the trunk line are still being coordinated through Pathways. We don't need the trunk line. You know, we sit right on the pore space that's designated for the hub. You know, consequently, you know, we can advance it at an earlier schedule than many of the Pathways project. It's still integral to the whole objective of getting the industry to net-zero by 2050 and the interim goals we've set out for 2030 and 2040.
It's also important to note that, you know, as we look at decarbonizing Cold Lake, you know, it's a multifaceted approach, where we're continuing to implement new solvent technologies like we just discussed with Grand Rapids, SA-SAGD, significantly lower greenhouse gas intensity. Again, you know, it's all of those initiatives together that allow us to continue to reduce our greenhouse gas intensity. In terms of the cost, you know, we're not ready to share those details yet. It's worth noting that as we look at the economics of the project, you know, we would expect it to compete with other projects in our portfolio. That's key to all of our capital investment philosophy, the discipline we're bringing.
I'll maybe just leave it there.
Menno Hulshof (Managing Director of Institutional Equity Research)
just to clarify, you typically talk about sort of a 15%+ return to compete?
Brad Corson (Chairman, President, and CEO)
Yeah, it double-digit returns is certainly what we're looking for and expecting.
Menno Hulshof (Managing Director of Institutional Equity Research)
Terrific. Thanks, Brad.
Operator (participant)
Our next question comes from the line of Neil Mehta with Goldman Sachs. Please go ahead.
Neil Mehta (Managing Director)
Good morning, team. My first question is just around return of capital. Remind us again when you get to that inflection point on the NCIB and you can re-up that. Also talk about the SIB, and I think you telegraphed well at the analyst day that, you know, there was a heavy Q2 turnaround, so maybe it was a likely back half event. To the extent that is the case, do you expect it to just be a larger cumulative dollar amount? Thank you.
Brad Corson (Chairman, President, and CEO)
Yeah. Thanks for that question, Neil. You know, both Dan and I love talking about returning cash to our shareholders and Dan is kind of chomping at the bit to share his perspectives on that because it is core to our company and our strategy. You know, and what we've kind of revealed today with the dividend increase is just one component of that as we look to the future.
Dan Lyons (SVP of Finance and Administration)
Hey, thanks, Brad. Thanks, Neil, for the question. Look, we have renewed for quite a number of years now our NCIB at the max 5% level that we can, very late June, so effectively, call it July 1. That's clearly our plan going forward. Our base philosophy is completely unchanged. We are committed, as we always have been, to return surplus cash to shareholders. We'll continue to do that. Look, we're very optimistic about how this year is starting to unfold and the commodity price environment and our operational performance. To the extent that all comes to pass, we'll be returning significant cash to shareholders over the back part of the year.
Obviously, we have to see what the market gives us. We are absolutely philosophically committed to returning that surplus cash as we have been for some time. You know, as we've demonstrated, you know, last year was, you know, a great example.
Neil Mehta (Managing Director)
Yeah. You've been very consistent on this. The follow-up is on the quarter, it was obviously an earnings beat versus a consensus, but it was more in line from a cash flow perspective. It looks like there was this other delta on the cash flow statement of. I'm guessing a bunch of cats and dogs. Maybe, Dan, you can walk through what some of those items were?
Dan Lyons (SVP of Finance and Administration)
Yeah. I think that's probably not a bad description. A bunch of cats and dogs. I think the line is labeled, I think, all other items net, if I'm not mistaken. Yeah, there's a number of things in there. Obviously, there's stuff that's not working capital, and then aren't in other lines on the cash flow, and they tend to be long-term sort of, you know, payable/receivable type stuff or liabilities. There's a number of things in there, Neil. I mean, it's longer-term tax payments, you know, pension adjustments, things of this sort. That line kinda bounces around. I wouldn't read too much into it.
It was a little higher than usual this past quarter which you're right, did impact ultimately, our cash flow number after working capital that we talked about.
Neil Mehta (Managing Director)
Okay. That's really clear. Thanks, thanks guys.
Operator (participant)
This does conclude today's question and answer session. At this time, I would like to turn the conference back to Dave Hughes for any additional or closing remarks.
Dave Hughes (VP of Investor Relations)
Thanks. Yeah, I'd just like to thank everybody for joining us this morning. That brings our first quarter earnings call to an end. You know, if anybody has any further questions, as always, please feel free to contact anybody here on the IR team. Thank you.
Operator (participant)
This concludes today's call. Thank you for your participation, and you may now disconnect.