Operator (participant)

Good morning, ladies and gentlemen, and welcome to the Pan American Silver's fourth quarter 2023 unaudited results conference call and webcast. At this time, all lines are in a listen-only mode. Following the presentation, we will conduct a question and answer session. If at any time during this call you require immediate assistance, please press star zero for the operator. This call is being recorded on Thursday, February 22, 2024. I would now like to turn the conference over to Siren. Thank you. Please go ahead.

Siren Fisekci (VP of Investor Relations & Corporate Communications)

Thank you for joining us today for Pan American Silver's Q4 and full year 2023 conference call. This call includes forward-looking statements and information and makes reference to non-GAAP measures. Please see the cautionary statements in our MD&A, news release, and presentation slides for our Q4 2023 audited results, all of which are available on our website. I'll now turn the call over to Michael Steinmann, Pan American's President and CEO.

Michael Steinmann (President and CEO)

Thanks, Siren, and thank you everyone for joining our call today. The past year was a dynamic period of growth and change for Pan American. We added four new mines in two new jurisdictions. We streamlined our portfolio through the sale of non-core assets, and we announced the preliminary economic assessment for the La Colorada Skarn. With the integration of the assets we acquired from Yamana now complete, we continue our focus on improving margins through safe, cost-efficient operations, harvesting synergies, and further portfolio optimization. In 2023, the nine-month contribution of the assets we acquired drove an 11% increase in silver production and a 60% increase in gold production over 2022, and resulted in record revenue for both Q4 and for the full year.

Operating cash flow for Q4 was $167.4 million, net of $32.4 million in taxes paid and inclusive of $56.1 million of cash from working capital. We recorded a net loss of $0.19 per share in Q4, driven by three non-cash charges. The first relates to the final purchase price allocation for the acquired Yamana assets. Pan American finalized the purchase price allocation or PPA asset values for the Yamana Gold acquisition in Q4 2023, resulting in a $16.5 million improvement to previously reported Q2 2023 and Q3 2023. IFRS accounting standard reporting rules for business acquisitions require that all accounting impacts to earnings from the finalization of PPA asset values be retrospectively recast to prior quarters.

As a result, the additional $16.5 million, or $0.05 per share in earnings for the year, related to revised depreciation charges for the final PPA asset values, must be retroactively applied to Q2 and Q3 rather than applied to Q4 2023 earnings. There's no impact on full year 2023 earnings. The second factor impacting Q4 earnings was a $36.2 million impairment charge for the crushing and agglomeration plant of Shahuindo. The plant was constructed prior to Pan American's purchase of the mine in 2019, and we have never operated it. The third factor was a $13.8 million closure and decommissioning expense, largely due to the revised reclamation estimate at Alamo Dorado in order to withstand high intensity rainfall events through the installation of impermeable barriers for the waste dump and enhanced site drainage systems.

The closure of the tailings storage facility at Alamo Dorado has been successfully completed. The impact of the impairment and the closure of decommissioning liability was removed from adjusted earnings. Production in 2023 was pre-released on January 17, 2024, and largely in line with our expectations. Silver was slightly below our guidance range at 20.4 million ounces, while gold was within guidance range at 882.9 thousand ounces. The shortfall in silver production was largely due to the ventilation constraints at La Colorada, together with the temporary suspension of operations in October 2023. We are looking forward to the completion of the new ventilation system mid-2024 in order to access the higher grade mine zones to the northeast.

Excavation of the new 5.5-meter concrete-lined ventilation shaft was completed, the final depth of 581 meters on schedule in December 2023, and the remaining key pieces of infrastructure, two large exhaust fans to draw the hot, humid air out of the mine, are expected to be installed by the end of Q2. While the first two quarters of this year will continue to reflect the challenging operation conditions, we expect significant improvement in the second half of the year, with high throughput and lower costs thereafter. The production shortfall at La Colorada and higher mining costs at both La Colorada and Huarón resulted in cash costs and all-in sustaining costs for our silver segment operations coming in above our guidance range for 2023.

The increase were partially offset by lower costs at Cerro Moro from higher-than-expected gold by-product credits, and at San Vicente from lower costs and higher silver production. Gold production and gold segment, all-in sustaining costs were within our guidance range for 2023. Our cash costs for the gold segment came in above the guidance range, largely due to the lower gold production at El Peñon. As disclosed in the third quarter of 2023, gold grades mined at El Peñon were lower than we had anticipated in certain high-grade sections of the mine. We are increasing the drill density at El Peñon after drilling fell behind late in 2022 and early 2023 due to a change of a contract by Yamana. We expect to provide more information on El Peñon with the mid-year reserve update. We released our guidance for 2024 on January 17.

In 2024, we expect to produce between 21 and 23 million ounces of silver and between 880,000 and 1 million ounces of gold. All-in sustaining costs for the silver segment are expected to be between $1,650 and $1,850 per ounce, and between $1,475 and $1,575 per ounce for the gold segment. At Jacobina, we are expecting processing rates of approximately 8,500 tons per day, with stable gold recovery rates around 96%. The new carbon-in-pulp tanks were mechanically completed, and the new concentrate leach system began operating late 2023. We are undertaking a comprehensive optimization study of Jacobina to evaluate alternative mining methods and enhancements to the processing facility to optimize the long-term throughput and economics of that mine.

At El Peñon, we are assuming that grades and throughput rates will be similar to what we realized in the second half of 2023, pending the new infill drilling results. We expect to complete mining at Dolores by Q3 2024, with residual leaching to follow for several years thereafter. Silver production is expected to be largely back-end loaded from improved ventilation conditions at La Colorada, and an expected improvement in grades at Cerro Moro, as we access and bring into production the Naty satellite deposit, which is located 25 km from the plant site. Costs will reflect that production profile being heavily weighted to the first two quarters and significantly decreasing in the back half of 2024, as shown in the quarterly operating outlook provided with our Q4 disclosure.

We also expect to spend between $295 million-$310 million on sustaining capital and another $80 million-$85 million on growth projects, primarily for advancing the La Colorada Skarn, completing the tailing filtration project at Huarón, finishing the paste backfill facility at Bell Creek, and completing some plant upgrade projects initiated by Yamana Jacobina. Sustaining capital is largely to expand tailings dams and leach pads, to extend underground mine ventilation systems and open pit mine waste dumps for exploration, to replace and overhaul mobile equipment, and for certain operating lease payments. Turning now to our strategic initiatives. In January, we filed an updated technical report for our La Colorada property, which included the preliminary economic assessment for the La Colorada Skarn project. Our objective is to provide investors with exposure to silver, and the skarn provides that exposure in scale.

Annual silver production is estimated to average 17.2 million ounces during the first 10 years. It is also expected to produce 427,000 tons of zinc annually during that period. Given the volume of base metals in the deposit, we are assessing interest from base metal producers and other capable parties to explore long-term partnerships to develop this polymetallic project. We are focused on the large amount of anticipated silver production from this deposit. Turning to Escobal, a new government took office in Guatemala in January 2024, and we had our first meeting with the new Ministry of Energy and Mines, or MEM, on February 7, 2024.

The meeting for the ILO 169 consultation was held yesterday, on February 21st, with the newly appointed Vice Minister of Energy and Mines and Xinka representatives, during which a presentation on the observations of the Xinka's appointed consultants was communicated. We look forward to receiving the reports and working with the MEM to ensure accurate information is communicated to the Xinka participating in the consultation process. As usual, we are not providing a timeframe for completion of the consultation or a potential restart of the mine. But Pan American's financial position strengthened over 2023. At year-end, our cash and short-term investments reached a record of $440.9 million, and we had the full $750 million available under our undrawn revolving sustainability-linked credit facility.

Total debt of $801.6 million was mostly related to two senior notes we acquired through the Yamana acquisition. We expect cash flow generation to improve in 2024 as we realize the contribution of a full year of the four new mines and cost savings through synergies and lower care and maintenance costs. However, we expect cash flow to be back-end weighted, given the production and associated cost profile I previously outlined. As well, we expect approximately half of the estimated $95 million-$100 million of tax payments will be paid in the first quarter of 2024. Yesterday, we announced our intention to begin buying back some of our shares. We have been opportunistic in the past when making acquisitions.

With the current market dislocation between our equity and asset valuations, we believe that share buyback is a prudent and accretive use of capital, and we will apply the same opportunistic approach in repurchasing Pan American shares. We also announced yesterday a cash dividend of $0.10 per common share, in line with our policy. In 2023, dividends paid totaled $130.4 million. Before opening up for questions, I would like to welcome Scott Campbell, who is coming back to join the company in April. Scott will help oversee the company's operations and lead the corporate projects group, reporting to our Chief Operating Officer, Steve Busby. His senior operations expertise will be very valuable as we work to optimize our portfolio and advance our growth projects.

On behalf of the entire team at Pan American, I'd also like to thank George Greer for his contributions to the company over the past 17 years. George, we wish you all the best for your retirement coming up later in this year. Together with the other members of our management team, we would now be happy to take your questions.

Operator (participant)

Thank you. Ladies and gentlemen, we will now begin the question and answer session. Should you have a question, please press the star followed by the one on your telephone keypad. You will hear a three-tone prompt acknowledging your request. Questions will be taken in the order received, and should you wish to cancel your request, please press the star followed by the two. If you're using a speakerphone, please leave the handset before pressing any keys. Once again, that is star and one to ask a question. Your first question comes from the line of Cosmos Chiu from CIBC. Please proceed.

Cosmos Chiu (Executive Director of Institutional Equity Research)

Thanks, Michael and team, and thanks, George, as well. Happy retirement. Maybe my first question is on your quarterly guidance. Thanks, Michael, for providing us with quarterly guidance. As we can see, it improves quarter-over-quarter. My question is, you know, I understand the second half is going to be better than first half, but I do see a big drop or improvement in terms of silver costs in Q4. Just wondering how you're going to get there. I think it's a fairly big drop, even from Q3 into Q4, in terms of all-in sustaining costs for silver.

Michael Steinmann (President and CEO)

Yeah, Cosmos, thanks. And, yeah, it's a big, big drop, of course, heavily impacted by La Colorada's changes to, you know, back to bigger production, more ounces after the ventilation circuit is back working. Of course, that was the reason for the high cost last quarter. So that big impact will be reversed, and that's why it's so big. But I'll hand it over to Steve to give us a bit more color on the cost side.

Steve Busby (COO)

Yeah, Cosmos, I think I would add the other thing to look at is on Cerro Moro. We have a back-end-loaded gold production in Q4. It's quite high, and that's a byproduct credit there. So that's really driving a big part of the Q4 change as well.

Cosmos Chiu (Executive Director of Institutional Equity Research)

Great. Thank you. And then, Michael, as you mentioned, you know, there were a number of one-time items in your earnings in Q4, including, Shahuindo, the crushing agglomeration plant, $36.2 million write-down. I'm just wondering, was that something that you could have sold? Did you know no one want it, or did you try to sell it?

Michael Steinmann (President and CEO)

Again, I will start, and then Steve will have more color to this. This plant has been built by Tahoe before we actually purchased the company. We had obviously looked at that plant during operation. We opted for a solution of blending between coarse and fine-grained material as a way more economic solution than using the plant. So the plant is now, let me just think, probably seven years old, eight years old. We have never used it, and I think where we stand right now and with the blending solutions that we found, we come to the conclusion that it's that we will not turn it on looking forward. But Steve maybe will give us more details.

Steve Busby (COO)

Yeah, yeah, Cosmos, Michael's precisely right. And really the issue was, we were trying to decide, we were trying to look at all the alternatives of treating the high clay ores of Shahuindo and looking at the blends, looking at the rock availability. And so we kind of kept that plant in check just in case we didn't have enough rock. That may have been the alternative to go to. Now, we're more confident with our blending capabilities. We understand the percolation characteristics on the heap, so we've made the decision we didn't need that plant anymore.

Cosmos Chiu (Executive Director of Institutional Equity Research)

Yeah. Okay. I'm, I'm just wondering, I know I used to cover Tahoe as well. I know it was no longer needed. I'm just wondering if it's something that you can actually just monetize, you know, in terms of-

Steve Busby (COO)

Yeah.

Cosmos Chiu (Executive Director of Institutional Equity Research)

Parts of what, what want it.

Steve Busby (COO)

Yeah, if I could add, Cosmos, we do plan to market that equipment. There's some of it we want to keep for other developments we have internally, but there's, you know, large pieces of crushing and agglomeration equipment that we will try to market over the next year or so.

Cosmos Chiu (Executive Director of Institutional Equity Research)

Mm-hmm. And then maybe one last question on Dolores. As you mentioned, you know, mining will likely come to an end soon. This is gonna be a residual leach, sort of operation. Can you maybe talk about the, you know, ongoing, what would you call it, maintenance costs or closure costs, that you will need to spend? And then as you enter the closure period, you know, what would you need to do in terms of ensuring the structural integrity of the leach pads and making sure that, you know, no accidents kind of happen?

Steve Busby (COO)

Yeah, Cosmos, that's a great question, and I, I can tell you we're focused on trying to structure the operation when it's in this residual leaching as efficiently as we can. We will absolutely maintain all of the monitoring systems, all of the geotechnical monitoring, elaborate monitoring that we have on the heaps and the dumps during the during the residual leaching. Those aren't expensive items instruments to run. The real cost is gonna be on just circulating solutions through the heap. And, and then the big question is gonna be cyanide concentration for the solubility of the silver. The gold's pretty well solubilized, so it comes out as you, as you rinse, but the silver, you've got to, you've got to keep the cyanide concentrations at a, at a critical level.

That's really going to be what we monitor, what we operate. We'll do it as streamlined as we can. We've made some estimates in this guidance, particularly in Q4, where it's all residual leaching at that time. But until we get there and we actually structure and see how it goes, it may change from that point.

Cosmos Chiu (Executive Director of Institutional Equity Research)

Great. Thanks, Michael and Steve. Those are the questions I have. Thanks once again.

Steve Busby (COO)

Thanks, Cosmos.

Operator (participant)

Thank you. Your next question comes from the line of John Tumazos. From John Tumazos Very Independent Research, please proceed.

John Tumazos (Founder, Owner, and CEO)

Thank you for all the explanations. Michael, the La Colorada Skarn PEA with $2.8 billion of capital, if you go to 50,000 tons a day, and $2.6 billion if you stop at 30,000 tons a day, is a big future item. The share buyback in potentially in 2024, maybe you have a lot of time to earn money, and so three, four, five years from now, you're heavy into the construction of La Colorada Skarn. Should we take this essentially as your expression of confidence that you're going to complete a JV with a base metal partner, and that your share of the capital might be less than half of the PEA number, or the subsequent studies are going to reduce that, CapEx number and reduce your capital call?

Michael Steinmann (President and CEO)

Yes, thanks for the question. Absolutely. I think I made it very clear from the first call on that the focus now is just to find the right partner for that project. As you can imagine, for such a large, I would call it the silver zinc deposit, perhaps the largest in the world, there is quite some interest from the base metal side, just because of the long life, the underground nature, and the big, big picks in production. So yes, that's absolutely my confidence to work on that, on such kind of an agreement that obviously will reduce our share on the capital, but always stay focused on that very large silver production.

As you remember, there's about a 50,000 ton, about 17 million ounces for the first 10 years average silver production, which really will be our focus in any kind of agreement that that hopefully we come to.

John Tumazos (Founder, Owner, and CEO)

Should we also take this perhaps as an expectation that the silver or the zinc prices might rebound to help your economics, or that Escobal restarts in Guatemala?

Michael Steinmann (President and CEO)

Well, you know, I don't have control, obviously, where the silver and zinc prices are going. I think, you know, all the listeners have their view on that. I have my view, and you know, it's... But I think once we see interest rates move the other direction, we will see a strong rebound on precious metals for sure. You know, I don't know when that will happen this year. There are the different views out there. But just to remind everyone, like last year, you know, we repaid about $400 million debt, and we paid about a hundred and over $130 million in dividends, while we ended the year with a record cash and short-term investment balance of over $440 million.

So those are very important numbers here, and obviously one of the reasons why we decided at this point in the market, where we believe there's a lot of values, you know, La Colorada is one of them, that are not fully included in our share price, that it's a good time and an accretive time to buy back some of our shares. Of course, we're looking forward, as you saw there in the quarterly guidance, to you know, a stronger and strong 2024, especially the second half when costs come off, as we explained with Cosmos earlier in the call. So all that combination, and obviously last but not least, we will continue to work on divestments.

We have been, I think, very successful last year on the divestments, and we'll continue to work on that. So all that together, and add the fact that we probably created last year dividends, sorry, royalties out of those divestments that we did, which, you know, I would probably value somewhere in the $150 million-$200 million range at today's prices. So another kind of big value bucket that we have under our control. So I think it's a very prudent approach for us to obviously pay the dividend and come out with that share buyback at this time.

John Tumazos (Founder, Owner, and CEO)

Thank you.

Operator (participant)

Thank you. And your next question-

Michael Steinmann (President and CEO)

Thank you.

Operator (participant)

Thank you, and your next question comes from the line of Craig Hutchison from TD. Please proceed.

Craig Hutchison (Director and Base Metals Analyst)

Hi, good morning, guys. Just on La Colorada, can you give us a sense of what the grades will be in the second half of this year? Obviously, there's gonna be a big inflection point. And then how durable are those higher grades kind of going forward? Is it more of a year or two, or a very short period of time?

Steve Busby (COO)

Yeah, good morning, Craig. This is Steve. Fortunately, we are seeing the grades at La Colorada that we expect. During Q4, we were about 288 grams silver. That's close to the reserve grade. It's what we expect going into next year. It's really a matter of tonnage. We got to get our tonnage up, and the tonnage that we got to increase is in the higher grade portion of the Candelaria Deep Zone. So that's what this ventilation shaft and the vent fans will give us access to, to get that tonnage up. But we're pretty happy with the grades where they are. We're pretty confident those grades are gonna sustain over a long period of time. We see potential to continue to add as we drill out more at La Colorada.

Michael Steinmann (President and CEO)

Yeah, we have at the moment, probably about eight or nine years of proven probable reserves, this kind of throughput. So, yes, they can sustain a long time. Obviously, there will be advances on the skarn during that time period. But, yeah, I think there's, you know, a long reserve in the veins. Later on, those veins will join up with the skarn deeper down.

Craig Hutchison (Director and Base Metals Analyst)

Okay, so the plan from throughput perspective is around 2,000 tons a day. Is that we should be modeling next year?

Steve Busby (COO)

Yeah, once we get the ventilation up and running, that's kind of our target, is get above the 2,000 tons a day. So once the ventilation fans are running, we do have some development acceleration that we have to do in that Candelaria East Zone. So, you know, you'll see it start to ramp up from the current kind of 1,300 ton a day range. It'll take us a couple months, two, three months to ramp up from there to the 2,000 tons a day once the vent fan is running.

Craig Hutchison (Director and Base Metals Analyst)

Okay, great. And just in terms of, you know, the, I guess, the sort of free cash flow you guys are going to generate here, do you guys anticipate being free cash flow positive in the first half of this year, given the, you know, the higher taxes you have to pay that are usually weighted to the first half? Or is it sort of a, you know, you anticipate free cash flow is sort of more of a second-half story?

Ignacio Couturier (CFO)

Hi, Craig, this is Ignacio. That's, that's a great question, and just following up on what Steve just said, our forecast is for it to be back-end loaded. And as usual, yeah, there is heavy taxes being paid in the first half of the year, plus some extra capital. So we will be able to pay our dividends in the first half of the year without drawing from our credit facility, but the bulk of the free cash flow does come in the second half of the year.

Craig Hutchison (Director and Base Metals Analyst)

Okay, great. Thanks, guys.

Michael Steinmann (President and CEO)

Thank you.

Operator (participant)

Thank you. Once again, should you have a question, please press the star followed by the one on your telephone keypad. Your next question comes from the line of Don DeMarco from National Bank Financial. Please go ahead.

Don DeMarco (Equity Research Analyst)

Thank you, operator, and good morning, Michael and team. So first question-

Michael Steinmann (President and CEO)

Hi.

Don DeMarco (Equity Research Analyst)

You had some strong cost performance in Q4 at a couple of your flagship mines, both quarter-over-quarter and relative to 2024 guidance. So I'm referring to El Peñon Q4 AISC, $1,178, midpoint in guidance is $1,250. Jacobina, $1,022, and the midpoint of the 2024 guidance is $1,300. So in light of this Q4, are you feeling more confident, confident on guidance at these mines and, and maybe even tracking the lower end of the ranges?

Steve Busby (COO)

Thanks, Don. I mean, we feel very confident with the guidance we put out for those mines, which does show a modest inflation rate that we'll absorb, like 5%-7%. We've got some wage adjustments that we believe need to be made in Brazil and some added payroll costs that we have to look at there. So I think what we forecasted out, we're quite confident of. There is some potential upside to those things, but it's really driven on productivities. That's really where we're focusing our efforts there. But I think from a cost side, we're pretty confident in our guidance today.

Michael Steinmann (President and CEO)

Just Don, to add here, don't forget that big impacts to our costs is the more than one product at the mine is the by-product credit from our by-product metal, so that metal price has a big impact. And last but not least, currencies. So foreign currencies can have a big impact. You saw that in Mexico, where obviously with the strong peso that was kind of a headwind on the cost side for us. You know, it can be very strong tailwinds as well. So those are the things that we have no control over, but yeah, we are very confident with our guidance over the items that we're controlling.

Don DeMarco (Equity Research Analyst)

Okay, thank you. So just shifting to Escobal then, the ILO consultation meetings are resumed, and a meeting was held yesterday. It's good to hear that the new minister was present. Is there any feedback from this initial meeting or insight into the next meeting or on any next steps?

Michael Steinmann (President and CEO)

Yeah, it was the vice minister that was present yesterday, and it was the first meeting after, you know, a few weeks of transition with the new government. The government that has indicated to us to, you know, to be committed to the ILO 169 process. Of course, there was some time needed to transition and integrate the new government. That's absolutely normal. And yeah, and you correct me, the last meeting was yesterday. I think there are some working meetings planned here for the future, but for us, really looking forward to, you know, continue the process with all the parties involved. And there will be for sure, I guess, from time to time, updates on the MEM website for the consultation.

So, just have a look in there for updates from the MEM directly.

Don DeMarco (Equity Research Analyst)

Okay, fair enough. And final question then, with producer valuations, where they are in the market right now, is call it depressed, are your plans for asset divestment maybe deprioritized until valuations recover?

Michael Steinmann (President and CEO)

Not really. I mean, it depends, obviously, on the valuation and prices we got. I think we, you know, have been very successful divesting assets last year at very, very successful prices and royalties, I think. And, you know, most of these projects are especially like last year when you looked at MARA, these are long-term projects, big buyers, big companies, they look at very, very long or much longer timeframe than just current metal prices. So I don't think so that it really impacts a lot their valuation when they look at assets, and I see that continuing into this year. So all depends on the prices, on the valuations we get from potential buyers this year.

But, now I'm very confident that we can continue that route down and divest some assets this year.

Don DeMarco (Equity Research Analyst)

Okay. And, just as a follow-up to that, I think La Arena II Sulfide project has been mentioned as a candidate, others certainly are. Can you share any color on, on what might be the sort of top candidate for divestment consideration?

Michael Steinmann (President and CEO)

Look, I mean, I think we talked about La Arena II. Obviously, La Arena, our oxide mine, is producing. It's a very strong producer for us. I think everybody knows we, we extended actually that oxide life from probably when we purchased our, like, 2021 to 2026. So very successful exploration program on that asset as well. The deep sulfides or deeper sulfides, the copper deposit, obviously in a like a similar kind of bucket for us than MARA was. You know, we are—it's, it's, it's not our commodity really to build out copper deposits. But the rest of the divestments, look, we are very active working on it. We are very active working on the search for a partner for La Colorada, and I would like to leave it with that, with that at the moment.

Obviously, we'll inform the market as soon as anything is ready to share.

Don DeMarco (Equity Research Analyst)

Okay. Thank you, Michael, and good luck with the rest of Q1.

Michael Steinmann (President and CEO)

Thank you.

Operator (participant)

Thank you. There are no further questions at this time. Mr. Steinmann, please proceed.

Michael Steinmann (President and CEO)

Yeah, thanks, operator, and thanks, everyone, for being on the call. It has been a very dynamic year last year, as we indicated, with the close of the transaction, integration of the asset, selling multiple assets, retaining not only good cash values for that, but also strong royalties. And last but not least, coming out and publishing that really exciting PEA on La Colorada Skarn. So very active year. A lot of cash movements in our portfolio over the year. As I mentioned, strong repayment of debt. We don't have short-term debt anymore.

Very strong cash balance, and now be in the fortunate situation to be able to use that cash for further growth and keep investing in our projects, not only sustaining capital, but also project capital on, on something like La Colorada to advance that project, but still be obviously in the position to maintain our dividend and to buy back some of our shares at this, you know, what I would say, think, very low valuation. So really looking forward to 2024 and looking forward to keep you updated in May of our Q1 results. Until then, thank you very much.

Operator (participant)