Operator (participant)
Good afternoon. Thank you for standing by, and welcome to the Wolfspeed, Inc. Q2 fiscal year 2023 earnings call. Currently, all participants are in listen mode only. All lines have been placed on mute to prevent any background noise. After the speakers' remarks, there will be a question-and-answer session. If you'd like to ask a question during this time, simply press star followed by the 1 on your telephone keypad. If you'd like to withdraw your question, please press star followed by the 2. We ask that you limit yourself to asking one question and one follow-up. Thank you. Please note today's call is being recorded. I would now like to hand the conference over to our first speaker today, Tyler Gronbach, Vice President of Investor Relations. Please go ahead.
Tyler Gronbach (VP of Investor Relations)
Thank you, good afternoon, everyone. Welcome to Wolfspeed's Q2 fiscal 2023 conference call. Today, Wolfspeed CEO Gregg Lowe and Wolfspeed CFO Neill Reynolds will report on the results for the Q2 of fiscal year 2023. Please note that we will be presenting non-GAAP financial results during today's call, which is consistent with how management measures Wolfspeed's results internally. Non-GAAP results are not in accordance with GAAP and may not be comparable to non-GAAP information provided by other companies. Non-GAAP information should be considered a supplement to, and not a substitute for, financial statements prepared in accordance with GAAP. A reconciliation to the most directly comparable GAAP measures is in our press release and posted in the investor relations section of our website, along with a historical summary of other key metrics.
Today's discussion includes forward-looking statements about our business outlook, and we may make other forward-looking statements during the call. Such forward-looking statements are subject to numerous risks and uncertainties. Our press release today and the SEC filings noted in the release mention important factors that could cause actual results to differ materially, including risks related to the impact of the COVID-19 pandemic. During the Q&A session, we would ask that you limit yourself to one question and one follow-up so that we can accommodate as many questions as possible during today's call. If you have any additional questions, please feel free to contact us after the call. Now I'd like to turn the call over to Gregg.
Gregg Lowe (President and CEO)
Thanks, Tyler, and good afternoon, everyone. Before we get into the results of the quarter, I'd like to take a moment to remember our late founder and CTO, John Palmour. We had a celebration of life last weekend, during which we announced that we would dedicate our Siler City manufacturing facility in his memory, naming it the John Palmour Manufacturing Center for Silicon Carbide. All of us knew John through his nickname JP, and so the nickname for our facility will be The JP. He worked for over 35 years to advance and promote silicon carbide, and largely as a result of his efforts, the world is recognizing its potential. We believe that silicon carbide is on the cusp of mass adoption and that our long-term outlook remains on track.
Electric vehicles were the bright spot in the auto market in 2022, despite many headlines that auto sales have slowed. Global EV sales grew more than 65% year-over-year and represented 10% of all vehicles sold in the calendar year. We've seen this overwhelming demand play out at Wolfspeed as our recent partnerships with industry leaders such as Jaguar, Land Rover, and Mercedes-Benz point to the strength in the demand for EVs and our ability to take share in this space. We remain confident in the industry's strong long-term fundamentals and believe Wolfspeed is best positioned to capitalize on the rapidly growing demand. Our $1.5 billion of design-ins in the quarter point to continued robust demand for our power devices. To date, 46% of our design-ins have converted to design wins, representing more than 1,800 projects.
We are coming off multiple quarters of record design-ins, with a total of more than $16 billion of design-ins over the last three years. Of course, there will be some variability in our design-in numbers from quarter-to-quarter based on timing of new agreements and decisions by customers. We anticipate that as our manufacturing capacities expand with new facilities, we will continue winning in the device marketplace. Third, we continue our market leadership position in the materials business, the aspect of our business with the highest barriers to entry. We recently announced an expanded agreement with another leading supplier of silicon carbide materials, which illustrates the intense demand for silicon carbide. From where we sit, the industry remains supply constrained, and this will continue to be the case for the foreseeable future.
It is clear to us that the opportunity in silicon carbide technology is generational, given the pace of adoption we've experienced over the last few quarters. At our Investor Day, I remarked that I have not seen growth like this in my 30 years in semis, and that view has not changed. While customer interest remains strong across both materials and power devices, as we discussed previously, silicon carbide production and manufacturing can present challenges along the way. Our Durham crystal growth operation, which is the world's largest silicon carbide materials factory, currently supplies our entire device business and a significant share of the merchant market. However, that is still not enough to support the massive accelerating demand for silicon carbide. With the intense growth in demand for both captive and merchant wafers comes the challenges of growing our materials output as well.
We've continued to refine our crystal growth operations and had a recent breakthrough in our ability to grow taller boules. The initial challenges in managing these taller boules in our back-end processing have been resolved, resulting in significantly higher yields. It will take a few months before we return to normal production schedule for these materials as the improved product makes its way through the WIP. We are encouraged by the results that we've been able to achieve with these taller boules. Long-term, the John Palmour Manufacturing Center for Silicon Carbidey is critical to addressing the supply-demand disconnect. It will support our expanding device footprint at both Mohawk Valley and a soon-to-be-announced fab, as well as the ever-growing demand for merchant wafers. Construction of the JP is progressing well since groundbreaking in September, and things remain on track as we updated during our last Investor Day.
Regarding the progress at Mohawk Valley, we previously said that we anticipate revenue flowing through the fab in the second half of fiscal 2023. We remain on a trajectory to meet that target, that will largely depend on our ability to complete qualifications and ramp the supply of 200 millimeter wafers, which we believe we will achieve. We continue to successfully run test lots through Mohawk Valley, which gives us confidence that we're ready to begin scaling production and recognizing revenue from Mohawk Valley in the Q4 of this fiscal year. As a reminder, Mohawk Valley is a first-of-its-kind fab, purpose-built to produce next-generation silicon carbide power devices. We're in the final stages prior to scaling production in Mohawk Valley, one of my top priorities over the next few quarters is to ensure that we execute on that plan.
We have a strong team and clear strategy in place, and are confident in our ability to deliver strong results for our shareholders. While there may be some variability in our short-term results as we qualify and scale the world's first 200 millimeter silicon carbide device fab, while also scaling the first production of 200 millimeter silicon carbide wafers, we are well-positioned to capitalize on the explosive growth that we see through the end of this decade. Now I'd like to turn the call over to Neill to discuss our quarterly results. Neill?
Neill Reynolds (CFO)
Thank you, Gregg. Good afternoon, everyone. During the fiscal Q2 of 2023, we generated revenue of $216 million at the low end of our guidance range, which represents a 10% sequential decline when compared to the $241.3 million in the fiscal Q1 of 2023, and growth of approximately 25% year-over-year. As Gregg mentioned, we continue to see strong demand for our silicon carbide solutions. However, the supply chain issues we discussed last quarter caused variability in our quarterly revenue in the second quarter. With equipment spare parts shortages limiting our Durham fab output, while at the same time, we continue to work through the ramp of our taller 150 millimeter boules.
I am pleased to report that we have made significant progress on both issues, and we are currently processing these improvements through our production cycle. In terms of our power devices, which grew approximately 48% in the quarter versus last year, we saw strong performance ahead of our expectations, mostly resolving the Durham spare parts supply chain issue we discussed last quarter. From a power device supply perspective, we now believe that we have achieved full capacity in our Durham wafer fab and virtually all future top-line growth for power devices will come directly from the Mohawk Valley fab. From a materials perspective, we made very significant progress on improving yields on our taller 150 millimeter boules. These yields are now comparable to our historical yields on shorter boules.
Back-end wafer processing cycle times recovered later in the quarter than anticipated, resulting in lower than expected Q2 revenues for our materials products. We believe this past quarter represents the bottom of the revenue trough related to this issue as we exited the quarter at yields, cycle times, and shipping rates that will all support future materials revenue growth. During the quarter, we also saw weaker demand for RF products due to secular headwinds with the recession-related pullback in 5G demand. This resulted in lower than expected revenue for RF devices, which we expect to remain weaker in the second half of this fiscal year. non-GAAP gross margin in the Q2 was 33.6% compared to 35.6% last quarter and 35.4% in the prior year period, representing a 180 basis point decline year-over-year.
Gross margin was negatively impacted by the previously mentioned lower yields on the taller 150 mm boules and lower output of the Durham fab due to the supply chain challenges. We made significant progress on both issues in the quarter and expect to see improvement moving forward, they both represented a drag on gross margin during the second quarter. In addition, RF devices continued to be dilutive to our consolidated gross margin. As we discussed, because of the immense demand for our power devices, we have not been able to optimize the RF manufacturing footprint as we had previously planned. We expect our RF product line will negatively impact our consolidated gross margin by approximately basis points for the next few years.
As a result of these items, we generated adjusted earnings per share of -$0.11 in the fiscal second quarter, compared to -$0.04 a quarter ago and -$0.16 in the same period last year. Notably, adjusted EPS this quarter was favorably impacted by approximately $0.05 of non-repeatable events in other income and tax. Excluding these non-repeatable items from our earnings, we would have been at an approximately $0.16 loss per share during the quarter. Before I discuss our guidance, I'll provide a quick overview of our balance sheet position. We ended the quarter with approximately $2.5 billion of cash and liquidity on our balance sheet to support our growth plans. DSO was 62 days, while inventory days on hand was 161 days, which is 26 days higher than Q1.
Free cash flow during the quarter was -$171 million, comprised of -$67 million of operating cash flow and $104 million of net capital expenditures. During the quarter, we incurred startup costs primarily related to the Mohawk Valley fab ramp, totaling approximately $38 million. Moving forward, we expect overall startup and underutilization charges for Mohawk Valley to wind down as we ramp the fab. We included a non-GAAP adjustment for these startup costs in the reconciliation table in our earnings release. In terms of our capital needs, since we last spoke, we have made great progress in securing funding for our Greenfield facility construction and long-term capacity expansion plan. In November, we announced a successful convertible note offering anchored by one of our largest strategic partners, BorgWarner.
We were extremely encouraged by the demand we see in the marketplace and believe it sets us up well to secure further funding. Additionally, we are still evaluating other avenues of additional funding, including government funding in the United States and Europe, as well as upfront customer payments or investments, the capital markets, and debt. As we've stated previously, cost of capital and potential dilution is top of mind for us while we are pursuing additional capital. Now, moving on to our fiscal Q3 outlook. We are targeting revenue in the range of $210 million-$230 million. Our revenue guidance reflects continued strong demand as well as supply execution improvement in both our power device and materials product lines, partially offset by continued softness in RF demand.
Our Q3 non-GAAP gross margin is expected to be in the range of 32%-34%, as we expect to see some improvement in both power device and materials products, offset by RF weakness due to the lower volumes. We expect non-GAAP operating expenses of approximately $98 million-$100 million for the Q3 of fiscal 2023. We expect Q3 non-GAAP operating loss to be between $22 million and $30 million, and non-operating net loss to be approximately $3 million. We believe that we will realize approximately $5 million-$7 million of non-GAAP tax benefits as a result, and expect Q3 non-GAAP net loss to be between $15 million and $20 million, or a loss of $0.12-$0.16 per diluted share.
Our non-GAAP EPS target excludes acquired intangibles amortization, non-cash stock-based compensation, project transformation and transaction costs, factory startup and underutilization costs, and other items as outlined in our press release today. As always, our Q3 targets are based on several factors that could vary greatly, including supply chain dynamics, overall demand, product mix, factory productivity, and the competitive environment. With that, let me pass it back to Greg for his closing remarks.
Gregg Lowe (President and CEO)
Thanks, Neill. Despite some macroeconomic pressures on the silicon semiconductor market, we are confident in our long-term outlook and the strong secular trend for the demand for silicon carbide. Our design-in number continues to be robust, and the opportunity pipeline remains at a staggering $40 billion. We have a strong pipeline of design-ins across a wide range of applications, including automotive, industrial, and energy. We are increasingly well-positioned to capture a significant share of this opportunity and are committed to investing in the necessary infrastructure to support our growth. As far as our infrastructure goes, our focus on ramping Mohawk Valley will allow us to better scale our power device production while our 200 millimeter materials capacity also scales. The learnings from Mohawk Valley have given us a blueprint on how we'll approach the construction and ramp of our next fab.
We should have an update for you on those plans very soon. The immense demand for both merchant and captive materials gives us further confidence in our decision to expand the Durham materials footprint and build the JP, dramatically expanding our materials capacity. This factory will be a game changer for our business and will allow us to increase supply at unprecedented levels compared to what is currently in the marketplace. We were encouraged by our convertible note offering in November. We are focused on effectively deploying this capital to further our capacity expansion plans and generate returns for our shareholders.
Now, there will be challenges as we ramp our new facilities, but we will attack them quickly and use our 35 years of experience to resolve them and keep progressing forward. Now I'd like to turn it over to the operator for questions.
Operator (participant)
If you'd like to ask a question, please press star followed by one on your telephone keypad. If for any reason you'd like to remove that question, please press star followed by two. Again, to ask a question, it is star one. Our first question is from Harsh Kumar with Piper Sandler. Your line is now open.
Harsh Kumar (Managing Director and Senior Research Analyst)
Yeah. Hey, guys. Thanks for letting me ask a question. Gregg, I wanted to ask about the revenue levels that came in for the December quarter relative to perhaps what we were thinking. You talked about a couple of things. You talked about some boule-related issues. There were some equipment issues with your older fab in Durham, and then you also talked about back end issues in the materials business. I was curious if you could help us think about maybe what, you know, I'm not asking for exact splits, but what the contribution was, the revenue mix from maybe each of these factors, or if there was one that was materially bigger than the other. Also I noticed that the cadence of guidance going forward is a lot smaller than what you typically give.
Your midpoint is only $4 million-$5 million higher. Is that because you are being conservative or you just wanna get a bigger, better handle on these issues before you go back to guiding sort of bigger increases? Then I have a follow-up.
Neill Reynolds (CFO)
Hey, Harsh, this is Neil. Let me take a shot here to start. Like you said, there's a lot of moving pieces here. Let me just unpack that a little bit and then maybe think a little bit about where we're headed moving forward, just based on some of the comments you made there. First of all, let me just say, overall, we're continuing to see very, very strong demand across both power devices and materials. As we previously discussed, for both of those areas, that's gonna be much more of a supply situation rather than being a demand situation. Bringing on supply is really the critical focus there. What we did see in the quarter was a weakening in RF. You know, RF markets were weaker.
We did see some orders pushed out in the quarter. I mean, if you look back just to back to Q1 versus what our outlook is this quarter, it's approximately a 25% decrease. As you look into Q3 and Q4, and even the back half of the year, it's about a $15 million decrease in revenue versus what our prior kinda expectations are. Weakening from a demand perspective in RF is a piece of this. Now, you pointed out a couple of other areas. We had two issues last quarter we talked about. One was the lower yields in the 150 millimeter boules, and the taller boules on 150 millimeter.
As we said in the prepared remarks, those issues have been resolved from a yield perspective. It took a little bit longer in the quarter to get to the cycle times and throughput, so we built a bit of inventory. The shipping rates at the end of the quarter were a little bit slower. We saw that in increased inventory. Essentially we are at the bottom of that issue, and we are on our way back up. The last one there was just on the Durham fab. From a Durham fab perspective, we had some supply chain issues. This actually came in better than we anticipated. For all intent and purpose now, the Durham fab is capped.
We talked at Investor Day about a $400 million annual revenue coming out of Durham fab for power devices. That's about $100 million a quarter, and we're gonna be capped on that until we, you know, until we start ramping up Mohawk Valley. I would think about future significant builds in revenue from a power device perspective are gonna be coming from ramping up Mohawk Valley.
Gregg Lowe (President and CEO)
Harsh, I would just add to that, we're at an inflection point right now where, you know, we are running material through Mohawk Valley. We are planning for revenue coming out of that factory in the Q4 of this fiscal year as we qualify the product. The yields that we're seeing on the pre-production runs right now give us substantial confidence in being able to do that. In fact, they're running higher than we would have anticipated at this point. We're really, really happy with that. I think as we ramp this facility, which again, recall just three years ago was a field of mud, we're gonna see a substantial increase in capacity coming online, which obviously will help us satisfy that substantial demand that's out there.
Harsh Kumar (Managing Director and Senior Research Analyst)
Hey, very helpful, guys. For my follow-up, actually, it's a good segue into the Mohawk Valley schedule. So very pleased to hear fourth quarter, which is June quarter, for revenue ramp. I've been already getting some questions from investors on how we should think about revenue scaling to happen there. You've got a lot of pent-up demand, Greg, and I think the industry relies on basically two or three guys for much of the production of, you know, the vertical production. Two guys actually, you're one of them. Help us think about, if possible, how the scaling will happen for that fab as the rest of the calendar year goes on.
Gregg Lowe (President and CEO)
I'll kick it off, and then Neil can talk a little bit more detail. We're anticipating revenue from that fab, kind of think of it in the single-digit millions of dollars in the June quarter, in the fourth quarter, and then we would be ramping up, you know, beyond that. We're ramping up the supply of the 200 millimeter wafers for that at the same time. There's probably gonna be some puts and takes, and we'll also ramp it up in a I would describe it as a methodical process, it's not just sort of turn on everything at once. We're very, very pleased with what's happening with the yields, as I mentioned. You know, both the device yield and the process yields are looking really, really good right now.
We expected that to eventually be the case. It's actually happening earlier than we anticipated.
Neill Reynolds (CFO)
Just to kind of frame up the revenue, as Gregg Lowe said, we thought we'd probably have around, you know, single digit millions of revenue, maybe even in Q3, a more substantial growth in Q4 as we start to ramp up the fab. Let's see that push out about a quarter at this point. It's gonna be a lot of moving pieces. Look, we're bringing up the first, as Gregg Lowe mentioned, the first 200 millimeter substrates. We're bringing up in the Mohawk Valley fab for the first time. We're in the middle of qualification lots. We're matching that up with customer schedules in terms of qualification. A lot of moving pieces, so that'll probably create some variability here, you know, as we move forward.
From where we sit today, you know, we really are on the cusp of, you know, bringing this, you know, this project we've been working on for multiple years, you know, and bringing it to reality.
Harsh Kumar (Managing Director and Senior Research Analyst)
Wonderful, guys. Thank you for the color.
Gregg Lowe (President and CEO)
Thanks, Harsh.
Operator (participant)
Our next question comes from Brian Lee with Goldman Sachs. Your line is now open.
Brian Lee (Research Analyst)
Hey, guys. Good afternoon. Thanks for taking the questions. Maybe just to follow up on Harsh's question, because there's been a lot of, you know, intense focus around the exact timing of Mohawk Valley ramp. You know, Neill, you said there's a bit of a push out here, as you alluded to. I think people are expecting, you know, some minimal revenue in the March quarter and then ramping through the back half of fiscal 23. Now it's June, so it's a quarter behind. Is this a, you know, a boule back-end processing issue? Is it, you know, customer calls taking longer? I guess, you know, just a sense of, you know, maybe pinpointing what the issues are.
I know there's moving pieces, but it almost sounds like, as you're navigating this, maybe frame for us kinda how you feel about the June quarter, these issues not repeating and maybe having even further push outs. Then I had a follow-up.
Gregg Lowe (President and CEO)
Yeah. Thanks a lot, Brian. You know, I would say that we're ramping this in kind of a conservative type way. We are bringing together, first off, the world's first 200 millimeter silicon carbide wafer fab on the world's first 200 millimeter silicon carbide wafers. There's a lot of variability in here. We're very, very pleased with the results out of the fab right now. The last thing we wanna do after 3 years of hard work is sort of drop the ball right as we go into the end zone. We're gonna ramp it up in a very methodical way. We've got material running through the factory right now. As I mentioned, it's looking really good. We anticipate qualifying it and then shipping, you know, this first few millions of dollars of revenue in the June quarter.
We've got customers lined up for that. Well, then we'll be ramping in the following quarters as well. I think, you know, I think we feel pretty confident at this point, that we'll be able to do that. There's gonna be some puts and takes. We still have to qualify. Based on all the data we see today, we feel pretty confident in that.
Brian Lee (Research Analyst)
Okay. Fair enough. Then a follow-up for you, Greg. I think you mentioned the design-ins. I caught a 46% kind of conversion number. I think you were talking about in terms of projects, so I'm taking that to assume it's units. Is there somewhat of a kind of, you know, similar conversion metric you can provide in terms of, you know, design-ins to revenue, just whether that's in the quarter or something you've seen cumulatively, and if that's sort of the right framework to think about, you know, success on the design and pipeline going forward? Thank you, guys.
Gregg Lowe (President and CEO)
Sure, Brian. When we talk about that 46% number, that's the 46% of the design-ins that we have transitioned from design-in to design win, which means, we're starting to ship initial production volume. It's a percentage of the projects. It's not a percentage of the total dollars. It's a percentage of the projects. Think of it as 46% of the projects that we've won, where customers have given us, you know, a design-in, have now transitioned into that initial phase of production ramp, which is really remains an astounding percentage to me. It's a lot faster than I would have anticipated. Most of those are gonna be more industrial type projects because they typically have a shorter ramp profile compared to automotive.
We're seeing good traction on the automotive ones, you know, as well. That's how to think about that.
Brian Lee (Research Analyst)
Okay. Presumably, unless the project values, you know, the project scope were to change the projects converting at 46% or so would also translate pretty similarly on a dollar basis.
Gregg Lowe (President and CEO)
Yes. What we do from a forecasting perspective is we start with obviously our overall opportunity pipeline, then we have design-ins. When we look at going from design-ins to revenue, we put a pretty conservative filter on that, assuming some projects aren't gonna make it all the way through, some customers are gonna not go into production with the project. You know, a lot of things can happen in between now and then. We've put a pretty conservative factor on there in terms of kind of framing the revenue compared to what the design-ins are. That 46% number gives us a lot of confidence in the amount of conservatism we've had on that.
Brian Lee (Research Analyst)
Okay. Thanks a lot, guys. I'll pass it on.
Gregg Lowe (President and CEO)
Thanks, Brian.
Operator (participant)
Our next question comes from Samik Chatterjee with JP Morgan. Your line is now open
Samik Chatterjee (Analyst)
Thanks for taking my questions. I guess for the first one, a near term and then maybe a longer-term question on the second one. I know last quarter there was the guidance about sort of exiting fiscal 2Q, the December quarter at roughly a $1 billion run rate of revenue. Based on sort of your commentary today, it seems more you're saying the scaling to that $1 billion sort of revenue run rate, even when we think about fiscal 4Q, if you sort of put Mohawk aside, is maybe a bit difficult because RF demand has moderated and essentially your Durham is a bit more capped in terms of power devices. Am I getting that right in terms of even moving sequentially from higher from March to June?
It sounds like you're saying it's a bit more limited in terms of getting to that $1 billion run rate, or is that unchanged? I have a follow-up.
Gregg Lowe (President and CEO)
Yeah. I think that's mostly correct. Let me just maybe just frame it up a bit just to make sure we're all kind of on the same page here. I think as we looked at this back in October, we were looking at this quarter, you know, given the tolerable yield issues, the supply chain challenges in the Durham fab, our anticipation was to be, you know, maybe meeting that kind of billion-dollar run rate, kind of quarter of a billion dollar revenue number, run rate sometime during, you know, Q3. You can think about that as between $225 million and $250 million sometime in Q3. RF has been a, you know, a drag on that with the demands.
It is about $15 million a quarter, and we did anticipate having some revenue from Mohawk Valley, some smaller amounts potentially in the quarter, and that is now pushed out. As you start to think about revenue timing going forward, with Durham now, I would say essentially capped in what we had here. We see the RF numbers kind of staying lower. We're gonna get a little bit of benefit off of the, you know, the better yields and shipping rates in materials. What we'll see here is it's really gonna be a function of when and how we ramp Mohawk Valley. Essentially our revenue and even our margins for that matter, will really be a function of the timing of Mohawk Valley.
We'll be somewhat limited in the amount of revenue we can drive in the back half of this year, outside of RF until we start bringing on more supply from Mohawk Valley, and that timing is, I think all roads are gonna lead to Mohawk Valley in that sense.
Samik Chatterjee (Analyst)
Got it. Got it. For my follow-up, I know I saw in your press release you announced the partnership that you have with ZF and their press reports out there indicating you have a agreement in terms of a new plant in Germany. Sort of, maybe sort of a two part one, sort of, it seems like what you're indicating is you haven't really confirmed or made a decision yet on the new fab in Germany. Secondly, sort of tilting more towards tier one suppliers like ZF and BorgWarner with some of your capacity announcements. Is that a change versus how you wanted to go to market with more sort of direct approach to the OEMs in the past? Just curious, sort of given that more recently you've been more sort of announcing engagement with the tier ones.
Thank you.
Gregg Lowe (President and CEO)
Yeah. Thanks for the question. You know, recently, in fact, in early January, we made an announcement together with Mercedes. We've had a consistent sort of theme of both tier ones and the OEMs in terms of announcements. OEMs that have been announced have been General Motors, Jaguar Land Rover, Mercedes, tier ones, of course, ZF, BorgWarner, a number of others, you know, as well. There's no change in that. I think we've been pretty consistent that we've been winning long-term agreements with both the OEMs and the tier ones. As this transition from internal combustion engine to EV, you know, has such a dramatic change for the automotive makers, I think you're gonna see a lot of engagement in both of those.
In terms of our next fab, we mentioned at our Investor Day that the demand for our products is so strong that we need to have a new fab in place, kind of ramping up in the 2027 timeframe. If you subtract then from that the amount of time it would take us to build and ramp, you know, that factory, it says that we need to be, you know, starting to put that thing in place in 2023. What I would say is just kind of stay tuned for that. You know, we've got a lot of work going on there and, you know, as we make announcements on that, we'll be able to comment on it.
Samik Chatterjee (Analyst)
Thank you. Thanks for taking the questions.
Operator (participant)
Our next question is from Gary Gudice with Wells Fargo. Your line is now open.
Gary Gudice (Equity Analyst)
Hey, guys. Thanks for taking my question. I had a follow-up on the potential for new silicon carbide wafer processing facility. Since you brought it up in your prepared remarks, Greg, I'll probe a little bit deeper. The potential for that with a joint venture, would that mean the joint venture partner would take the bulk of the output of that facility, if not all of it, not too dissimilar from, you know, BorgWarner and Mohawk Valley? How would such a build impact fiscal year 24 CapEx relative to prior communication?
Gregg Lowe (President and CEO)
Yeah. What I would say is, we really can't get into a lot of details, you know, on that. I would say just kinda stay tuned on that, and then we can be very, very clear.
Samik Chatterjee (Analyst)
A little add there, Gary, just from a CapEx perspective, when we laid out the plan, you know, at the end of October as it relates to CapEx, I mean, as I've mentioned before, that really includes everything. We knew at that point we, you know, we would need a, you know, a second fab and a materials facility. You know, what we've laid out from a capital planning perspective includes all of those things. Right now we don't see that any differently.
Gary Gudice (Equity Analyst)
Got it. Got it. For my follow-up, when you announced Siler City, I believe the communication was that all that 200 millimeter output would be consumed internally. Has that view changed at all, or will you be supporting some of these, you know, merchant LTSA wafer supply agreements with some of that output? Then maybe if you can just give us a sense of
Jed Dorsheimer (Group Head, Energy and Power Technologies)
The trajectory of your wafer-related shipments based on some of these new LTSAs.
Gregg Lowe (President and CEO)
Basically, we're at the early phase of really ramping up 200 millimeter, and we're doing all we can to ramp it up and feed the Mohawk Valley fab. We're also doing all we can to drive the costs and the commercialization of that product to a point where we can decide, you know, at that point what makes sense from a long-term agreement perspective. At this point, it's looking like the vast majority of what we'll do at the JP now will be 200 millimeter. We do have the ability, if we wanted to run 150 there. If there was continued need and demand for 150 millimeter, we could do that at the JP facility.
Yeah, the vast majority of what we're gonna be doing, in the JP is gonna be, the 200 millimeter.
Operator (participant)
Our next question comes from Colin Rusch with Oppenheimer. Your line is now open.
Colin Rusch (Managing Director and Senior Research Analyst)
Thanks so much. You know, it sucks you're getting a little bit more mature in the auto industry around their platforms. Can you talk a little bit about the cycle times that you're seeing in terms of some of the design-ins, as they look at, you know, scaling some of these platforms into multiple vehicles and moving into multiple geographies?
Gregg Lowe (President and CEO)
I would say we're seeing a couple of different things. First off, the cycle from when a customer begins thinking about, you know, implementing a new platform to when it goes into production is still in that kind of that 4-5 year range, I would say. Some of the more startup type companies can be a little bit faster, but that's kind of the range. What I would say is happening though is, customers are taking the platform that they're gonna use for vehicle X, and they're reusing it for vehicle Y. So obviously the cycle time for that is dramatically shorter, to be able to just, you know, kind of, rinse and repeat and, you know, reapply the same platform for another, you know, vehicle.
We've seen that numerous times across just about, I don't know, about all of our design wins, but many of our design wins we've seen where we were in one platform, and now we're in two, and now it's four. I think that kind of is driving some of the steeper ramp that we're seeing in the demand for the product.
Colin Rusch (Managing Director and Senior Research Analyst)
All right. That's super helpful. In terms of some of the industrial applications, you know, are you seeing anything new on the horizon that are real accelerants in terms of demand for you guys? You know, are there areas outside of automotive that are real highlights that we could think about as demand drivers for fiscal 2024 and 2025?
Gregg Lowe (President and CEO)
You know, we're seeing a lot of different applications. They tend to all be small individually. Collectively they can be large. Anything that's basically converting energy at a high power or high voltage range is really making a move towards silicon carbide. We're seeing that in solar systems. Wind systems are, you know, doing the same thing in terms of green energy. Server farms, we've got design-ins into non-vehicle but other transportation applications like vertical takeoff and landing equipment and personal watercraft is another example where people are, you know, customers are designing it in. Yeah, we're seeing it across a large number of different kinds of industrial applications. In this regard, it's really the exposure we have to that is really led by Arrow.
That's done a really terrific job of getting us access to, you know, their footprint to be able to, you know, engage with customers. You know, from a, from a sales perspective, we have a relatively limited footprint, and Arrow has the largest sales footprint in the world. They're able to go after, you know, customers across all different geographies and sizes to be able to, you know, penetrate that market and evangelize silicon carbide.
Operator (participant)
Our next question is from Jed Dorsheimer with William Blair. Your line is now open.
Jed Dorsheimer (Group Head, Energy and Power Technologies)
Hey, thanks. Hey guys. Thanks for taking my questions. Greg, first one to you if you would. you know, I don't want to trivialize how difficult it is in terms of what you're doing with 200 millimeter, but as you've sort of, you know, as we've gone through this process over the past 3 years kind of forging this path, are there any lessons that you can share in terms of, you know, areas that things have kind of gone better and areas that maybe have gone a little bit worse that kind of get you to the end result?
I'm asking this question kind of on the eve of, you know, or when you do announce that second fab, how to sort of gauge timeline relative to this first fab. Then I have a follow-up question.
Gregg Lowe (President and CEO)
I would say a couple of things. you know, first off, we built this fab during a crisis, and we weren't expecting that. Nevertheless, you know, 3 years from, you know, when it was a field of mud to today, you know, we're beginning production, it's actually quite astounding, I think, what the team has accomplished. I think they did that through, you know, really a good plan, but probably more importantly, a good adjustment when we were thrown curve balls and so forth. You guys remember what all those curve balls were. The second thing that I would say is, from a super positive side of things, the decision to go fully 200 millimeter and to go fully automated was really solid.
You know, originally, we were saying, "Well, maybe we'll start at 150 and then convert it to 200." I think that would have been such a distraction. We had to get to a point where we were confident in 200, but we did get to that point, oh gosh, that was maybe 2 years ago, I think. I think, you know, kind of thank goodness we did that because I think it would have been really difficult to convert a 150 millimeter fab to 200 millimeter. I think the automation has been just stunningly awesome for us.
You know, I was talking to the team about process yield, expectations and so forth, and the fact that we don't have humans interacting with these wafers that can be pretty brittle has been really positive. I would say that's all, you know, I think those are some of the positive things. I think, you know, we've had obviously a number of different challenges, but, you know, but I think, the experience of the team, has allowed us to kind of clear those challenges quickly as well.
Jed Dorsheimer (Group Head, Energy and Power Technologies)
Got it. That's helpful. Probably segue for maybe you and/or Neil, but as we think about the ramp, there's, you know, it sounds like your strategy, you know, some strategies are to build, you know, high buffer, inventory and sort of ramp higher or, harder. It sounds like you're still taking a very methodical approach, just by the in terms of the ramp up. I'm wondering if you could help us understand, if ramping on lower volume, you're gonna be taking on the fixed cost and depreciation on a unit number or a unit basis, which I would think will have, you know, kind of a near term headwind from a margin. How should we think about the crossover of those vectors?
At 200 millimeters, you're gonna have a fundamentally lower cost basis. Is that at sort of a 40% load, or utilization or 60%, or where do you see that crossover where what might be, you know, a little bit of a headwind, you know, all else equal, kind of becomes that tailwind to really accelerate things? Thanks.
Gregg Lowe (President and CEO)
Yeah. I'll kick it off and then kick it over. I'll start it and then kick it over to Neil. Yeah, we're definitely taking a more methodical approach. As I mentioned before, we're in really good shape right now. We've got yields that are looking really nice right now. The last thing we wanna do is just, you know, turn the accelerator too hard, and, you know, kind of mess it up at the end here. I think we're in the mode of let's do this in a methodical way. Let's take it step by step. We're really pleased, I said, with the yields that we're seeing out of this.
We'll be qualifying, the product in the Q4 and shipping to customers and then we'll turn on the fab, you know, kind of step by step.
Neill Reynolds (CFO)
Yeah. Then from just a overall cost and I think fixed cost absorption, I think is kind of where your question is going. Yeah, just in terms of bringing on a factory for the first time. First of all, I think, I don't know the exact number, but I think if you recall from the Investor Day, we said Mohawk Valley kind of breaks even, at least from a cash perspective, from kind of that 30%-40% kind of utilization level, which I think is probably still valid. Everything we're seeing now from wafer cost to yields to, you know, every, you know, the overall cost structure of the fab all looks pretty good.
As we move forward, and I think I've talked about this before, what we'll do to manage through this kind of early stage ramp is we currently have a startup cost that we back out that we give an update on every quarter. We'll also think about an underutilization adjustment going forward to get the, get the fab being marked to about 70% utilization. We'll start to wind that down as we build inventory in the fab. Right now I think what you see is the kind of the peak under, you know, startup and underutilization number, and that'll just start winding down over time. That should give people a really good view of what the fab capability is from a cost perspective, even at a relatively low level of utilization.
What you see there is when we talk about the fab having, you know, die cost that's 50% lower than our current cost in Durham, that's really based on a, on that kind of lower utilization number. We'll be able to kind of manage through that. We'll give an update on it every quarter, we think we, but I think everything I'm seeing from a cost perspective thus far, gives a lot of confidence in the margins that we'll see as we ramp up the fab.
Operator (participant)
Our next question is from Vivek Arya with Bank of America. Your line is now open.
Blake Freeman (Analyst)
Hi, this is Blake Freeman. I'm from Vivek. Just touching on the 5G weakness that was mentioned earlier, just curious if it's related to any specific geography. With weakness to continue in the second half, is there any way you can quantify how much you expect second half RF sales to be coming in relative to first half?
Neill Reynolds (CFO)
From an RF perspective, I'd say overall we're seeing a lot of choppiness, you know, across the customer base. It probably depends on which customer, you know, each of the suppliers is dealing with. I don't see. But I do see some. We do see flattening or even, you know, market weakness, you know, across a lot of different vectors, as we look across, you know, across the industry. As I said earlier, is we see that about a $15 million drag per quarter and it, you know, versus what we had previously, you know, expected from a revenue standpoint. I think we'll continue to see that as we go through the back half of the year.
Natalia Evstrateva (Analyst)
Got it. Then just kind of quickly too, just touching on the CHIPS Act and your CapEx cadence moving forward, if there's any benefits there specifically that you can size or just even high-level comments would be useful. Thanks.
Gregg Lowe (President and CEO)
On the CHIPS Act, we're very, you know, pleased with how things have progressed. We're waiting on final regulations to come out, but clearly not just the CHIPS Act. You know, I think Like I said, the final regulations will come out, but the investment tax credit that came along with that, you know, is very positive as well. We've already started baking, you know, some of those benefits into our numbers, and it's all in line with what, you know, we kind of anticipated when we laid out the plan last October. No real changes there. We'll continue to work, you know, with the government on the regulations as it relates to, you know, applying for additional funds.
Operator (participant)
Our next question is from Matt Ramsey with Cowen. Your line is now open.
Matthew Ramsay (Managing Director and Senior Equity Research Analyst)
Thank you very much. Good afternoon, guys. For my first question, I wanted to ask a bit on the RF business. There was gonna be this 150-millimeter transition, and you guys talked about on the last call and then at the Analyst Day, the margin headwinds that were gonna come from maybe not making that transition, and that was pretty clear. As I understood it, the reason for not making that transition was things were so tight in that facilities that you couldn't sort of shut things down to make the transition. If now we're seeing cyclical demand weakness in RF devices, is there an opportunity to make that transition now? And maybe you can just help me square that circle a bit. Thanks.
Gregg Lowe (President and CEO)
Yeah. Just recall that facility also produces our power products as well. There's really not. You know, although there's a little bit softer demand on RF, there's really still not that opportunity to make that transition.
Matthew Ramsay (Managing Director and Senior Equity Research Analyst)
Got it. Okay. It's a shared facility then, Gregg, that you're leaning into any flex for the silicon carbide device side rather than making any transition. Is that kind of the right way to read it?
Gregg Lowe (President and CEO)
That's right. You know, changing out an RF line in a, in a shared facility, it creates a lot of disturbance for everything, and we just, we can't afford to do that for our power device customers.
Matthew Ramsay (Managing Director and Senior Equity Research Analyst)
Got it. Got it. That makes sense. I guess as my follow-up, I wanted to. We've had a lot of discussion here on the call about the timing of ramping Mohawk Valley and the variables to get there. I just wanted to double-click on the $200 million materials side. How are you guys thinking about the steps needed to really scale there to sort of feed the beast? I'm just trying to get an understanding of checking off the boxes to really scale Mohawk.
Are the things on your priority list, Greg, on the material side on 200 mm, or are they still in the Mohawk Valley devices side and sort of where the variables are to the ramp?
Gregg Lowe (President and CEO)
It's definitely both. We've got, we're working obviously the fab itself, and I've given you inputs on that that's going, you know, pretty well. You know, a one-quarter delay on revenue notwithstanding, you know, we feel real good about what's been going on there. We are expanding capacity on our Durham campus as we speak and turning on additional capacity, I think this week, for more to be able to feed more product into Mohawk Valley, where that expansion kind of took over a, I think it was a basketball court and some other facilities and turned it into a 200 millimeter silicon carbide crystal growth, you know, operation in what we call Building 10.
Of course, you know, the big, you know, dramatic increase in that is gonna come with the construction of the John Palmour Manufacturing Center for Silicon Carbide or the JP. That, that expansion, we're estimating is gonna increase our capacity by more than 10x. It's a giant capacity expansion, and we're super happy that we made the decision back in September to kick that thing off. To put things kind of in perspective, we made that announcement on a Friday at the governor's mansion here in North Carolina, and we had earth-moving equipment on site the following Monday. We knew we needed to go from decision to get stuff going very, very quickly.
Operator (participant)
Our next question is from Katya Evstrateva with Canaccord Genuity. Your line is now open.
Natalia Evstrateva (Analyst)
Hi. Thank you. I'm filling in for George. Greg and Tyler Gronbach and Neill Reynolds, maybe if you could stick to the demand that is coming from all your design wins, and if you are to contrast and compare what's happening in Europe versus what's happening in the US, where do you see most demand coming from, especially given the tailwinds of your recent announcement with Mercedes? Thank you.
Gregg Lowe (President and CEO)
You know, I don't, I don't have the exact numbers in front of me. I can say we're winning very well in both the U.S. and in Europe. You know, we've made announcements with GM and BorgWarner, big U.S. based companies or North American-based companies. We've talked with, we talked about Jaguar Land Rover, Mercedes, ZF, European-based company. Some of those tier ones have business across the globe, so we're winning in Asian markets, you know, as well. I don't have the exact breakout, but I would say kind of globally, we're winning pretty nicely.
Natalia Evstrateva (Analyst)
Thank you, Greg. If we are to look at the $1.5 billion in design wins, could you assess how much of it is coming U.S. versus Europe in terms of automotive wins?
Gregg Lowe (President and CEO)
You know, I don't have that breakout right now, but what I would say is if it follows the pattern that we've seen over the last couple of quarters, it's going to be pretty heavily automotive-related. Kind of think of it as 70-75% automotive-related, and then 25% would be, yeah, either industrial type applications, RF applications, and so forth. I'm sorry, I don't have the regional breakout right handy.
Natalia Evstrateva (Analyst)
Thank you.
Operator (participant)
Our next question is with Edward Snyder with Charter Equity Research. Your line is now open.
Edward Snyder (Co-Founder and Managing Director)
Thanks a lot, guys. First of all, I think it's fantastic you're naming this facility after John. I think that's really, really great, guys. Couple things. First of all, Neil, housekeeping, can we get just a general breakdown of materials versus devices on this in terms of the revenue? You're, you know, not 50/50 yet, but can I get a general idea of where that is?
Gregg Lowe (President and CEO)
Well, like I said, let me just point out a couple of things, Ed. The Durham facility is now capped, and I said about $400 million a year, and that only, you know, provides power devices in that number. About $100 million a quarter, we're kind of capped on power device revenue until we start seeing more revenue out of out of Mohawk, out of Mohawk Valley. From a RF device perspective, we're down about 25% from our peak, which back in Q1. It represents about, you know, $15 million a quarter. I think that should give you the pieces there.
Edward Snyder (Co-Founder and Managing Director)
Down $15 million a quarter or it is $15 million a quarter?
Gregg Lowe (President and CEO)
$15 million less than our, you know, previous expectations. That's roughly, I think approximately $15 million lower than where we were back, you know, back in Q1.
Edward Snyder (Co-Founder and Managing Director)
Yeah. Okay. Given that it's capped, and given that your RF is on the way down, can you move some of the capacity? I imagine you can't. The RF line can't be converted and RTP cannot be converted to device, so you can't sop up the extra capacity, maybe freeing up an RF with devices and expand your RTP. You said Durham is capped at $100 million, but that didn't include RTP, right? You've got some revenue coming out of RTP for devices too, right?
Gregg Lowe (President and CEO)
Yeah. We've actually, Ed, we do have, we do have some power product going through the RTP facility. We've been working that for a little while to do as much as we can, utilizing some of the machines out of there. Basically, there's just no room at the inn right now.
Edward Snyder (Co-Founder and Managing Director)
Yeah, I can imagine. If you're capped at $100 million there, plus whatever you get out of RTP, then the real growth is just gonna come out of materials, which I understand now that you've got the boule issue corrected, could ramp. Until you get Siler City based on, I would expect, and correct me if I'm wrong, you're gonna see rather limited ramp on revenue on materials, even though demand far exceeds supply at this point. That probably means, I'm not looking for guidance, but I'm just wanting to do a reality check on our kind of our big picture view here, that with single digit millions out of Mohawk Valley in June, we're gonna be kind of flattish, slightly up revenue for most of the fiscal year.
It's all gonna turn, as you guess, I guess you said, Neal, on the ramp of Mohawk Valley for any real revenue growth in 2023. Is that a fair assessment?
Gregg Lowe (President and CEO)
I think that's right, Ed. I think we're gonna see some, you know, we'll see some modest pickup in materials as we get, you know, better performance off of the longer boule. In reality, with the size of what we're talking about here, you know, as Durham is capped, you know, the capability of Mohawk Valley is just gonna be, you know, tremendous. I think it's something like 15% of Mohawk Valley, you know, utilization already could double our, you know, power device, you know, revenue capabilities. It's kind of a digital thing here. If Mohawk Valley turns on, I think we'll start seeing the revenue growth pick up very quickly.
If, if it doesn't, then we'll kind of stay in this kind of maybe flattish to modestly up until we, until we start to see that, you know, that revenue get turned on. When it does, we're gonna see the first millions of dollars of revenue for a facility that can do north of $2 billion a year. It's got tremendous capability. Just gotta, I think, like I said earlier, all roads are leading to, we gotta, you know, get Mohawk Valley off the ground, and we're just on the cusp of doing that.
Edward Snyder (Co-Founder and Managing Director)
It's clear that's the, like you pointed out, the digital, the 1 0 function here. Margins will probably decline then because as you turn it on, you're not gonna have anywhere close to, you know, 30% or 50% utilization, so you're gonna underutilization. Appreciate you breaking that out. I'm just trying to get a concept because, you know, consensus was way off, and it continues to be off here, and so I wanna get it calibrated for the rest of this year. Then to the point of Mohawk, have you provided customers with product that they are now qualifying or is that to come? Is that the revenue that you'll recognize when you hand that over to them to qualify, do they pay you for it?
I'm just trying to get an idea where we are on customer qualification for the material out of Mohawk Valley.
Gregg Lowe (President and CEO)
We would give customers qualification material after we qualify. What we've done is we've talked to them about doing kind of parallel qualifications and kind of risk orders out of Mohawk Valley. There's a tremendous amount of demand for the product, we've got many customers that have kind of signed up for they'd like to be first, and they would have sort of a very rapid qualification process. Typically, that second qualification is one where you're pushing pretty hard the customer to do things. We're seeing the opposite impact right now, where, you know, customers are, you know, raising up their hand saying, can they please be first. We anticipate that that would go through relatively quickly.
Operator (participant)
Our next question is from Matthew Prisco with Evercore. Your line is now open.
Matthew Prisco (Research Associate)
Hey guys, thanks for taking the question. Just wanted to drill in on gross margins a little bit here. I'm surprised with the guide down in March now that the kind of boule issue is behind, and revenue's kind of got it up modestly. Can you kind of talk about the levers you have for gross margins into March and into the June quarter? Just to understand something you said before, when you ramp Mohawk Valley, will that be immediately accretive to your non-GAAP gross margins or dilutive? Thanks.
Gregg Lowe (President and CEO)
Yeah. Just a quick one on the, on the transition in the margins. Yeah, we did have a improvement in the yield, as Gregg mentioned before, in the taller boules. We had to get the cycle times to match that. We've since subsequently been able to do that as well. We did have a bit of an overhang there. We'll have some WIP we've got to work through on some of the inventory from last quarter that's just got to work through the cycle. That's gonna kind of, you know, be a bit of a drag.
The underlying performance, I'd say both for the, you know, materials, taller boules, as well as the Durham facility where we had some issues last quarter, that'll just work itself through over the next 2 months. I think underlying performance will start to improve. I'd say a bit of an overhang there from those things. I think overall, the underlying performance, we should see improving. As it relates to Mohawk Valley, as we ramp the fab, we'll see that will be accretive to non-GAAP gross margins. We'll make an adjustment for underutilization there, just to ensure we can get kind of an apples to apples view of what their fab will look like from a performance perspective.
Then we will continue to give updates every quarter as to what that, what that number is.
Matthew Prisco (Research Associate)
Gotcha. It's helpful. Then as a follow-up, maybe CapEx for the year, given your spending now in the first half, are you guys still targeting $1 billion net for the year? If so, where's that spending going in the second half? Can you help us think through what fabs or equipment for Siler City and all that good stuff?
Gregg Lowe (President and CEO)
Yes, $1 billion for the year. That's correct. We should see a pickup in the back half of the year. We've talked about that before. There's some expansions that are going on in Durham right now. Gregg talked about turning on portions of the 200 millimeter. We'll continue to expand the 200 millimeter substrate capacity on the Durham campus in and around Durham. That's a big piece of what's going on now. In addition to that, we'll be working on, you know, bringing Siler City to the next phase and getting that facility completed. I think those will be the bigger pieces. On top of that, we continue to invest in tools in Mohawk Valley and we'll continue to tool that out as quickly as we can.
I think those will be kind of the big pieces of what we're gonna be spending in the back half of the year.
Matthew Prisco (Research Associate)
That's very helpful. Thanks, guys.
Operator (participant)
Our next question is from David O'Connor with BNP Paribas. Your line is now open.
David O'Connor (Security Analyst)
Great. Thanks for taking my questions. Maybe first just on the Mohawk Valley ramp up. Just trying to understand that if the yields are ahead of your expectations, you know, why the language now is more cautious on the ramp up? Just trying to understand where exactly is the remaining risk and uncertainty. Where does that lie with the Mohawk Valley ramp up, given that the finishing line is in sight here? Kind of related to that as well, we have $2 million in the June quarter. How many quarters will it take to kind of hit that $150 million a quarter run rate to kind of get to, you know, to help meet the, like, FY 2024 guide? I have a follow-up on depreciation.
Gregg Lowe (President and CEO)
Thanks a lot for the question, David. You know, we are exactly taking a conservative approach on this because we're so happy with the results that we see right now. It's a, you know, if we try to jam too much in too quickly, you know, it might cause an issue that is unexpected right now. We just wanna be methodical on that. We're not gonna be lazy on it. I mean, we're gonna be pushing it, you know, as hard as it makes sense. What we don't wanna do is overstress it and cause an unexpected issue. We're real pleased with the results right now. Let's just take it step by step, and I think we'll be well-served by that.
Yeah, and I think from a timing perspective, you know, like I said, it depends on how many, you know, how many wafer starts we can get into the fab and kind of ramp it up at volume. Once we do that, you should see a, you know, pretty, nice, you know, ramp up in revenue. I think we've got the pieces together. It's really just a matter of putting all these puzzle pieces together. You know, ramp up the 200 millimeter substrate, driving, starts into the fab, driving, you know, the power device back-end performance, for test and inspect and all those types of things.
On top of that, we've got to match up with customer schedules in terms of what, you know, when they're gonna accept material. We're matching all those variables up. You know, I think from a execution perspective, I think it kind of goes, it can go relatively quickly, but there are a lot of variables. We just wanna be very cautious there in terms of, look, there's a lot of pieces we need to pull together to get off the ground. We're working through that right now. As we can get the fab up and running, I think if you look at the economics of what we're seeing and the technical capability of what we're seeing, that all looks on track.
David O'Connor (Security Analyst)
Okay. That's helpful. Thank you. My follow-up on the just, Neil, on depreciation, you know, as you turn on the lines in Mohawk Valley now, you know, how should we be modeling on the depreciation side of things? Also just your comment earlier on the underutilization charge. I mean, would you be still excluding that from non-GAAP? Is there a certain utilization level where some of these costs move more into COGS and reflected in the non-GAAP? Just if you could talk around that'd be helpful. Thank you.
Gregg Lowe (President and CEO)
David, we'll make a fixed cost adjustment for the depreciation and some of the other fixed costs for about a 70% fab utilization number, and then adjust that every quarter. Right now, what we had last quarter was a $38 million startup number. You can think about that as the run rate cost of running the fab. As we bring up the fab, that number will start to decline over time. We'll take more and more of that into inventory, and that'll just start to bleed off as we get to higher levels of utilization. Any other performance, cycle time yields, all these other things, I think everyone's interested, that will kind of fall through.
We'll have pretty good visibility, as to what the performance is of the fab, just excluding some of the fixed costs related to the utilization.
Operator (participant)
There are no further questions, so I'll pass the call back over to the management team for closing remarks.
Gregg Lowe (President and CEO)
Well, thank you for joining us today. I'd like to welcome Stacy Smith to our board. Stacy's a great addition. He's got a career that spans many years in the semiconductor industry and spans many different functions, including, you know, finance roles and operations roles, sales and marketing roles. He's gonna bring a wealth of experience to our team. Really look forward to locking arms with him as we move forward here. We're at an inflection point. Very near the ramp in production of the world's first and the world's largest 200 millimeter wafer fab. We're excited about what it's doing right now. Look forward to continue driving that inflection point forward.
Thank you very much for taking the time with us and look forward to chatting with you next quarter. Thank you.
Operator (participant)
That concludes the conference call. Thank you for your participation. You may now disconnect your line.