Taiwan Semiconductor Manufacturing Company - Q3 2023
October 19, 2023
Transcript
Jeff Su (Director of Investor Relations)
Good afternoon, everyone, and welcome to TSMC's third quarter 2023 earnings conference call. This is Jeff Su, TSMC's Director of Investor Relations, and your host for today. TSMC is hosting our earnings conference call via live audio webcast through the company's website at www.tsmc.com, where you can also download the earnings release materials. If you are joining us through the conference call, your dial-in lines are in listen-only mode. The format for today's event will be as follows: First, TSMC's Vice President and CFO, Mr. Wendell Huang, will summarize our operations in the third quarter 2023, followed by our guidance for the fourth quarter 2023. Afterwards, Mr. Huang and TSMC's CEO, Dr. C.C. Wei, will jointly provide the company's key messages. Then we will open the line for the Q&A.
As usual, I would like to remind everybody that today's discussions may contain forward-looking statements that are subject to significant risks and uncertainties, which could cause actual results to differ materially from those contained in the forward-looking statements. Please refer to the safe harbor notice that appears in our press release. And now, I would like to turn the call over to TSMC's CFO, Mr. Wendell Huang, for the summary of operations and the current quarter guidance.
Wendell Huang (VP and CFO)
Thank you, Jeff. Good afternoon, everyone. Thank you for joining us today. My presentation will start with financial highlights for the third quarter, 2023. After that, I will provide the guidance for the fourth quarter, 2023. Third quarter revenue increased 13.7% sequentially in NT dollars, or 10.2% in U.S. Dollars, as our third quarter business was supported by the strong ramp of our industry-leading three-nanometer technology and higher demand for five-nanometer technologies, partially offset by customers' ongoing inventory adjustment. Gross margin increased 0.2 percentage points sequentially to 54.3%, mainly reflecting higher capacity utilization, partially offset by the margin dilution from N3 ramp.
Total operating expenses accounted for 12.6% of net revenue, as compared to 12.1% in the second quarter, mainly due to higher R&D expenses to support our 3nm and 2nm development. Operating margin was 41.7%, down 0.3 percentage point from the previous quarter. Overall, our third quarter EPS was TWD 8.14, and ROE was 25.8%. Now, let's move on to the revenue by technology. 3nm process technology contributed 6% of wafer revenue in the third quarter, while 5nm and 7nm accounted for 37% and 16%, respectively. Advanced technologies, defined as 7nm and below, accounted for 59% of wafer revenue. Moving on to revenue contribution by platform. HPC increased 6% quarter-over-quarter to account for 42% of our third quarter revenue.
Smartphone increased 33% to account for 39%. IoT increased 24% to account for 9%. Automotive decreased 24% to account for 5%, and DCE decreased 1% to account for 2%. Moving on to the balance sheet. We ended the third quarter with cash and marketable securities of TWD 1.55 trillion, or $48 billion. On the liability side, current liabilities increased by TWD 159 billion, mainly due to the increase of TWD 95 billion in accounts payable and the increase of TWD 59 billion in accrued liabilities and others. Long-term interest-bearing debt increased by TWD 30 billion, of which TWD 10 billion from new issuance and TWD 20 billion from foreign exchange rate movement. On financial ratio, accounts receivable turnover days increased three days to 35 days, while days of inventory decreased three days to 96 days.
Regarding cash flow and CapEx, during the third quarter, we generated about TWD 295 billion in cash from operations, spent TWD 227 billion in CapEx, and distributed TWD 71 billion for fourth quarter 2022 cash dividend. Overall, our cash balance increased TWD 35 billion to TWD 1.31 trillion at the end of the quarter. In U.S. dollar terms, our third quarter capital expenditures total $7.1 billion. I have finished my financial summary. Now, let's turn to our current quarter guidance. Based on current business outlook, we expect our fourth quarter revenue to be between $18.8 billion and $19.6 billion, which represents a 11.1% sequential increase at the midpoint.
Based on the exchange rate assumption of $1 to TWD 32, gross margin is expected to be between 51.5% and 53.5%. Operating margin between 39.5% and 41.5%. This concludes my financial presentation. Now, let me turn to our key messages. I will start by making some comments on our third quarter 2023 and fourth quarter 2023 profitability. Compared to second quarter, our third quarter gross margin increased by 20 basis points sequentially to 54.3%, primarily due to a higher capacity utilization rate and a more favorable foreign exchange rate, partially offset by the margin dilution from the initial ramp-up of our 3nm technology.
Compared to our third quarter guidance, our actual gross margin exceeded the high end of the range, provided three months ago by 80 basis points, mainly due to a more favorable foreign exchange rate. We have just guided our fourth quarter gross margin to decline by 1.8 percentage points to 52.5% at the midpoint, primarily due to the continued margin dilution from the steep ramp of our three-nanometer technology. As a reminder, six factors determine TSMC's profitability: leadership, technology development and ramp-up, pricing, cost reduction, capacity utilization, technology mix, and foreign exchange rate. To manage our profitability in the next several years, we will work diligently on our internal cost improvement, while continuing to strategically sell our value.
Excluding the impact of foreign exchange rate, of which we have no control over, we continue to forecast a long-term gross margin of 53% and higher is achievable. Next, let me talk about our 2023 CapEx and depreciation. Every year, our CapEx is spent in anticipation of the growth that will follow in future years. Given the near-term uncertainties, we continue to manage our business prudently, and have tightened up our capital spending throughout the year where appropriate. We now expect our 2023 CapEx to be approximately $32 billion. Out of the approximately $32 billion CapEx for 2023, about 70% of the capital budget will be allocated for advanced process technologies. About 20% will be spent for specialty technologies, and about 10% will be spent for advanced packaging, testing, mask making, and others.
Our depreciation expense is now expected to increase by low 20s percentage year-over-year in 2023, as compared to our January forecast of approximately 30% year-over-year increase. Despite the near-term inventory cycle, our commitment to support customers' growth remains unchanged, and our disciplined CapEx and capacity planning remains based on the long-term structural market demand profile. We will continue to work closely with our customers to plan our long-term capacity and invest in leading-edge, specialty, and advanced packaging technologies to support their growth, while delivering profitable growth to our shareholders. Now, let me turn the microphone over to C.C.
C.C. Wei (CEO)
Thank you, Wendell. Good afternoon, everyone. First, let me start with our near-term demand and inventory. We concluded our third quarter with revenue of $17.3 billion, in line with our guidance in U.S. dollar terms. Our business in the third quarter was supported by the strong ramp of our industry-leading 3nm technology and higher demand for 5nm technologies, partially offset by customers' ongoing inventory adjustment. Moving into fourth quarter 2023, while AI-related demand continues to be strong, it is not enough to offset the overall cyclicality of our business. We expect our business in the fourth quarter to be supported by the continued strong ramp of our 3nm technology, partially offset by customers' continued inventory adjustment. On the inventory side, we expect the fabless semiconductor inventory to have continuously reduced in the third quarter.
However, due to the persistent weaker overall macroeconomic conditions and slow demand recovery in China, customers have remained cautious in their inventory control. Thus, we expect the inventory digestion to continue in the fourth quarter. Having said that, we are observing some early signs of demand stabilization in the PC and smartphone end market. Together with such level of inventory control, we forecast the fabless semiconductor inventory to further reduce and exit 4Q 2023 at a healthier level. Next, let me talk about our global manufacturing footprint update. TSMC's mission is to be the trusted technology and capacity provider of the largest global logic IC industry for years to come. As we have said before, our strategy is to expand our global manufacturing footprint to increase customer trust, expand our future growth potential, and reach for more global talents.
Our overseas decisions are based on our customers' need and the necessary level of government support. This is to maximize the value for our shareholders. In Europe, after conducting extensive due diligence, we announced our plan to build a specialty technology fab in Dresden, Germany, focusing on automotive and industrial applications. We have received a strong commitment to support this project from our JV partners, the European Commission government, and German federal, state, and city governments. This fab will utilize 22 and 28nm and 12 and 16-nm technologies for semiconductor wafer fabrication. Fab construction is scheduled to begin in second half 2024, and production is targeted to beginning in late 2027. In Arizona, we are receiving strong support from the City of Phoenix, State of Arizona, and U.S. federal government, and continue to develop positive relationship and work closely with our local trade and union partners.
We are making good progress on the fab infrastructure, utilities, and equipment installation issues in our first fab, and the situation is improving. We have also begun early preparation for our Arizona fab operations and hire close to 1,100 local TSMC employees so far. Many of them has been brought to Taiwan for extensive hands-on experience in our fab, so that they can further their technical skills while being immersed in TSMC operation environment and culture. We continue to target volume production of a N4 process technology in first half 2025, and are confident that once we begin operations, we will be able to deliver the same level of manufacturing, quality, and reliability in Arizona as from our fabs in Taiwan. In Japan, we build a specialty technology fab, which will utilize 12 and 16nm and 22 and 28nm process technologies.
We have hired approximately 800 local TSMC employees so far, with the majority having similar been brought to Taiwan for hands-on experience. Equipment moving has begun this month, and volume production is on track for late 2024. In China, we have recently received an extension from the U.S. Bureau of Industry and Security to continue our operation in Nanjing. We are currently in the process of applying for Validated End-User authorization, and expect to receive a permanent authorization in the near future. From a cost perspective, the initial cost of overseas fabs are higher than TSMC fab in Taiwan, due to, first, smaller fab scale. Second, higher costs throughout the supply chain. And third, the early stage of semiconductor ecosystem overseas, as compared to a matured ecosystem in Taiwan. TSMC's responsibility to manage and minimize the cost gap to maximize the return for our shareholders.
Our pricing will also remain strategic to reflect our value, which includes the value of geographic flexibility. We'll also work closely with government to secure their support. At the same time, we are leveraging our fundamental competitive advantage of manufacturing technology leadership, large volume, economies of scale to continuously drive our cost down. By taking such actions, TSMC will have the ability to absorb the higher cost of overseas fabs and still deliver the long-term gross margin of 53% and higher, and sustainable ROE of greater than 25%. We remain firm in our commitment to maximize the value for our shareholders. Now, let me talk about N3 and N3E ramp-up and progress. Our 3nm technology, the most advanced semiconductor technology in both PPA and transistor technology.
N3 is already in volume production with good yield, and we are seeing a strong ramp in the second half of this year, supported by both HPC and smartphone applications. We reaffirm N3 will contribute mid-single-digit percentage of our total wafer revenue in 2023, and we expect a much higher percentage in 2024, supported by robust demand for multiple customers. N3E will leverage the strong foundation of N3 to further extend our N3 family with enhanced performance, power, and yield, and provide complete platform support for both HPC and the smartphone applications. N3E has passed qualification and achieved performance and yield targets, and will start volume production in fourth quarter of this year. We also continue to provide a further enhancement of N3 technology, including N3P and N3X.
With our strategy of continuous enhancement of our 3nm process technologies, we expect strong multi-year demand from our customers, and we are confident that our 3nm family will be another large and long-lasting node for TSMC. Finally, I will talk about the N2 status. The recent surge in AI-related demand supports our already strong conviction that demand for energy-efficient computing will accelerate in an intelligent and connected world. Thus, the value of a technology platform is expanding beyond the scope of geometry shrink alone and increasing toward greater power efficiency. In addition, as process technology complexity increases, the lead time and engagement with customer also start much earlier. As a result, we are observing a strong level of customer interest and engagement at our N2, similar to or higher than N3 at a similar stage from both HPC and smartphone applications.
Our 2nm technology will be the most advanced semiconductor technology in the industry, in both density and energy efficiency when it is introduced in 2025. Our N2 technology development is progressing well and on track for volume production in 2025. Our N2 will adopt nanosheet transistor structure, which has demonstrated excellent power efficiency. N2 will deliver full node performance and power benefit to address the increasing need for energy-efficient computing. As part of N2 technology platform, we also develop N2 with backside power via solution, which is the best suited for HPC sub-applications. We are targeting backside power via to be available in the second half of 2025 to customers with production in 2026. With our strategy of continuous enhancement, N2 and its derivative will further extend our technology leadership way into the future. This conclude our key message, and thank you for your attention.
Jeff Su (Director of Investor Relations)
Thank you, C.C. This concludes our prepared statements. Before we begin the Q&A session, I would like to remind everybody to please limit your questions to two at a time, to allow all participants an opportunity to ask their questions. Should you wish to raise your questions in Chinese, I will translate it to English before management answers your question. For those of you on the call, if you would like to ask a question, please press the star then one on your telephone keypad now. If at any time you would like to remove yourself from the questioning queue, please press star then two. Now, let's begin the Q&A session. Operator, can we please proceed with the first caller on the line? Thank you.
Operator (participant)
Yes, the first one to ask question, Gokul Hariharan from JPMorgan.
Gokul Hariharan (Managing Director)
Yeah, hi. Congratulations on the great result, and thanks for the details on N3 and N2. My first question is on the technology leadership. Given we are hearing a lot of competitive messaging from your U.S. IDM competitor/customer in the last few months, Intel seems to think that they will be getting into technology, or process technology leadership in 2025. Just wanted to hear, what does TSMC think of Intel's claim? And when TSMC thinks about customer engagement, do you feel you will lose a little bit of market share to Intel when it comes to the N2 or the first generation of nanosheet transistors? Or you think your very high market share in N3 will continue into N2? That's my first question.
Jeff Su (Director of Investor Relations)
Okay, thank you, Gokul. Please allow me to summarize your first question. So Gokul's first question is about technology leadership and competition, with, I think particularly IDM. He notes, this IDM is very messaging about taking over process technology leadership from TSMC. And so Gokul's question is: How do we see this? Are we concerned that we will lose market share at nanosheet or N2 to this IDM, given their claims of regaining process technology leadership? Is that correct, Gokul?
Gokul Hariharan (Managing Director)
Yeah, that's right. Thanks.
Jeff Su (Director of Investor Relations)
Okay.
C.C. Wei (CEO)
Well, Gokul, this is C.C. Wei. Let me answer your question with a very simple answer. Say no. But, well, I will stay a little bit long. Actually, we do not underestimate any of our competitors or take them lightly. Having said that, our internal assessment shows that our N3P, now, I repeat again, N3P technology demonstrated comparable PPA to 18A, my competitor's technology. But with an earlier time to market, better technology maturity, and much better cost. In fact, let me repeat again, our 2nm technology without backside power is more advanced than both N3P and 18A, and will be the semiconductor industry's most advanced technology when it is introduced in 2025. Does that answer your question, Gokul?
Gokul Hariharan (Managing Director)
Okay, that's, that's quite clear. Thank you very much. Could you talk, also talk about... My second question is, could we talk a little bit about the AI-related demand? You've seen a pretty strong demand on the data center side, and you've talked about AI being about 6% of revenues this year, mostly on the data center side. Are we starting to see more engagement on AI demand on edge devices? Based on TSMC's expectations, is this going to be a big growth driver in the next one to two years for TSMC's leading edge AI devices, sorry, AI on edge devices? Do you think that that is a bigger driver for you?
Jeff Su (Director of Investor Relations)
Okay, thank you, Gokul. So Gokul's second question is on AI-related demand. He notes, of course, that we have talked last time also about our AI-related demand outlook, and particularly focused on what we call server AI processors, or Gokul referring to data centers. So his question is really more about on the edge devices. Are we starting to see AI-related demand for edge devices? Do we expect this to be a big growth driver in the next one to two years for our leading-edge technologies as well?
C.C. Wei (CEO)
Well, the answer is also very simple: Yes. We do see some activities from customers who add AI capability in end devices such as a smartphone and PCs, through neural engine and AI on PC, whatever. And we certainly hope that this one will add to the growth, help TSMC more strengthen under our AI's business.
Gokul Hariharan (Managing Director)
So, C.C., do you see that happen in the next one year, or is it something that will happen in a more longer term horizon? Just wanted to understand where, when to think about the cadence of this growth.
C.C. Wei (CEO)
Okay, let me answer briefly. It started right now, and we were expected that the more and more customer will put that AI's capability into the end devices, into their product.
Gokul Hariharan (Managing Director)
Got it. Yeah. Thank you very much.
Jeff Su (Director of Investor Relations)
Okay. Thank you, Gokul. Operator, can we move on to the next participant, please?
Operator (participant)
Next one to ask question, Charlie Chan from Morgan Stanley.
Charlie Chan (Analyst)
Hi, good afternoon, C.C., Mark, and Jeff. So my first question is about the cycle recovery. So much appreciate your comments about end demand. So my question is about when do you expect there will be an uptick of the fab utilization, assuming demand is stabilizing and also inventory get back to the healthy level? Because it's just very hard to believe your fab utilization outside of leading edge will stay at only, you know, 70%, 80%. So first question is about do you see that overall fab utilization to pick up at any time soon? Thank you.
Jeff Su (Director of Investor Relations)
Okay. So Charlie, I think your first question is sort of, if I'm correct, around the cycle, and in terms of, how do we see the cycle and the recovery? When, you know, do we see the fab utilization picking up, which really is a function of, I guess, do we see the cycle bottoming out, and, and when do we expect the recovery? Is that correct?
Charlie Chan (Analyst)
Yes. Thank you.
C.C. Wei (CEO)
Well, Charlie, this is C.C. Wei again. Let me answer your question. As I said, we do observe some early signs of demand stabilization in PCs and smartphone end market. Those two, segment are the biggest segment for TSMC's business. We want to say that, 2024 will be a very healthy growth. But right now, did we see the bottom? Very close. Very close. We want to, I cannot give you a number, but it's because it's too early to call it a sharp rebound. But, even with, memory environment remain uncertain, we in customers are inventory controlling, first half of 2024. Having said that, we already said that we are strong technology leadership, and a broad customer base.
Those two are unique and specific to TSMC, enable our customer to win business in their end market, and TSMC to continues to deliver healthy growth. That's why we can do better than overall industry, and that's why we have a confidence that we will have a healthy growth next year.
Charlie Chan (Analyst)
Okay. Okay, thank you. Yeah, so just, I want to, kind of, verify, because we do see some green shoots and, some rush orders, to wafer foundry sector. Thank you. But, second question is also about, AI. My question is that, you know, over the past, three months, do you see any upward revision of the forecast, you know, maybe from the GPU or just the custom chip? And I know it's a very, very, recent, right? Just, two days ago, the U.S. had put some additional export control on the AI shipment to China. Do you think that is going to have any, kind of near-term or long-term impact, to your AI, semi revenue, growth assumption? Thanks.
Jeff Su (Director of Investor Relations)
Okay. Thank you, Charlie. So Charlie's second question is related to AI, two-parter. First, do we see over the last three months... I think his words were: "an upward revision in the demand, from AI in the last three months." And then he wants to know, given the recent, additional, regulations announced, what would the impact to the AI demand be to TSMC, both for the short-term and the long-term?
C.C. Wei (CEO)
Charlie, the AI demand continues to grow stronger and stronger. So from TSMC point of view, now we have a capacity limitation to support them, to support the demand. We are working hard to increase the capacity to meet their demand. That's for one thing. Now, U.S. government put a new regulation, and... For some of the product cannot be shipped to mainland China. However, it is, you know, just for a couple of days, we are still in evaluating the-- we are still doing our assessment. But so far, we can tell you that the impact to TSMC is limited and manageable, at least for the short term. For the long-term, we are still evaluating what is the consequence.
Charlie Chan (Analyst)
Got it. Yeah, so, so actually, there was a one embedded question about the custom chip. So may, may I know your perspective about, about this custom chip, long-term, may kind of gain share or outgrow GPU products? So, so what was your assumption for this custom chip in terms of the revenue contribution within AI or to TSMC? May I ask you as a follow-up?
C.C. Wei (CEO)
Okay. Let me answer it. Whether customer develop the CPU, GPU, AI accelerator, or ASIC for all the type of, for AI applications, the commonality is that they all require usage of leading-edge technology with stable yield delivery to support larger die size, and a strong foundry design ecosystem. All of those are TSMC's strengths. So, we are able to address and capture a major portion of the market in terms of a semiconductor component in AI.
Charlie Chan (Analyst)
Okay. Okay, thank you.
Jeff Su (Director of Investor Relations)
Okay, thank you, Charlie. Operator, can we move on to the next participant, please?
Operator (participant)
Next one to ask question, Bruce Lu from Goldman Sachs.
Bruce Lu (Analyst)
Okay, thank you for taking my question. I think the question is, is try to ask about the, outlook for next two years. I think, I do recall that, management mentioned about like 15%-20% revenue CAGR from 2021 to 2026. The smartphone business, supposed to be, you know, in line or slightly below the corporate average in terms of the growth rate. But, you know, the smartphone business was down meaningfully in 2023. Do we expect to see a sharp rebound, you know, for the smartphone business to get back to the, corporate average in terms of growth rate? Also, that the management also mentioned that the backend business will grow in line with the corporate average.
Will we see a much stronger growth from the backend business in the coming two years?
Jeff Su (Director of Investor Relations)
Okay. So, Bruce's question really is looking at... We have indeed, you are right, Bruce, we had said we will grow between 15%-20% revenue CAGR in U.S. dollar terms from 2021 to 2026. So Bruce's question wants to break down the components here to look at smartphone in particular, given that it has, you know, been a slower growing market these last few years. How do we see the growth of the smartphone market the next one to two years in the context of this CAGR? And then also, I think Bruce is also asking about the backend growth. We have said previously it will grow slightly faster than the corporate average. What is the current expectation now also for the next one to two years? Is that correct, Bruce?
Bruce Lu (Analyst)
Yes, thank you.
Wendell Huang (VP and CFO)
Right. Bruce, this is Wendell. Yeah, in the next two to three years, backing up to 2021 to 2026, we still expect that the smartphone, as a whole, will grow slightly slower than the corporate average. We still think that HPC will be the strongest one and will be the major growth contributor to our multi-year growth. This is your first question. As to the growth of the backend business, we still expect that the backend business as a whole will grow slightly faster than the corporate average in the five-year time period.
Bruce Lu (Analyst)
I see. Thank you. So the next question is for the technology cadence. I mean, for TSMC, you know, for revenue contribution for 5nm, we start to see the meaningful revenue contribution for 5nm starting at third quarter 2020, and 3nm is third quarter 2023. So the cadence, it looks like, is longer for 3nm versus 5nm and 7nm. What is the technology cadence moving forward? Are we able to see a meaningful revenue contribution on 2nm in two-year timeframe or three years timeframe, though? I think the technology migration cadence is an important indicator as well.
Jeff Su (Director of Investor Relations)
Okay, thank you, Bruce. So Bruce's second question, again, as he said, is around the technology cadence. He notes that, 5nm started contributing revenue in 3Q 2020, but, I think you're saying 3nm revenue is contribution 3Q 2023. So the cadence is growing longer to kind of three years between 5nm and 3nm. So what will be the technology cadence in the future, and thus, for 2nm, when should we expect meaningful revenue as well? Is that correct, Bruce?
Bruce Lu (Analyst)
That's correct.
Jeff Su (Director of Investor Relations)
Okay, thank you.
C.C. Wei (CEO)
Okay, Bruce, let me answer the question. I think that we developed the technology to meet the customers' demand. That's a first priority to us. But then different customer may have a different product schedule consideration. And as time goes by, the technology complexity actually become more and more complicated, and our customer will design their product and react to the market situation. So let me answer the question that's in a very simple way. TSMC's technology cadence remain constant, and to support our customers' growth. But whether we got the same amount or same percentage of the revenue, it will depend on customers' product schedule.
Bruce Lu (Analyst)
But the follow-up question is that, if the customer doesn't really need the advanced technology, you know, as fast as before, maybe we slow it down a bit, which will make a better returns, right?
Jeff Su (Director of Investor Relations)
So Bruce's follow-up is, so if the customers do not need the leading node as fast or as soon as before, then slow down the cadence, does that mean we will see better returns?
C.C. Wei (CEO)
Well, we don't slow down our technology development per se. We might slow down our capacity expansion according to customers' demand. Did I answer your question, Bruce? That's it. That's what we are doing right now.
Bruce Lu (Analyst)
I see. Understand. Thank you.
Jeff Su (Director of Investor Relations)
Okay, thank you. Operator, can we move on to the next participant, please?
Operator (participant)
Yes, the next one, we have Laura Chen from Citi.
Laura Chen (Research Analyst)
Hello. Hi, good afternoon. Thank you for taking my question. I think my question is also similar to what Bruce mentioned about the capacity expansion plan. As we see that healthier inventory situation right now, and at the same time, the most advanced process now depends on customers' demand. So, just want to get your feeling about the overall, the CapEx outlook or capacity outlook into the next two years. Do you feel that will be better to resume the year-on-year CapEx next year or later, considering there's still quite a strong demand on N3, N2 ramp-up? At the same time, the most advanced now seems you will see maybe two times more expensive on N2 versus N3. So, my question is just about the future capacity expansion plan.
Yeah, thank you.
Jeff Su (Director of Investor Relations)
Okay, so Laura's first question, again, is on the capacity expansion plan. She notes that, of course, the inventory, as we said, is becoming healthier, but also with N3 and N2. So she really wants to know what is the CapEx and capacity outlook plan for the next one to two years.
Wendell Huang (VP and CFO)
Right. Hi, Laura, it's Wendell. C.C. just mentioned our capacity plan will really depends on the customer's product plan. Now, in terms of CapEx, what we can see now is that we, in the past few years, have invested very heavily to capture the growth in the next few years. And as we begin to harvest those investments, we expect the increase of our CapEx to be leveling off in the next few years. That doesn't mean the dollar amount is going to reduce, but the capital intensity is expected to decline in the next few years. That's what we can see at this moment.
Laura Chen (Research Analyst)
Thank you, Wendell. I recall that previously we mentioned about, like, we target longer-term to back to, like, mid-30s for our CapEx intensity. So, is any possibility we see which we achieve that target next year?
Wendell Huang (VP and CFO)
It's, first of all, it's not a target. It, it's a forecast-
Laura Chen (Research Analyst)
Okay.
Wendell Huang (VP and CFO)
based on the customer's demand. And secondly, it's like, three or five years out. It's not the immediate next year.
Laura Chen (Research Analyst)
Okay, thank you. Very clear. And also my second question is about N2 progress. Appreciate C.C.'s previous sharing on the progress and also the backside power timeline. I'm just wondering that what would be the most challenging part if we migrate to, like, a backside power? And also, since the transistor density will become totally different on nanosheet. So I'm just wondering that the clients in migration or intention to adapt the most advanced node into next two, three years. And what will be the most challenging in technology perspective? Thank you.
Jeff Su (Director of Investor Relations)
Okay, so Laura, let me make sure I got this right. So your second question is about N2, and you want to know, with the adoption of backside power rail, what is the most challenging part from a technology perspective, and then how do we see the customer adoption?
Laura Chen (Research Analyst)
Yes.
Jeff Su (Director of Investor Relations)
Okay.
Laura Chen (Research Analyst)
Correct. Thank you.
C.C. Wei (CEO)
Laura, I answer that, you know, as a technology moving into more and more advanced node, the challenge is always there. Technology complexity increased dramatically, but we can do it, no doubt about it. And we are still remain the technology leadership in this industry. If you ask me what is the most challenging part, I would say it's cost. I mean, that's you look at it today, inflation, everything, and the tool have become more and more expensive. Although we can do it on time to meet customers requirement, our challenge right now, actually, I would say, number one, cost. I want to reduce the cost so more customer can afford it. But even with that, actually, we have a lot of customer interested and engaged with the TSMC today.
Actually, probably higher than the N3 at a similar stage. Okay. Did I answer your question?
Laura Chen (Research Analyst)
Okay. Thank you.
C.C. Wei (CEO)
Yeah.
Laura Chen (Research Analyst)
Yes, very clear. Thank you very much, C.C.
Jeff Su (Director of Investor Relations)
Okay, thank you, Laura. Operator, can we move on to the next participant, please?
Operator (participant)
Right now, we have Brett Simpson from Arete Research.
Brett Simpson (Partner and Co-Founder)
Thanks very much. I had a question for C.C., regarding the hyperscalers. Major U.S. hyperscalers are hiring a lot of chip designers at the moment, and looking to make their own AI silicon, going direct to TSMC, much like Apple has done over the years. Is TSMC generally supportive of this trend or not? And can you give us your perspective as to whether hyperscalers have the in-house IP and skills to cut out the ASIC suppliers or not, and go direct to TSMC? Thank you.
Jeff Su (Director of Investor Relations)
Okay. Brett, thank you. So Brett's first question is, looking at his observation, U.S. hyperscale companies are hiring a lot of people to do AI custom chips, silicon, and working directly or coming directly to work with TSMC. So his question is, "Does TSMC support such efforts? And how do we see such type of customers, I guess?" Is that your question, Brett?
Brett Simpson (Partner and Co-Founder)
Yeah, generally, just share your perspective on how you see this part of the business developing at TSMC. Thank you.
C.C. Wei (CEO)
Hi, Brett. Okay, those are hyperscalers. I don't comment on the specific customer, but all, all we know or our fundamental rule is, whether customer develop the CPU, TPU, AI accelerator, or ASIC, for their own application or for any purpose in the AI area, we will support them, actually. And because of our technology leadership and our good manufacturing, so we are able to address and capture a major portion of the market. And so, you are asking, so whether we support it or not, we support every customer all over the world.
Brett Simpson (Partner and Co-Founder)
Okay, thanks. That's very clear. And maybe just as a follow-up, I wanted to ask about some of the areas in the quarter that were weaker than expected, namely 7nm. I think it's half year-on-year, and also automotive that saw a decline sequentially, a meaningful decline sequentially. Can you just help us understand how you build back up 7nm? You know, what led to the weakness, and what's happening in automotive, and how do you assess prospects for automotive over the next, you know, six to nine months or so? Thank you.
Jeff Su (Director of Investor Relations)
Okay, so two parts to Brett's question. Maybe I'll start with the second. But anyway, looking at automotive demand and the weakness in the past quarter, how do we see the automotive demand? And then also his question is about 7nm, also year-on-year, sharp revenue decrease. So how do we see the outlook for 7nm as well?
C.C. Wei (CEO)
Well, let me answer the question on automotive demand. In fact, in the past three years, automotive demand has very strong, and we deliver whatever they ask, and today, I think it, the automotive demand already entered the inventory adjustment mode in the second half of 2023. However, we still expect the automotive demand wide increase again in 2024, because the more and more EV, more and more functionality being added to automotive, and that's what we saw. Now, talking about the N7, the 7nm technology, why we have such a low utilization or the revenue decrease? It's go beyond our initial, our original plan because of we expect the N7 to be very fully utilized even now, but it is not.
Let me answer the question, because we suddenly have, in 10 years, you know, the smartphone demand dropped dramatically from about 1.4 billion units to about 1.1 billion now. So that exactly, in this time frame, the N7's utilization has been impacted, and followed by one major customer who delayed their product introduction. And so that's why we have a low utilization. But seeing that, we are confident to backfill our 7, 6nm capacity with the additional wave of specialty demand from a consumer, RF, connectivity, and other applications, and will return to a healthy level of utilization over the next several years. This is very similar to a situation that we have a 28nm back in 2018 and 2019 timeframe.
Okay, at the beginning, it was underutilized for a period of time, and we worked hard to with our customer, and then for developing some specialty technologies, and then now we have to expand 28 nanometers, the specialty capacity. That's the same kind of a story. Brad, did I answer your question?
Brett Simpson (Partner and Co-Founder)
Thank you.
C.C. Wei (CEO)
Okay, thanks a lot.
Brett Simpson (Partner and Co-Founder)
Yep.
C.C. Wei (CEO)
Yep.
Brett Simpson (Partner and Co-Founder)
Thanks very much.
Jeff Su (Director of Investor Relations)
All right, Brad, thank you. Operator, can we move on to the next participant, please?
Next one to ask questions, Brad Lin from Bank of America.
Brad Lin (Director)
Thank you for taking my question. So first of all, congrats on the strong result, and then also the impressive gross margin. So I have two questions. One is on the end device AI, edge AI, and the other is on the CPO. So appreciate the management's constructive comments on growth outlook on the edge AI. So, besides the well, interesting engagement with the clients, what are the implications for the wafer consumptions for the firm? And also, on the computing power and energy consumption angle on the end device with AI, in the additional AI functions, should we expect it to reaccelerate the node migration for the end devices? That's my first question. Thank you.
Jeff Su (Director of Investor Relations)
Okay, so Brad's first question is about edge and end device AI. He wants to know what is the implications for wafer consumption, and then with the increasing need for energy efficiency and power, he is wondering, does this re-accelerate or increase the node for... I guess, his words is, node migration or adoption of leading-edge technologies.
C.C. Wei (CEO)
Well, the edge device start to, that's including smartphone and PCs, start to incorporate the AI functionality inside. You know, we observe some of the neural engines has been added increasingly. So, the die size will increase, even the unit did not increase dramatically, but the die size, you know, is in mid-teens. No, not, I mean, mid-single digit is a die size increase so far.
I expect that this kind of trend will continue. So, more and more application of the, on the AI side, will be incorporated into those, kind of edge device, and that, that one need have very power efficient, chips, to put into the, edge device, especially when it is a mobile. So I do expect, from my, my own perspective, I do expect that, my customer will move into the leading edge node more and more, quickly to compete in the market.
Operator (participant)
Okay.
Brad Lin (Director)
Thank you very much, C.C. So, a bit of a follow-up is that, well, now it accounts for some, well, mid-single digit of the die size incremental for a chip. So does that, or are we seeing that to enlarge to something like, mid-teens or, or, well, even bigger in the, well, mid to long-term?
Jeff Su (Director of Investor Relations)
So Brad's quick follow-up is if, you know, the AI portion is kind of mid-single digit now, how should we expect—can we expect mid-teens or what type of percentage in a few years' time?
C.C. Wei (CEO)
Well, I will answer the question. Actually, we see the increase on the die size, but we cannot nail down the, we say, the mid-single digit, but I expect it start to increase. And whether that will increase our forecast on our growth or something, it's still too early to say at this moment.
Wendell Huang (VP and CFO)
Yeah, because
C.C. Wei (CEO)
But
Jeff Su (Director of Investor Relations)
Yeah, sorry.
Wendell Huang (VP and CFO)
Yeah, but we're still quantifying the impact from this development. So we're maintaining the previous statement that we expected to grow to about mid in five years, about mid-single digits. I'm sorry, mid-teens of our revenue.
Jeff Su (Director of Investor Relations)
Yeah. I think, Brad, probably just very simply, as we said, edge AI, we do see some activity. It will drive silicon content, but this will occur over time, okay? And we don't have any quantitative number to share. All right?
Brad Lin (Director)
Got it. Thank you.
Jeff Su (Director of Investor Relations)
Okay. What is your second question?
Brad Lin (Director)
Okay, so the second question is on CPO. So basically, we have learned that TSMC is doing quite well, and also leading the industry in CPO or so-called silicon photonics, and has introduced a platform to clients with the technologies. So may we learn that the opportunities and implications of the new, new technology for the industry and for our firm? And also, should we expect the platform to offer additional competitive advantage for TSMC in the mid to long run? Thank you.
Jeff Su (Director of Investor Relations)
So, Brad, your second question is on silicon photonics. Is that correct?
Brad Lin (Director)
TSMC, going forward in the future.
C.C. Wei (CEO)
Okay, let me answer that question. Silicon photonics actually is a growing its importance because of just a large amount of data need to be collected, processed, and transferred in an energy-efficient manner. Silicon photonics tends to be the best to fit that role. And TSMC have been working on silicon photonics for years, and most importantly, we're collaborating with multiple leading customer and to support their innovations in this field. It takes a lot of time to develop the technology and to build the capacity. And when we increase the volume production, we believe that TSMC's silicon photonics will be the best technology and when customer roll out all their innovations. But as I said, it's gradually increasing in their activity and gradually increasing their demand as of today.
Brad Lin (Director)
Got it. Thank you very much.
Jeff Su (Director of Investor Relations)
All right. Thank you. Operator, can we move on to the next caller, please?
Charlie Chan (Analyst)
Next one, we have Sunny Lin from UBS.
Sunny Lin (Analyst)
Good afternoon. Thank you very much for taking my questions. So my first question is on advanced packaging. Incrementally, we are hearing more customer interest in the adoption to achieve better heterogeneous integrations. But want to get your thoughts on what could be the potential impact of customers relying a bit more on packaging to improve the system performance, and perhaps last on the process migrations, given cost considerations. Meanwhile, SoIC has been introduced for quite a while, whereas the customer adoption still seems to be limited at this point. And so when should we expect a more meaningful pickup of SoIC, and what could be the major catalyst? Thank you.
Jeff Su (Director of Investor Relations)
Okay. So Sunny, sorry, I may have missed a little bit of the first part, but I think her question is on overall advanced packaging. Looking at this trend and the move to a more, of course, heterogeneous integration, what are the cost implications and how does advanced packaging work and go together with the process technology standpoint? And then also a question about the update or progress of SoIC. Is that correct, Sunny?
Sunny Lin (Analyst)
Well, so maybe if I may, clarify a bit, so for the first part, I wonder if customers may consider relying a bit more on packaging, whereas slowing down a bit on the process migration because of increasing cost.
Jeff Su (Director of Investor Relations)
Okay. So she's asking, will customers... Because of the increasing cost of the process technologies, will customers rely more on advanced packaging as a result?
C.C. Wei (CEO)
Let me answer that. It's not because of increasing of the cost in the more advanced node. It actually, they try to, our customer try to maximize the system performance. That's the major portion. That including the kind of a speed improvement or the power consumption decrease, all those kind of things, put all together. And maybe cost is also part of the consideration, which we notice about. And so more and more customer are moving into the very advanced technology node, and they start to adopt the chiplets approaches. And so you know. That no matter what, TSMC provide the industry-leading solution in both very leading technology and also very advanced packaging technology. And to work with our customer for their product, I have a best system performance.
And the other one is, you are asking about the SoIC, when it will become, a high volume, and more substantial revenue for TSMC. It's, it's coming, it's coming. Actually, the customer already ready to announce, their, new product, which are widely adopt. And I expect, you know, starting from now, and next year, the SoIC will generate revenue, and become of one of the fastest growing advanced packaging solution in the next few years.
Sunny Lin (Analyst)
Got it. Thank you very much. If I may, a quick follow-up. Three months ago, you had a target to double your CoWoS capacities, and just now, you mentioned, AI demand continued to surprise on the upside. So wonder if there's any update, on your CoWoS capacity expansion?
Jeff Su (Director of Investor Relations)
Okay, so I will take this as your second question, Sunny. But as she's asking about CoWoS expansion, we had said that we will double the capacity three months ago. Can we provide an update on the overall CoWoS capacity, and I guess CapEx and capacity go hand in hand. What is our plan?
C.C. Wei (CEO)
Well, Sunny, you know, the last time we said that we will double our CoWoS capacity, we are working very hard and to increase the capacity more than double. But today is limited by my suppliers' capability or their capacity. So we still maintain that we will double our CoWoS capacity by the end of 2024, but the total output actually is more than double from 2023 to 2024 because of a very high demand from our customer. So, extending this kind of a trend, we will continue to increase our CoWoS capacity to support our customer, even into 2025.
Jeff Su (Director of Investor Relations)
Okay, Sunny, does that answer your question?
Sunny Lin (Analyst)
Got it. Thank you very much.
Jeff Su (Director of Investor Relations)
Okay, thank you. Operator
Sunny Lin (Analyst)
Thank you.
Jeff Su (Director of Investor Relations)
can we move on to the next caller, please?
Operator (participant)
Next one, please welcome Mehdi Hosseini from SIG.
Mehdi Hosseini (Senior Equity Research Analyst)
Yes, thanks for taking my question. I understand there are a number of new products that are ramping into year-end and into first half of 2024, in various, for various end markets. I want to understand how the ramp of these new products are to impact the seasonality. Could we see a scenario where in the first half, the ramp of these new products, especially to be at the leading edge, to somewhat offset the seasonal factors? Any thoughts there? I have a follow-up.
Jeff Su (Director of Investor Relations)
All right, Mehdi. Well, Mehdi's first question is, in terms of new products, which of course, customer products we don't comment on, but he said, we're ramping products into the second half, and so how will this ramp of new products go is into, as we go into first half 2024, and can this offset or, or mitigate some of the seasonality?
Mehdi Hosseini (Senior Equity Research Analyst)
Yeah, let me rephrase. The contribution of the co-contribution of customers' new product, and how would that impact, or how could that offset seasonal factors?
Wendell Huang (VP and CFO)
Yeah, Mehdi, I don't think we can comment on specific customer products, but, I can tell you that we're not seeing any dramatic change in the seasonality as of now.
Mehdi Hosseini (Senior Equity Research Analyst)
Okay. Because I look at your year, calendar 2023, and given your Q4 guide, you're actually doing better than what you guided three months ago. You essentially said revenues could be down 10% U.S. dollar, and now it could actually be down by single digits. Is that a combination of a stronger new product ramp and better pricing? Is that a fair assessment?
Jeff Su (Director of Investor Relations)
Okay, so Mehdi is really looking at... He rightly notes that three months ago, we said this year will decline around 10% in U.S. dollar terms. Now, with the fourth quarter, implied guidance is slightly better, so he wants to know what is the implication or behind this.
C.C. Wei (CEO)
Well, let me give you one simple reason. Because our ramp up of N3, because of the demand of N3 is strong, so we ramp up quickly to meet customers' demand, so the final result is better than we expected three months ago.
Jeff Su (Director of Investor Relations)
Yeah. And we have also said that strong ramp of N3
will continue in next year. Okay? That's about all the seasonality color we can give.
Mehdi Hosseini (Senior Equity Research Analyst)
Gotcha. Okay. And then, perhaps, if I were to ask a second question, I just want to better understand your view on your customers', inventory correction. We're reaching a bottom where we don't have any visibility on how quickly they are going to refresh inventory. The slope of the recovery is still not clear. Did I understand you correctly?
Jeff Su (Director of Investor Relations)
So, Mehdi, second question, you would like to clarify. So are we saying that customers' inventory is reaching or approaching a bottom, but the slope of the inventory, is not clear? Is that what we are saying?
Okay. I'll answer the question. Actually, you know, in these couple of months, we start to see the demand stabilize in the PC and smartphone end market. And in fact, we see some kind of a urgent PO ask for more device to be shifted to their place to meet the demand. That give us a hint of their inventory control already become more healthier than we thought. So in terms of uncertain macro, it probably will continue, but our expectation is very close to a healthy condition. So that's why we say we can expect 2024 to be a healthy growth year for TSMC.
Okay.
C.C. Wei (CEO)
Mehdi, did I answer your question?
Mehdi Hosseini (Senior Equity Research Analyst)
Great. Thank you.
Jeff Su (Director of Investor Relations)
Okay, in the interest of time
Mehdi Hosseini (Senior Equity Research Analyst)
Yes, thank you.
Jeff Su (Director of Investor Relations)
Thank you, Mehdi. In the interest of time, we'll take questions from the last two participants, please.
Operator (participant)
Next one to ask question is Krish, Krish Sankar from TD Cowen.
Krish Sankar (Managing Director)
Yeah, hi. Thanks for taking my question. I have two of them. First one is on gross margin. When do you expect N3 to reach corporate average gross margin? And, as you look into next year, as more mature node capacity comes online across the industry, how do you think about mature node gross margins also? And I have a follow-up after that.
Jeff Su (Director of Investor Relations)
Okay, so Krish's first question is on gross margin. When do we expect 3nm, or N3, I should say, to reach the corporate average gross margin? And how do we see the gross margin trend for the more mature nodes?
Wendell Huang (VP and CFO)
Yeah, Krish, in the past, our leading nodes normally reach gross margins corporate margin in about eight quarters. But as we progress with more and more leading nodes, it will become more and more challenging because of several reasons. Well, first of all, our corporate margin is higher than before. And secondly, the leading node, as I just said, is becoming more and more complex. And also, in the past few years, the inflation pressure that was not expected also contribute the higher costs in the N3. So it's gonna be pretty challenging for future leading nodes to reach corporate margin as in before, like before, in the same time frame. The mature nodes, I can tell you that our mature nodes are the
Krish Sankar (Managing Director)
Okay.
Jeff Su (Director of Investor Relations)
Yeah.
Krish Sankar (Managing Director)
That's very helpful. Thank you for that. And then, and then as a follow-up, on Arizona, you mentioned that you'd hired about 1,100 local employees. I'm kind of curious, is that critical mass enough for you to start 4nm production, or do you have another target level of employees before you can actually start getting the production, since you're still maintaining the output to be in first half of 2025?
Jeff Su (Director of Investor Relations)
Okay.
Krish Sankar (Managing Director)
Thank you.
Jeff Su (Director of Investor Relations)
So thank you, Krish. So Krish's second question is about our first fab in Arizona. He notes that we have said we hired, you know, 1,100 local employees. So his question, is this enough critical mass or enough people basically, to support the ramp of the first fab as we plan, as we said today, in first half 2025?
Of course. We continue to hire the local talent to join the TSMC fab in Arizona. So when we start to have a volume production, we are confident that we will have enough resources to support our ramp-up in Arizona.
Okay. All right.
Krish Sankar (Managing Director)
Thank you.
Jeff Su (Director of Investor Relations)
Thank you, Krish. Operator, can we move on to the last participant, please?
Operator (participant)
Yes, the last one to ask question, Charles Shi from Needham.
Charles Shi (Senior Analyst)
Hi, thank you for squeezing me in. First off, I really want to congratulate TSMC for delivering good results for Q3 and a very good guidance for Q4. But I want to really call out the reported revenue for 5nm in the third quarter. Looks like you are showing some really good countercyclical strength and probably the record high. I want to understand the rebound in the 5nm business in Q3. Is that going to be more in the following quarters? And what's behind that? And the relative, let's say, your expectation, like three to six months ago, when you were reducing your 2023 outlook. Is 5nm doing better than expected? And how has the demand trending in the last two to three months for 5nm?
Thank you.
Jeff Su (Director of Investor Relations)
Okay, so Charles's first question is about 5nm. He's asking in the very near-term, he notes that he saw a very strong sequential revenue increase in the third quarter, so he's wondering what is driving this. And then he's asking about what is the outlook for the next three to six months for 5nm specifically?
Wendell Huang (VP and CFO)
Yeah, Charles, I can share with you the increase in revenue N5 in the third quarter mainly comes from two platforms, HPC and smartphone. HPC also includes the AI-related demand. Smartphone, basically, customers, some customers' product seasonalities. Now, forward-looking wise, I'm not going to share with you, but we will tell you in January what actual the next quarter N5 revenue will be.
Jeff Su (Director of Investor Relations)
The overall revenue?
Wendell Huang (VP and CFO)
Yes.
Jeff Su (Director of Investor Relations)
We don't provide revenue by process node. Okay, what's your second question, Charles?
Charles Shi (Senior Analyst)
Yeah, thanks, Jeff. The other question is about CapEx. It sounds like that you're expecting CapEx on absolute dollar may still grow, going forward. I know that's a long-term comment, but I look at the near-term, TSMC CapEx seems to be running at $7 billion per quarter in the second half, 2023, which kind is at a $28 billion annualized run rate. But if we are expecting total CapEx for 2024 to grow in a dollar term over 2023, it seems like you are expecting a CapEx ramp in 2024. Maybe that's your, you are planning for some of the CapEx ramp in 2024. Is that the right way to think about the CapEx?
Is $7 billion really like a really the bottom level run rate for TSMC CapEx at this point? Thank you.
Jeff Su (Director of Investor Relations)
All right, so Charles' second question is also on CapEx. Basically, he's saying, given the guidance, he's looking at our CapEx is running at about a $7 billion run rate. So he's assuming, or he, you know, although we do not comment on 2024, he's assuming if next year's CapEx dollar amount is going to increase, but if we're running at $7 billion run rate, does that imply $28 billion? How should he reconcile this?
Wendell Huang (VP and CFO)
Charles, every year, the CapEx is invested based on the future opportunity to growth, and we invest it to capture those future opportunities. Too early to talk about 2024, really. We'll share the guidance with you in January quarterly release.
Jeff Su (Director of Investor Relations)
Okay. All right. Thank you, Charles. Thank you, everyone. This concludes our Q&A session. Before we conclude today's conference, please be advised that the replay of the conference will be accessible within 30 minutes from now. The transcript will become available 24 hours from now. Both of these, you, will, are available, and you can find through TSMC's website at www.tsmc.com. So thank you, everyone, for taking the time to join us today. We hope everyone continues to be well, and we hope to see you, join us again in January. Goodbye and have a good day. Thank you.




